Keeping the heat on: Assessing the
potential for demand side management
to alleviate natural gas shortages during
extreme cold.
Jordan Mann, Apex Analytics
Justin Spencer, Apex Analytics
Chris Jackson, PA Consulting
August 4th, 2026
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 2 of 14
Background
An evolving policy landscape in gas regulation has created significant interest in non-pipeline alternative
(NPA) solutions to address gas infrastructure needs. NPAs can defer, reduce, or avoid building of
traditional gas infrastructure.
NPAs seek to address gas infrastructure investment within three broad categories
1. Replacement of Existing Infrastructure
2. Capacity Expansion of Existing Systems
3. System Extension
Opinions expressed in this presentation are of the authors alone and not Xcel Energy.
2
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 3 of 14
Mountain Energy Project Region of Interest
Three key areas of interest include, Grand Lake, Keystone, and Breckenridge. This area includes roughly
30,000 customers. It is very cold here with lows occasionally dropping below 30F.
3
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 4 of 14
Existing Shortfall of Gas Supply
The total system needs over a 10% reduction from peak usage to no longer be constrained, before
accounting for forecasted increases in peak hour consumption.
In prior winters, Xcel has been trucking up LNG and injecting it into the system. Not a feasible long-term
solution.
4
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 5 of 14
Pipelines are Really Expensive
Expanding the pipeline capacity to allow the throughput needed would cost somewhere between $120M
to $350M dollars.
We wanted to explore if there were solutions that could cost less and also save greenhouse gas
emissions, creating a win win scenario for Xcel Customers.
5
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 6 of 14
It’s All About the Heating
Almost all of the load during peak winter conditions is heating based load. As the temperature drops,
most gas loads stay roughly the same, while the heating load increases dramatically. We need a solution
that addresses the heating load specifically.
Annual
Peak Hour
6
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 7 of 14
A Dual Fuel Solution?
The problem can be addressed through any mechanism that saves gas heat on peak. This could include:
• Gas equipment efficiency
• Improvements the building envelope
• Demand Response
• Behavioral Measures
• Full electrification
Dual fuel in the sense that it can either be gas efficiency OR full electrification
Not dual fuel from the perspective of a single hybrid heating system
7
Significant BE/EE/DR is Needed… Are Customers Willing to
Participate?
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 8 of 14
33% of front range (Denver area) and 30% of Mountain customers would consider replacing their gas
equipment with a full electrification heat pump solution. The price sensitivity of these customers is
shown below.
Likelihood to Convert to Heat Pump with
Same Operating Cost
Likelihood to Convert to Heat Pump with $1,000 per
year increase in operating costs and incentives greater
than incremental cost
8
If we can drive participation, which measures are most cost
effective?
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 9 of 14
With incentives equal to full incremental costs, we mapped the cost effectiveness of measures using a
standard RIM test with GHG as an included benefit and electric infrastructure as a cost. In general,
envelope, DR, and gas equipment replacements were more cost efficient than full electrification.
Why not just use the TRC?
• Most customers not eligible to participate
since they are not in the geographic area
that would alleviate the constraint
• Concerns with equity/fairness
9
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 10 of 14
Can BE, EE, and DR solve the shortfall?
Even with incentives equal to the incremental cost of measures, the gas supply shortfall is not fully
addressed by 2033.
10
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 11 of 14
Gas storage as an additional solution
Not being able to address with BE, EE, and DR led the team to include LNG and CNG storage near the
constraint points to inject stored natural gas into the system. This creates an inflection point in 2029,
where policy makers will need to decide whether to fund additional DSM measures to decommission
the onsite storage.
11
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 12 of 14
The Proposed Solution
The solution presented to the Colorado PUC, with support from the Sierra Club, SWEEP, Mountain
Community Coalition, Colorado Energy Office, and PUC staff including aggressive electrification,
efficiency, and DR, paired with gas storage.
The PUC approved a $155M NPA investment with ~$50M dollars dedicated to DSM.
12
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 13 of 14
What this means for participants
Rebates are large for customers willing to participate.
Gas equipment rebates are $225 and heat pump rebates are $2,250/ton for air source and $3,300/ton
for ground source in other parts of the state.
Customers could get anywhere from ~20k – 75k for electrification projects, reflecting the high value of
avoiding gas infrastructure.
Source: Xcel Energy Rebates for the Mountain Energy Project, non-exhaustive list
13
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Date Issued August 13, 2026
CLF-011 Attachment 8
Page 14 of 14
Thank You
Follow up questions? Feel free to reach out.
Jordan Mann
[email removed]
Justin Spencer
[email removed]
Chris Jackson
[email removed]
14