Interrogatory responses
Answers to questions 25, 27, 28, 39, 40
Files9
NECTA-025_Final.pdf
PDF · 111 KB · 1 pageText searchable
Download NECTA-025_Final.pdfRead the text of NECTA-025_Final.pdf
NECTA-025 Attachment 1.pdf
PDF · 835 KB · 1 pageText searchable
Download NECTA-025 Attachment 1.pdfRead the text of NECTA-025 Attachment 1.pdf
NECTA-025 Attachment 2 REDACTED.pdf
PDF · 1.5 MB · 4 pagesText searchable
Download NECTA-025 Attachment 2 REDACTED.pdfRead the text of NECTA-025 Attachment 2 REDACTED.pdf
NECTA-027_Final.pdf
PDF · 142 KB · 2 pagesText searchable
Download NECTA-027_Final.pdfRead the text of NECTA-027_Final.pdf
NECTA-028_Final.pdf
PDF · 123 KB · 2 pagesText searchable
Download NECTA-028_Final.pdfRead the text of NECTA-028_Final.pdf
NECTA-028 Attachment 1 REDACTED.pdf
PDF · 1.5 MB · 5 pagesText searchable
Download NECTA-028 Attachment 1 REDACTED.pdfRead the text of NECTA-028 Attachment 1 REDACTED.pdf
NECTA-028 Attachment 2 REDACTED.pdf
PDF · 2.2 MB · 20 pagesText searchable
Download NECTA-028 Attachment 2 REDACTED.pdfRead the text of NECTA-028 Attachment 2 REDACTED.pdf
NECTA-039_Final.pdf
PDF · 90 KB · 1 pageText searchable
Download NECTA-039_Final.pdfRead the text of NECTA-039_Final.pdf
NECTA-040_Final.pdf
PDF · 110 KB · 1 pageText searchable
Download NECTA-040_Final.pdfRead the text of NECTA-040_Final.pdf
Text of NECTA-027_Final.pdf
Extracted from the file · 2 pages · 4,114 characters
Text of NECTA-028_Final.pdf
Extracted from the file · 2 pages · 4,225 characters
Text of NECTA-028 Attachment 1 REDACTED.pdf
Extracted from the file · 5 pages · 8,572 characters
Page 1 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-028 Attachment 2 REDACTED Page 1 of 20 WORK METHOD STANDARD ELECTRIC OPERATIONS ORGANIZATION Distribution Wood Pole Inspection, Testing, and Restoration Requirements Document Number: Issued Date: Revised Date: Revision: WMS 08.15 07-Jan-25 11-Sep-26 1 Applicability: ALL ***This Document Supersedes EMP 6.61A, WMS 08.02, WMS 08.03 & WMA 08.13*** Scope: This document outlines the steps to test, inspect, and treat Eversource owned wood poles and jointly owned, Eversource maintained wood poles, on public or private property. This shall encompass all distribution line poles, as well as push braces and guy stub poles. Safety: Providing a work environment, free of recognized hazards is a value at Eversource. Therefore, prior to the start of any work, ensure that you are familiar and knowledgeable with all Eversource Safety Rules, Policies and Procedures that are applicable to the work and tasks at hand and perform a job brief at the job site, prior to commencing work. PPE requirements to protect the worker shall be followed as required in the Eversource Employee Safety Manual. Date: Approved by: Signature on File 08-Sep-26 Vice President, Distribution Engineering Rev No. 1 0 0 Description Removed section for C-Truss, no longer an acceptable method to restore a pole. Document was reviewed as part of WMS Consolidation project. The content in the EMA (-1) version was identical to the CT/WMA/NH (-234) version. Content did not change, published signature date remains applicable. Original Document. Document Supersedes EMP 6.61A, WMS 08.02, WMS 08.03 & WMA 08.13. Date September 11, 2026 October 17, 2025 January 7, 2025Page 2 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-028 Attachment 2 REDACTED Page 2 of 20 Table of Contents Section Page 1.0 Contractor Requirements ..........................................................................................................3 2.0 Reference Documents...............................................................................................................3 3.0 Candidates for Inspection..........................................................................................................3 4.0 Inspection Criteria for Rejecting Poles ......................................................................................4 5.0 Wood Pole Inspection & Testing Methods.................................................................................5 6.0 Candidate Criteria for Reject Restoration ..................................................................................8 7.0 Data Collection ..........................................................................................................................9 Appendix 1 – Instruction for the External and Internal Ground Line Inspection and Supplemental Treatment of Wood Poles .................................................................................................................11 Appendix 2 – Reporting Format ........................................................................................................19 WMS 08.15 Page 2 of 20 Rev 1Page 3 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-028 Attachment 2 REDACTED Page 3 of 20 1.0 2.0 Contractor Requirements 1.1 The approved pole inspection CONTRACTOR (hereafter “CONTRACTOR”) shall provide all equipment, qualified labor, and materials to inspect and treat wood poles in the Eversource electric service territory. Relevant OSHA, DOT, EPA, state, and local regulations SHALL always adhered to. 1.2 CONTRACTOR standard specification and procedures, to be submitted and on file with Eversource, shall be followed unless otherwise stipulated in this Eversource specification and Appendix 1. Additional questions to be answered by CONTRACTOR in their final pole inspection reports are detailed in Appendix 2. 1.3 Relevant MSDS forms shall be provided to Eversource for all chemicals used in the preservation or pole restoration process. 1.4 Eversource area supervisors or personnel may stop CONTRACTOR crews if they are found to be working unsafely. All CONTRACTOR crews shall be fully trained before starting any work by the CONTRACTOR regarding the hazards of overhead and underground electric power lines. 1.5 Distribution Design Engineering may require a load analysis if a pole is suggested for reinforcement. Reference Documents NESC National Electric Safety Code (ANSI C2), 2023 EMP 5.61 Distribution and Sub-Transmission Wood Poles WMS 08.14 Wood Pole Inspection Using the IML Inspection Drill DTR 05.091 Pole Reflectors 3.0 Candidates for Inspection 3.1 Specific distribution poles shall be identified by Eversource for inspection, to require at least a visual inspection (for poles younger than twenty years of age). 3.2 When a pole is greater than 20 years old, or has failed a visual inspection, the IML Wood Inspection Drill shall be used to further evaluate. 3.3 Wood preservatives, pesticide treatments, fillers, and other repairing compounds shall be applied as needed on the same poles. 3.4 Internal treatments shall be applied to poles that cannot be partially excavated at two locations due to riser congestion or if the pole is set in asphalt or concrete. 3.5 Poles inspected by another pole inspection company within the six (6) years previous are not to be considered for sound and bore or excavation inspection and will be noted and billed simply as a visual report. 3.6 Poles to be inspected include all designated distribution line poles, guy stubs, and push brace poles. Marked privately owned poles on private property shall not be inspected. Poles that are marked with ownership by any telephone company will not be inspected. WMS 08.15 Page 3 of 20 Rev 1Page 4 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-028 Attachment 2 REDACTED Page 4 of 20 4.0 Inspection Criteria for Rejecting Poles 4.1 4.2 PRIORITY REJECTS (P1) – Historically referred to as “danger” or “priority” poles. These poles pose an imminent risk to public safety and shall be immediately reported to the area line supervisor or Eversource designated contact for emergency attention. These poles shall be identified as “PRIORITY REJECT.” Poles must be checked within 48 hours to assess the immediate impact on public safety and determine the required “make-safe” methods. Pole must be made safe within 10 calendar days. 4.1.1 Imminent electrical safety hazards observed shall be immediately communicated to the same Eversource contact. Other lesser safety or reliability hazards (such as vegetation growth) shall be identified through the routine reporting process as required by Eversource. 4.1.2 Priority Reject Poles shall be identified as follows: Use the C-aluminum pole tag which measures 2 inches high and 2 ½ inches wide. It has a clear aluminum arrow with an “X” inscribed in a circle imposed on the shaft of the arrow on a red background. .2.2. Paint a yellow “X,” approximately 1 foot square in size, on the roadside of the pole, centered approximately 6 feet above the ground line. Then, attach one C tag centered on the “X” and attach another C tag at approximately the same height on the field side of the pole. .2.3. If the pole is defective in the ground line section, place the tags so the arrow points downward. If the pole is defective in the upper portion, place the tags so the arrow points upward. If, however, the pole is defective in both the ground line section and in the upper portion, place a double set of tags; one set with the arrow pointing downward and the other set with the arrow pointing upward. Attach the tags with 1 ¼ inch galvanized roofing nails. NON-RESTORABLE REJECTS (NRR) – Deteriorated wood poles having reduced ground line circumferences that effectively reduce pole strength to less than 2/3 of the original pole strength (or, 67% of the original circumference) for the pole class shall be rejected. These are too deteriorated to be restored or do not meet the Eversource criteria for restoration (see Section 6.1). Refer to National Electric Safety Code (ANSI C2), Table 261-1, Rule 250B. 4.2.1 4.3 .2.1. Normal Reject Poles shall be identified as follows: .1.1. Use the B-aluminum pole tag which measures 2 inches high and 2 ½ inches wide. It has a clear aluminum arrow on a red background. .1.2. Attachment instructions for the B tag are the same as for the C tag used to identify priority poles in the preceding section. Industry-standard criteria or conventions used by CONTRACTOR inspectors for rejecting poles shall be used. These include visual damage including shell rot, decay pockets, excessive checking, spiral grain, large woodpecker holes, splits at the pole top, extensive wood damage or decay where loaded steel hardware bolts to pole, etc. Minimum avg. shell thickness shall be 2 inches for distribution poles. WMS 08.15 Page 4 of 20 Rev 1Page 5 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-028 Attachment 2 REDACTED Page 5 of 20 4.4 If there are multiple defects at different locations on a pole, do not compound (or deduct them) from the approximate ground line circumference unless defects are within five feet of the ground line area. If defects are less than five (5) feet above ground level, deductions from the ground line circumference can be taken. Other observed defects can be recorded in the comments and the poles identified as a non-restorable reject if appropriate. However, if the defects are severe enough at any one location that a pole failure is imminent or likely, only then shall the pole be classified as a Priority reject pole. Otherwise, poles with scattered defects shall be a standard non-restorable reject. 4.4.1 4.5 5.0 Exception where defects are to be compounded: Poles that are set in concrete/asphalt that cannot be excavated can have defects compounded if those defects suggest there may be advanced decay that would otherwise be found with excavation. Particular attention shall be paid to unguyed angle or dead-end poles that are leaning due to wire loads. Rejected poles require additional notations regarding the types of construction on the pole. This will help Eversource in prioritizing pole replacements. This shall include the following four categories: 4.5.1 Transformer/ large equipment pole (exclude risers, lighting, and fuses). 4.5.2 Three- or two-phase primary wires at pole top (with no large equipment). 4.5.3 Single-phase primary wire at pole top (with no large equipment). 4.5.4 Secondaries only or load bearing (includes push brace/guy stubs). Wood Pole Inspection & Testing Methods 5.1 Visual Inspection 5.1.1 WMS 08.15 Included in the visual inspection of each pole, the following shall be noted: .1.1. Accurate pole stencil tag and reflectors .1.2. Pole top split or deteriorated .1.3. Species of wood .1.4. Height and class .1.5. Original treatment date (If applicable and legible) .1.6. Ground line circumference .1.7. Leaning pole .1.8. Cracks or breaks across the grain .1.9. Mechanical or fire damage .1.10. Woodpecker holes or/and Insect damage .1.11. Conks (i.e., fungus, fruiting bodies), knot clusters or holes .1.12. Any unauthorized attachments, such as flags, signs, etc. Page 5 of 20 Rev 1Page 6 of 20
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 7 of 20
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 8 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-028 Attachment 2 REDACTED Page 8 of 20 .3.2. 4BGH (four below grade, half drills) test sequence is comprised of one horizontal and four, below grade half drillings. This is an alternate testing sequence to be used when obstructions are present. .3.3. If additional tests are desired due to inconclusive data or suspicions, they can be added when the initial testing sequence is complete. The meter’s display will prompt the user if any additional drillings are to be conducted and added to this pole location’s test data. 5.10.4 The inspection drill captures the measurements based off the resistance of the wood so the wear and tear on the bit is widely varied based off the density level of the wood. Good practice to prevent this is to always check the bit quality/shape throughout the day, ensuring there is an edge to the bit. If the operator experiences hitting a rock, nail, or any other hard object, they will typically hear the sound and see the change on the graph. If this happens, the next step should be to extend the bit and check its condition to ensure the edge is still in good working condition. On average, you can do 100+ drillings per bit. 5.10.5 If testing is done by a contractor, all pole testing raw data from the IML tool must be provided with the final testing report provided to Eversource. 6.0 Candidate Criteria for Reject Restoration 6.1 Poles evaluated as normal reject poles by the inspector shall be noted in the computer database as “Restorable” if there is sufficient shell thickness to transfer the strength of the steel reinforcing member to the wood pole. A normal reject pole is restorable with one of the following options if it meets the following minimum criteria. 6.2 All the following requirements must be met in order to qualify a pole for restoration: 6.2.1 No circuit rebuild requiring taller or larger class poles is planned within the present planning period. Search the Work Management System by pole number to determine if other work has been planned for that pole and proceed accordingly. 6.2.2 No equipment additions (capacitors, reclosers, regulators, switches, or transformers) that would require a taller or larger class pole are expected in the near future. 6.2.3 Telephone Company concurs with pole restoration for those poles jointly owned. (Refer to guidelines for jointly owned poles below.) 6.2.4 If applicable, State Highway Department concurs with pole restoration for poles along state highways. For the State of Connecticut, written approval must first be obtained from the appointing authority of the local municipality of the state route where pole restoration is planned. A permit is required by the State of Connecticut. 6.2.5 Department of Transportation will not be issued unless approval from the municipality is included with the request. WMS 08.15 Page 8 of 20 Rev 1Page 9 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-028 Attachment 2 REDACTED Page 9 of 20 6.3 6.4 Additionally, reject poles meeting any of the following criteria shall not be considered for restoration: 6.3.1 Poles showing advanced decay or large splits along lines of stress. 6.3.2 Poles with risers that need Eversource or other utility crew assistance in order to complete reinforcement. 6.3.3 Poles with less than 50% of the base circumference. 6.3.4 Poles with an excessive or severe lean, guyed or unguyed. 6.3.5 If severe rock or tree root conditions exist at the base of the pole, replace the pole. 6.3.6 Poles that are approaching or are beyond their expected service life. Most utilities estimate that the average service life of a pole is approximately 40 years. 6.3.7 Poles that will lead to a violation of the 36 inches minimum clearance required for wheelchair passage on any side per Mass. A.A.B. guidelines and the U.S.A.D. A’s requirements. Also, consider ramps that may be near a pole. 6.3.8 Assess the need to climb the pole in the future. If the pole cannot be easily reached with a bucket truck and the condition of the pole above the ground line is not sufficient to allow climbing, then replace the pole. Replace all poles found to be Priority Reject poles. Evaluate the condition of the entire pole. If there are cracks, splits, or rot at the top, extensive woodpecker holes, or other damage that would make it impractical to extend the life of the pole by restoring the pole at the ground line, then the pole should be replaced rather than restored. 6.4.1 6.5 Determine if the pole is the correct class and height to support the facilities that are on it. The Eversource Distribution standards provide the required clearances and guidance to calculate the strength requirements to support electric and communications equipment. If it is determined that the existing pole is not sufficient due to strength or clearance issues, then replace it with the correct class and height pole. 6.5.1 7.0 Exception to this rule: If you know that the pole will be relocated or replaced for other reasons within the next five (5) years, and restoration will extend its life at least for that period, then restore the pole instead of replacing it. Return to Distribution Maintenance and Construction a list of those poles which you have confirmed can be restored. For those which you have determined cannot be restored, state the reason(s) in writing why they cannot be restored. Data Collection 7.1 All documented comments and questions are to be reported in a consistent order, providing one column per comment/question throughout the report. Some agreed-upon questions shall be detailed by Eversource, and answers will be included in the final report (see appendix). 7.2 To allow for a timely review of restorable poles and redress for priority poles, a separate excel file shall be provided after completing all inspections on a circuit or in a town depending on the inspection type. WMS 08.15 Page 9 of 20 Rev 1Page 10 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-028 Attachment 2 REDACTED Page 10 of 20 7.2.1 This file shall have separate tabs to list all poles that are the three reject types (priority rejects, non-restorable rejects, restorable reject candidates). File name format shall be “EVERSOURCE_DELIVERABLE_DATE WEEK ENDING (e.g. 06-22-21).xls”. Returning data delivery shall include Eversource GIS Data supplied for each pole. 7.3 One complete database shall be provided for each town after all inspections are completed. At the end of the project, all database information shall be corrected to reflect what poles were restored by the CONTRACTOR, if the CONTRACTOR is the same. Any poles that were not restored as planned must be clearly indicated. 7.4 Final reports shall be provided in Microsoft Excel, with the filename in the following format: “EVERSOURCE_INSPECTION YEAR (e.g.2021) _POLE INSPECTIONS.mdb.” At the end of the work year, one master compiled file shall be provided. WMS 08.15 Page 10 of 20 Rev 1
Text of NECTA-039_Final.pdf
Extracted from the file · 1 page · 1,644 characters
Text of NECTA-040_Final.pdf
Extracted from the file · 1 page · 2,347 characters
As listed on the current system
Question(s) Answered 25, 27, 28, 39, 40 (The Connecticut Light and Power Company) Date Filed: 09/23/2026