Interrogatory responses
Answers to questions 25
Filed by The Connecticut Light and Power Company3 files
Part of docket 26-05-10Files3
BETP-025_Final.pdf
PDF · 143 KB · 4 pagesText searchable
Download BETP-025_Final.pdfRead the text of BETP-025_Final.pdf
BETP-025 Attachment 1 .pdf
PDF · 196 KB · 2 pagesText searchable
Download BETP-025 Attachment 1 .pdfRead the text of BETP-025 Attachment 1 .pdf
BETP-025 Attachment 1 .xlsx
Excel · 38 KBText searchable
Download BETP-025 Attachment 1 .xlsxRead the text of BETP-025 Attachment 1 .xlsx
Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 06, 2026 BETP-025 Attachment 1 Page 1 of 2 DIVISION DISTRICT PROJECT_ NUMBER CENTRAL HARTFORD CD01543 PROJECT_DESCRIPTION 3R04 Contingency Overload Type of Overload (Normal/Cont ingency) Scope Total Cost ($k) ISD Circuit Load Transfer Equipment Upgrade Battery Storage Demand Response Contingency Reconductor 278.4 6/1/2028 3R04 No Yes Yes No Flexible Other Non Wire Reason alternatives were not selected or if no alternatives Intercon Alternative were considered explain why nection No No Preferred option was to upgraded under rated cable 2/0 to 477 and this was the lowest cost compared to other alternatives WESTERN NEWTOWN CD02199 Oxford 26N7 Contingency Overload Contingency Reconductor and Reconfigure 1594 6/1/2028 26N7 Yes Yes No No No No CENTRAL CHESHIRE CD02587 15U2 Contingency Overload Contingency Reconductor & Reconfiguration 1,450.80 6/1/2028 15U2 Yes Yes Yes No No No WESTERN NEWTOWN CD02591 Middle River 28M11 Contingency Overload Contingency Reconfiguration of loop schemes 455.4 6/1/2028 28M11 Yes Yes Yes No No No WESTERN NORWALK CD02660 35A8 Contingency Overload Contingency Reconfiguration 280.2 6/1/2028 35A8 Yes Yes Yes No No No WESTERN NORWALK CD02651 12N15 Contingency Overload Contingency Reconfiguration 352.1 6/1/2028 22N15 Yes Yes Yes No No No EASTERN NEW LONDONCD02654 11Y2 Contingency Overload Contingency Reconductor 695.7 6/1/2028 11Y2 No Yes Yes No No No EASTERN NEW LONDONCD02687 1Q6 Contingency Overload Contingency Reconfiguration 146.3 6/1/2028 1Q6 Yes Yes Yes No No No Alternative selected; reconductor & load transfer, removed an additional contigency overload. Battery storage not submitted as alternative due to being an older project. Preferred option was to upgrade single phase cable with new three phase cable, create a new loop scheme with adjacent circuit and alternatives were more expensive. Option selected: Reconfigure Load Transfer was selected due to lowest cost Option selected: Reconfigure Load Transfer was selected due to lowest cost Option selected: Reconfigure Load Transfer was selected due to lowest cost Prefered Option was chosen after a prudence review and Benefit cost analysis was completed indicating that lowest cost is the best solution Load transfer and cost benefit analysis indicates that the lowest cost option is the best solution WESTERN NEWTOWN West Brookfield 14H1 Overload Contingency Reconductor 336 SC to 556 SC 1064 6/1/2027 14H1 No Yes No No No No Option selected: upgrade with spacer cable vs. open wire. Option selected provided existing resliency with more ampacity. CD02023 Preferred option was to establish a new feeder 30L29 to allow for load transfer from Noera 13H to Todd 30L. This option has the lowest cost per MVA added as compared to alternatives. Project was required to relocate infastructure in the way of the SS Expansion, no alternatives presented Reduce the Load the 14W12 picks up and this was the lowest cost compared to other alternatives Preferred option was load transfer, alternatives were more expensive Option Selected: upgrade conductors, alternatives were more expensive NA New Feeder load transfer Associated w/CS00404 Relocating equipment for CS00604 and CS00607 14W12 Contingency Overload Contingency Reconfiguration 129.6 6/1/2027 14W12 Yes Yes No No No No CD02489 24A17 Normal Overload Contingency Reconfiguration 544.9 6/1/2027 24A17 Yes Yes Yes No No No STAMFORD CD02469 28F2 Overload Contingency Reconductor 1,594.20 6/1/2027 28F2 Yes Yes Yes No No No WESTERN STAMFORD CD02471 11R3 Circuit Overload Contingency Reconfiguration 301.3 6/1/2027 11R3 Yes Yes Yes No No No WESTERN STAMFORD CD02617 28F3 Contingency Overload Contingency Reconfiguration 400.3 6/1/2027 28F3 Yes Yes Yes No No No WESTERN EASTERN STAMFORD DANIELSON CD02739 CD02903 13S6 Circuit Overload 14M7 Normal Overload Contingency Normal Reconfiguration Reconductor 236 630.2 6/1/2027 6/1/2027 13S6 14M7 Yes No Yes Yes Yes Yes No No No No No No Option Selected: Load transfer, alternatives were more expensive Preferred option was load transfer, the lowest cost. The other options required extensive OH & UG reconductoring Preferred option was load transfer, the lowest cost. The other options required extensive OH & UG reconductoring Reconductor option selected : Lowest Cost CENTRAL HARTFORD CD02957 Network Unit 354 - Feeder 134 XFMR Replacement Normal Network Xfmr Replacement 450.9 6/1/2027 1A134 No Yes No No No No Upgrade overloaded network xfmr from 500 kVA to 750 kVA CENTRAL HARTFORD CD02958 Network Unit 355 - Feeder 135 XFMR Replacement Normal Network Xfmr Replacement 498.4 6/1/2027 1A135 No Yes No No No No CENTRAL CHESHIRE CD02172 Farmington 1C19 Contingency Overload Reconductor & Reconfiguration 4,405.10 6/1/2027 1C19 Yes Yes No No No No Upgrade overloaded network xfmr from 500 kVA to 750 kVA Preferred option is the only one that increases capacity on the 1C19 circuit. CENTRAL CHESHIRE CD02087 Noera 13H S/S LCC Load Relief WESTERN NEWTOWN CD02396 West Brookfield 14H S-S Expansion CENTRAL TOLLAND CD02570 WESTERN NORWALK WESTERN LCC S/S Contingency 2,952.70 6/1/2027 30L29 Yes Yes Yes No No No 1000 6/1/2027 14H1 No Yes No No No NoPage 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 06, 2026 BETP-025 Attachment 1 Page 2 of 2 e e DIVISION DISTRICT PROJECT_NU MBER PROJECT_DESCRIPTION START_CONSTR_Y R CENTRAL WESTERN CENTRAL WESTERN WESTERN WESTERN EASTERN EASTERN WESTERN HARTFORD NEWTOWN CHESHIRE NEWTOWN NORWALK NORWALK NEW LONDON NEW LONDON NEWTOWN CD01543 CD02199 CD02587 CD02591 CD02660 CD02651 CD02654 CD02687 CD02023 3R04 Contingency Overload Oxford 26N7 Contingency Overload 15U2 Contingency Overload Middle River 28M11 Contingency Overload 35A8 Contingency Overload 12N15 Contingency Overload 11Y2 Contingency Overload 1Q6 Contingency Overload West Brookfield 14H1 Overload 2028 2028 2028 2028 2028 2028 2028 2028 2027 CENTRAL WESTERN CENTRAL WESTERN WESTERN WESTERN WESTERN WESTERN EASTERN CENTRAL CENTRAL CENTRAL CHESHIRE NEWTOWN TOLLAND NORWALK STAMFORD STAMFORD STAMFORD STAMFORD DANIELSON HARTFORD HARTFORD CHESHIRE CD02087 CD02396 CD02570 CD02489 CD02469 CD02471 CD02617 CD02739 CD02903 CD02957 CD02958 CD02172 Noera 13H S/S LCC Load Relief West Brookfield 14H S-S Expansion 14W12 Contingency Overload 24A17 Normal Overload 28F2 Overload 11R3 Circuit Overload 28F3 Contingency Overload 13S6 Circuit Overload 14M7 Normal Overload Network Unit 354 - Feeder 134 XFMR Replacement Network Unit 355 - Feeder 135 XFMR Replacement Farmington 1C19 Contingency Overload 2024 2027 2027 2027 2027 2027 2027 2027 2027 2027 2027 2024 2024 2025 2026 2027 2028 278 1,594 1,451 455 280 352 696 146 76 383 412 1,001 CurrFutYrs FinTotalProject APPRV_STATUS 1,064 278 1,594 1,451 455 280 352 696 146 1,064 278 1,594 1,451 455 280 352 696 146 1,064 Partial CPAC Approved Partial CPAC Approved Partial CPAC Approved Partial CPAC Approved Partial CPAC Approved Partial CPAC Approved Partial CPAC Approved Partial CPAC Approved Partial CPAC Approved 2,877 1,000 130 545 863 301 400 236 630 451 498 2,609 2,877 1,000 130 545 863 301 400 236 630 451 498 3,610 2,953 1,000 130 545 863 301 400 236 630 451 498 4,405 Partial CPAC Approved Full Funding ACT Requested Partial CPAC Approved Partial CPAC Approved Full CPAC Ready Partial CPAC Approved Design CPAC Approved Partial CPAC Approved Design CPAC Approved Design CPAC Approved Design CPAC Approved Supplemental Approved Previously Submitted to PURA On the PREVIOUS PURA SUBMISSION On the PREVIOUS PURA SUBMISSION On the PREVIOUS PURA SUBMISSION On the PREVIOUS PURA SUBMISSION On the PREVIOUS PURA SUBMISSION On the PREVIOUS PURA SUBMISSION On the PREVIOUS PURA SUBMISSION On the PREVIOUS PURA SUBMISSION a a a a a a a a a b DDE LEAD Type of Overload (Normal/Contingency) Scope Total Cost ($k) Labor Cost ($k) Outside Services Cost ($k) Material Cost ($k) Removals Cost ($k) Other Cost ($k) Indirect subtotal ($k) Contingency ($k) Study Year (when Partial PAF approved at CPAC) Forecast Year ISD c Earliest NWA deployment Final Year of NWA analysis Syed Separy Jas Separy Peart Peart Separy Separy Separy Contingency Contingency Contingency Contingency Contingency Contingency Contingency Contingency Contingency Reconductor Reconductor and Reconfigure Reconductor & Reconfiguration Reconfiguration of loop schemes Reconfiguration Reconfiguration Reconductor Reconfiguration Reconductor 336 SC to 556 SC 278.4 1594 1,450.80 455.4 280.2 352.1 695.7 146.3 1064 11.7 66.7 60.7 19.1 11.7 14.7 29.1 6.1 91.2 94.8 542.4 493.8 155 95.4 119.8 236.8 49.8 120.3 47.5 272.1 247.7 77.8 47.8 60.1 118.8 25 384 21 120.4 109.6 34.4 21.2 26.6 52.6 11.1 25 1.8 0 0 0 1.9 0 4.6 1 0 101.6 545.2 529.3 166.1 102.2 128.5 253.8 53.4 440 0 10.6 9.6 3 0 2.3 0 0 3.6 2025 2023 2024 2025 2025 2025 2025 2025 2023 N/A N/A N/A N/A N/A N/A N/A N/A N/A 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2028 6/1/2027 Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive 2035 NA 2034 2035 2035 2035 2035 2035 NA Jas Separy Syed Peart Peart Peart Peart Peart Seb Syed Syed Jas LCC S/S NA Contingency Contingency Contingency Contingency Contingency Contingency Normal Normal Normal Contingency New Feeder load transfer Associated w/CS00404 Relocating equipment for CS00604 and CS00607 Reconfiguration Reconfiguration Reconductor Reconfiguration Reconfiguration Reconfiguration Reconductor Network Xfmr Replacement Network Xfmr Replacement Reconductor & Reconfiguration 2,952.70 1000 129.6 544.9 1,594.20 301.3 400.3 236 630.2 450.9 498.4 4,405.10 123.6 41.9 5.4 22.8 285.6 12.6 16.8 9.9 45.3 76.4 84.5 570.2 1005 340.4 44.1 185.5 45.6 102.5 136.2 80.3 139.3 56 61.9 390.8 504.2 170.7 22.1 93 201.8 51.4 68.3 40.3 160.1 47.8 52.9 904 223.2 75.6 9.8 41.2 38 22.8 30.3 17.8 50.9 63.3 70 118.7 0 0 0.9 0 0 2 2.7 0 0 0 0 27.1 1,077.20 364.8 47.3 198.8 878.2 109.9 146 86.1 234.6 205.9 227.6 2394.4 19.6 0 0 3.6 0 0 0 1.6 0 1.4 1.5 0 2024 2024 2024 2024 2026 2024 2026 2025 2026 2026 2026 2025 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 6/1/2027 Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive 2031 NA 2034 2034 2036 2034 2036 2035 2036 2036 2036 e e e f Substation Circuit Geographic Location of overload/potential NWA NWA Maximum Capacity MW NWA Overload MWh Maximum continuous overload duration (hours) from PAF NWA calculation Annual increase in MW Annual increase in MWh f Rocky Hill 3R Oxford 26N Chippen Hill 15U Middle River 28M Wilton 35A Ridgefield 22N Flanders 11Y Uncasville 1Q West Brookfield 14H Noera 13H Todd 30L West Brookfield 14H Rockville 14W Flax Hill 24A Greenwich 28F Cos Cob 11R Greenwich 28F Darien 13S Tracy 14M South Meadow 1A South Meadow 1A Farmington 3R04 26N7 15U2 28M11 35A8 22N15 11Y2 1Q6 14H1 Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive 0.6 NA 1 1.9 2 2 1 0.87 NA 3 NA 4 9.5 16 16 6 3.52 NA 5 NA 4 5 8 4 6 4 NA not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted 30L29 14H1 14W12 24A17 28F2 11R3 28F3 13S6 14M7 1A134 1A135 1C19 Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive Cost prohibitive 3 NA NA 1.4 1.46 1.14 1.2 1.4 0.315 NA NA NA 15 NA NA 7 10.24 8 4 4 1.26 NA NA NA 5 NA NA 5 7 7 3 5.73 4 NA NA NA not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted Number of overload events in 2025 (normal overload only) (events could be multiple day events) Number of days overload in 2025 (normal overload only) How many days are consecutive? (normal overload only) Normal Rating Contingency Rating NWA type evaluated Assumed capacity of battery storage (MWh) not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted 375 460 421 511 580 235 490 395 440 375 460 530 710 640 520 550 440 565 Battery Storage NA Battery Storage Battery Storage Battery Storage Battery Storage Battery Storage Battery Storage NA 3 NA 4 9.5 16 16 6 3.52 NA not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted not forecasted 2092 440 440 440 480 373 604 460 130 450 450 490 2176 565 Battery Storage NA NA Battery Storage Battery Storage Battery Storage Battery Storage Battery Storage Battery Storage NA NA NA 15 NA NA 7 10.24 8 4 4 1.26 NA NA NA 532 540 493 713 520 130 600 600 692
As listed on the current system
Question(s) Answered 25 (The Connecticut Light and Power Company) Date Filed: 10/27/2026