Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 1 of 14 Keeping the heat on: Assessing the potential for demand side management to alleviate natural gas shortages during extreme cold. Jordan Mann, Apex Analytics Justin Spencer, Apex Analytics Chris Jackson, PA Consulting August 4th, 2026 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 2 of 14 Background An evolving policy landscape in gas regulation has created significant interest in non-pipeline alternative (NPA) solutions to address gas infrastructure needs. NPAs can defer, reduce, or avoid building of traditional gas infrastructure. NPAs seek to address gas infrastructure investment within three broad categories 1. Replacement of Existing Infrastructure 2. Capacity Expansion of Existing Systems 3. System Extension Opinions expressed in this presentation are of the authors alone and not Xcel Energy. 2 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 3 of 14 Mountain Energy Project Region of Interest Three key areas of interest include, Grand Lake, Keystone, and Breckenridge. This area includes roughly 30,000 customers. It is very cold here with lows occasionally dropping below 30F. 3 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 4 of 14 Existing Shortfall of Gas Supply The total system needs over a 10% reduction from peak usage to no longer be constrained, before accounting for forecasted increases in peak hour consumption. In prior winters, Xcel has been trucking up LNG and injecting it into the system. Not a feasible long-term solution. 4 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 5 of 14 Pipelines are Really Expensive Expanding the pipeline capacity to allow the throughput needed would cost somewhere between $120M to $350M dollars. We wanted to explore if there were solutions that could cost less and also save greenhouse gas emissions, creating a win win scenario for Xcel Customers. 5 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 6 of 14 It’s All About the Heating Almost all of the load during peak winter conditions is heating based load. As the temperature drops, most gas loads stay roughly the same, while the heating load increases dramatically. We need a solution that addresses the heating load specifically. Annual Peak Hour 6 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 7 of 14 A Dual Fuel Solution? The problem can be addressed through any mechanism that saves gas heat on peak. This could include: • Gas equipment efficiency • Improvements the building envelope • Demand Response • Behavioral Measures • Full electrification Dual fuel in the sense that it can either be gas efficiency OR full electrification Not dual fuel from the perspective of a single hybrid heating system 7 Significant BE/EE/DR is Needed… Are Customers Willing to Participate? The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 8 of 14 33% of front range (Denver area) and 30% of Mountain customers would consider replacing their gas equipment with a full electrification heat pump solution. The price sensitivity of these customers is shown below. Likelihood to Convert to Heat Pump with Same Operating Cost Likelihood to Convert to Heat Pump with $1,000 per year increase in operating costs and incentives greater than incremental cost 8 If we can drive participation, which measures are most cost effective? The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 9 of 14 With incentives equal to full incremental costs, we mapped the cost effectiveness of measures using a standard RIM test with GHG as an included benefit and electric infrastructure as a cost. In general, envelope, DR, and gas equipment replacements were more cost efficient than full electrification. Why not just use the TRC? • Most customers not eligible to participate since they are not in the geographic area that would alleviate the constraint • Concerns with equity/fairness 9 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 10 of 14 Can BE, EE, and DR solve the shortfall? Even with incentives equal to the incremental cost of measures, the gas supply shortfall is not fully addressed by 2033. 10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 11 of 14 Gas storage as an additional solution Not being able to address with BE, EE, and DR led the team to include LNG and CNG storage near the constraint points to inject stored natural gas into the system. This creates an inflection point in 2029, where policy makers will need to decide whether to fund additional DSM measures to decommission the onsite storage. 11 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 12 of 14 The Proposed Solution The solution presented to the Colorado PUC, with support from the Sierra Club, SWEEP, Mountain Community Coalition, Colorado Energy Office, and PUC staff including aggressive electrification, efficiency, and DR, paired with gas storage. The PUC approved a $155M NPA investment with ~$50M dollars dedicated to DSM. 12 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 13 of 14 What this means for participants Rebates are large for customers willing to participate. Gas equipment rebates are $225 and heat pump rebates are $2,250/ton for air source and $3,300/ton for ground source in other parts of the state. Customers could get anywhere from ~20k – 75k for electrification projects, reflecting the high value of avoiding gas infrastructure. Source: Xcel Energy Rebates for the Mountain Energy Project, non-exhaustive list 13 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 8 Page 14 of 14 Thank You Follow up questions? Feel free to reach out. Jordan Mann [email removed] Justin Spencer [email removed] Chris Jackson [email removed] 14

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)