Interrogatory responses
Answers to questions 6
Filed by Connecticut Light and Power Company dba Eversource Energy1 file
Part of docket 26-05-10Files1
ICC-006_Final.pdf
PDF · 136 KB · 1 pageText searchable
Download ICC-006_Final.pdfRead the text of ICC-006_Final.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-006 Page 1 of 1 Date Filed: September 22, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Interconnection Customer Coalition Question: Reference ICC-5. For each Eversource business unit described in the response, provide in a chart, current, proposed and near-term staffing plans, as follows: Business Unit Current Staffing Numbers (Internal and Contractors, separated) Proposed Staffing Changes Under This Rate Case Proposed Staffing Changes Within the Next 5 Years Response: Please refer to the table below for the requested information: Business Unit Current Staffing Numbers (Internal and Contractors, separated) Proposed Staffing Changes Under This Rate Case Proposed Staffing Changes Within the Next 5 Years Distributed Energy – Customer Care 1 Distributed Energy – System Planning Field Engineering and Design Meter Engineering 7 FTE 4 Contractors 7 FTE 0 Contractors 76 FTE 11 FTEs 0 Contractors No change No change No change No change 8 FTE 0.5 Contractors 57 FTE No change No change No change No change Meter Service Technical No change The Company is proposing to staff 11 FTEs and 0 contractors (11 total), resulting in no net change to current staffing levels, which is 7 FTEs and 4 contractors (11 total). 1
As listed on the current system
Question(s) Answered 6 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026