Interrogatory responses
Answers to questions 43, 44, 46
Filed by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Files3
BETP-043_Final.pdf
PDF · 141 KB · 2 pagesText searchable
Download BETP-043_Final.pdfRead the text of BETP-043_Final.pdf
BETP-044_Final.pdf
PDF · 85 KB · 1 pageText searchable
Download BETP-044_Final.pdfRead the text of BETP-044_Final.pdf
BETP-046_Final.pdf
PDF · 147 KB · 3 pagesText searchable
Download BETP-046_Final.pdfRead the text of BETP-046_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set DEEP-01
Date Issued October 06, 2026
BETP-043
Page 1 of 2
Date Filed: October 27, 2026
Witness:
Jared A. Lawrence, Shamus O’Brien, Edward A. Davis and Kimberly R.
Parsons
Request from: Department of Energy and Environmental Protection
Question:
(TVR interim or bridge offerings) Refer to Exhibit CLP-AMI-1, pp. 11-12 n.1, and Exhibit CLPAMI-2, pp. 80-82. Please identify the residential and commercial rate offerings the Company
expects to propose as interim or bridge solutions by the October 1, 2027, deadline in Conn. Gen.
Stat. Sec. 16-243n and explain how each proposal will address:
a. default enrollment with an opt-out;
b. applicable retail rate components;
c. seasonal and on-peak/off-peak design;
d. customer protections;
e. customer education; and
f. empirical support for the rate differential.
Response:
Details of these offerings and how each of the following items will be addressed will be
provided in the Company’s proposed interim rate filing with PURA. The Company notes that
proposed rates for the interim, bridge solution are expected to be subject to the same metering
and billing capabilities and constraints as with current rates. Current structures and the
outcomes for rates in the current rate case are expected to inform and provide the foundation
for proposed interim or bridge rate solutions. The Company is not providing its proposed
interim solutions at this time but is mindful of the referenced statutory requirements
represented in the questions posed and offers the following.
a. The Company’s current rates, structures and metering and billing capabilities are
anticipated to provide the foundation for proposed interim solutions. Given that current
rates consist of optional residential and a combination of optional and mandatory
commercial class time-varying rates that apply to certain components of rates, a proposal
for moving to new, default rate structures will require consideration of impacts due to
changes in rates and a transition plan to migrate customers to proposed new structures.
b. Current time-varying structures apply to the transmission and generation supply
components of service. The Company anticipates that such current rate structures and any
changes determined within the current Distribution rate case will provide the foundation
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set DEEP-01
Date Issued October 06, 2026
BETP-043
Page 2 of 2
for proposed interim rates. The Company will address proposed interim rate solutions that
require changes to these components of service, and that may apply to Distribution rates,
as part of its proposed interim rate submittal.
c. Current time-varying rates employ a 2-period, time-of-day (i.e., peak vs. off-peak) fixed
rate structure that is expected to provide the basis for future time-varying structures for the
proposed interim rate design. Such structures may be proposed on a seasonal basis for
some components of service in the proposed interim rate design.
d. The Company expects consumer protections afforded by the Company’s tariff (i.e., the
terms and conditions for distribution service and for generation supply), “consideration for
principles of gradualism and customer acceptance” in proposed rates, and further
“established exceptions as deemed appropriate by the authority, including, but not limited
to, for medically protected and financial hardship customers”, pursuant to Conn. Gen. Stat.
Sec. 16-243n, Section 20, part (b)(4), effective July 1, 2025, will be addressed as part of
the Company’s proposed interim rate design.
e. A marketing, education and outreach plan for residential and commercial customers will
be developed to educate customers about any interim or bridge solutions proposed, as those
options become available, to inform them of the benefits, necessary behavior modifications
and the steps to enroll or unenroll as necessary.
f. Empirical support for the rate differential for peak and off-peak rates being addressed in
the current Distribution rate case, including calculations and applications in proposed rate
design and as informed by the marginal cost analysis performed as part of the current case,
is expected to provide insight into the cost basis for setting a peak and off-peak differential
for distribution and transmission rates anticipated to be to be developed and submitted as
part of the October 1, 2027 filing. Consideration of differentials reflected in statutory or
regulatory constraints and requirements are expected to be reflected in the Company’s
proposed generation supply rates portion of service in the proposed interim rate solution.
As listed on the current system
Question(s) Answered 43, 44, 46 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026