Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 43, 44, 46

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-043 Page 1 of 2 Date Filed: October 27, 2026 Witness: Jared A. Lawrence, Shamus O’Brien, Edward A. Davis and Kimberly R. Parsons Request from: Department of Energy and Environmental Protection Question: (TVR interim or bridge offerings) Refer to Exhibit CLP-AMI-1, pp. 11-12 n.1, and Exhibit CLPAMI-2, pp. 80-82. Please identify the residential and commercial rate offerings the Company expects to propose as interim or bridge solutions by the October 1, 2027, deadline in Conn. Gen. Stat. Sec. 16-243n and explain how each proposal will address: a. default enrollment with an opt-out; b. applicable retail rate components; c. seasonal and on-peak/off-peak design; d. customer protections; e. customer education; and f. empirical support for the rate differential. Response: Details of these offerings and how each of the following items will be addressed will be provided in the Company’s proposed interim rate filing with PURA. The Company notes that proposed rates for the interim, bridge solution are expected to be subject to the same metering and billing capabilities and constraints as with current rates. Current structures and the outcomes for rates in the current rate case are expected to inform and provide the foundation for proposed interim or bridge rate solutions. The Company is not providing its proposed interim solutions at this time but is mindful of the referenced statutory requirements represented in the questions posed and offers the following. a. The Company’s current rates, structures and metering and billing capabilities are anticipated to provide the foundation for proposed interim solutions. Given that current rates consist of optional residential and a combination of optional and mandatory commercial class time-varying rates that apply to certain components of rates, a proposal for moving to new, default rate structures will require consideration of impacts due to changes in rates and a transition plan to migrate customers to proposed new structures. b. Current time-varying structures apply to the transmission and generation supply components of service. The Company anticipates that such current rate structures and any changes determined within the current Distribution rate case will provide the foundation The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-043 Page 2 of 2 for proposed interim rates. The Company will address proposed interim rate solutions that require changes to these components of service, and that may apply to Distribution rates, as part of its proposed interim rate submittal. c. Current time-varying rates employ a 2-period, time-of-day (i.e., peak vs. off-peak) fixed rate structure that is expected to provide the basis for future time-varying structures for the proposed interim rate design. Such structures may be proposed on a seasonal basis for some components of service in the proposed interim rate design. d. The Company expects consumer protections afforded by the Company’s tariff (i.e., the terms and conditions for distribution service and for generation supply), “consideration for principles of gradualism and customer acceptance” in proposed rates, and further “established exceptions as deemed appropriate by the authority, including, but not limited to, for medically protected and financial hardship customers”, pursuant to Conn. Gen. Stat. Sec. 16-243n, Section 20, part (b)(4), effective July 1, 2025, will be addressed as part of the Company’s proposed interim rate design. e. A marketing, education and outreach plan for residential and commercial customers will be developed to educate customers about any interim or bridge solutions proposed, as those options become available, to inform them of the benefits, necessary behavior modifications and the steps to enroll or unenroll as necessary. f. Empirical support for the rate differential for peak and off-peak rates being addressed in the current Distribution rate case, including calculations and applications in proposed rate design and as informed by the marginal cost analysis performed as part of the current case, is expected to provide insight into the cost basis for setting a peak and off-peak differential for distribution and transmission rates anticipated to be to be developed and submitted as part of the October 1, 2027 filing. Consideration of differentials reflected in statutory or regulatory constraints and requirements are expected to be reflected in the Company’s proposed generation supply rates portion of service in the proposed interim rate solution.

As listed on the current system

Question(s) Answered 43, 44, 46 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)