Interrogatory responses

Answers to questions 45, 54, 57, 60

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

  1. Page 1 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 1 of 39 Category CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles Non CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles ConversationID 1285365 1287331 1288293 1289834 Frontier Application Fees $1,950.00 $19,400.00 $0.00 $8,525.00 CL&P Application Fees $150.00 $150.00 $150.00 $150.00 CL&P Survery Fees $1,800.00 $19,625.00 $50.00 $8,375.00 Make-Ready Estimate Amount $2,549.70 $3,384.08 $1,298.55 True-Up Cost -$246.59 $4,388.40 $939.09 $394,148.97 ConversationCurrentStatus Make-Ready Overdue Make-Ready Overdue Attachment Overdue Awaiting MR Payment PermittingCompany Precision Valley Communications Precision Valley Communications New Cingular Wireless PCS MCIMETRO ACCESS TRANSMISSION SYSTEMS ApplicationSubmitted 5/11/2022 5/23/2022 5/24/2022 6/3/2022 SurveyStart 5/24/2022 6/2/2022 6/15/2022 7/6/2022 PowerSurvey 1288537 1290912 1296059 1307671 PowerSurveyStatus Complete Complete Complete Complete PoleID 4653222 4924146 4210434 4564688 PoleNo 2264 1594 78422 2863 StreetAddress BASLEY RD WESTCOTT RD BYRAM RD MIDDLE ST Town Plainfield Killingly Greenwich Bristol OwnerName CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER VERIZON NEW YORK/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER/FRONTIER Custodian CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER VERIZON NEW YORK CONNECTICUT LIGHT&POWER Latitude 41.75756454 41.8094368 Longitude -71.904953 -71.87579346 41.00642079 -73.65237607 41.66492462 -72.92092896 AttachmentWorkType null null TRANSFER null AttachmentMRAction null null Transfer To New Pole null PoleWorkType REPLACE REPLACE REPLACE REPLACE PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable null Inst 40' class 2 pole (JO) / Abdn 35' class 4 pole (C-Truss).Inst. (1) anc. at a lead of 17' for stub/Sec. DE.Attach Sec. DE at 82".Inst. (1) 14M span guy at 70", run to pole 2263 (ins. at pole 2263).Inst. (1) 14M non-ins. anc. guy at 70", attach to new DE anc. Existing Attachment auto-added. Y null Inst 45' class 2 pole (JO) / Abdn 35' class 4 pole.Inst. 14M ins. Stub guy at 22", run to pole 1873.Attach Sec. at 109".Transfer Xfrmr. Existing Attachment auto-added. Y null null FTR to set 45' class 2 pole (JO) / Rmv 40' class 3 pole. Attach Sec. DE at 109". Inst. (1) 14M ins. span guy at 97", run to pole 70807 (ins. at pole 90807). Inst. (1) 18M ins. anc. guy at 109", attach to DE anc. (VZ Set). Transfer street light. Y null REQUESTING ES TO CUT & KICK AND REPLACE POLE WITH 55'-1 DUE TO CAMM MED SPAN CLEARENCE TRANSFER EXISTING POWER Existing Attachment auto-added. Y null ES Replace 3/4"ST Anchor with 1"TT L-12' Due to COMM Guying Required and Due to Additional Load with New Attachment Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1291152 $3,025.00 $150.00 $2,875.00 $60,744.20 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307682 Complete 4634145 816 CIRCLE DR Farmington CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.73654938 -72.90032959 MAKE-READY Other null null CONNECTICUT LIGHT&POWER New or Replace Poles 1291152 $3,025.00 $150.00 $2,875.00 $60,744.20 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307682 Complete 4651388 657 PLAINVILLE AVE Farmington CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.73923874 -72.89109802 null null REPLACE null ES TO REPLACE POLE WITH 45'2. TRANSFER EXISTING POWER. Existing Attachment auto-added. Y null REQUESTING ES TO CUT & KICK AND REPLACE POLE WITH 55'-1 DUE TO CAMM MED SPAN CLEARENCE TRANSFER EXISTING POWER Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4580400 2860 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66585541 -72.92153168 null null REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4571421 9278 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65856552 -72.9160614 null null REPLACE null 9278 (978). ES TO REPLACE POLE WITH 55/1 TRANSFER EXISITNG POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4903395 9272 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.6611824 -72.91815948 null null REPLACE null ES TO REPLACE POLE WITH 55/1 TRANSFER EXISITNG POWER Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4576077 9273 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66067505 -72.91773224 MAKE-READY Other null null null Pole ownership to become E5; Raise Secondary 16"; Raise Streetlight 36" Y CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4902531 6274 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65426254 -72.91192627 null null REPLACE null Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4569148 6283 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65225983 -72.90783691 null null REPLACE null Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4575565 16021 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66098404 -72.91799164 null null REPLACE null CONNECTICUT LIGHT&POWER 41.65895462 -72.91638184 null null REPLACE null ES TO REPLACE POLE WITH 50/1 TRANSFER EXISTING POWER REQUESTING ES TO REPLACE POLE WITH 50/1 DUE TO COMM CLEARENCE TRANSFER EXISTING POWER REQUESTING ES TO CUT & KICK AND REPLACE POLE WITH 55'-1 DUE TO CAMM MED SPAN CLEARENCE TRANSFER EXISTING POWER REQUESTING ES TO REPLACE POLE WITH 55-1 DUE TO COMM MED SPAN CLEARENCE TRANSFER EXISTING POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4564763 9277 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4558354 8829 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65774918 -72.91536713 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4562773 6279 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65316391 -72.90953064 null null REPLACE null ES TO REPLACE POLE WITH 55/1 TRANSFER EXISTING POWER 6279 (629). REQUESTING ES TO REPLACE POLE WITH 45/1 DUE TO COMM CLEARENCE TRANSFER EXISTING POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1289834 $8,525.00 $150.00 $8,375.00 $394,148.97 Awaiting MR Payment MCIMETRO ACCESS TRANSMISSION SYSTEMS 6/3/2022 7/6/2022 1307671 Complete 4559698 16014 MIDDLE ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65907288 -72.91647339 null null REPLACE null ES TO REPLACE POLE WITH 55/1 TRANSFER EXISITNG POWER Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1286182 $21,400.00 $150.00 $21,625.00 $1,916.44 Awaiting MR Payment NetSpeed LLC 6/6/2022 7/6/2022 1307692 Complete 4486480 G6609 CHASE PKWY Waterbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.5477829 MAKE-READY Other null null null Raise Neutral 6" due to clearance; Extend Secondary riser 14" Y null Raise Secondary 31" due to clearance; Raise Streetlight 18" ES/FTR split to update from 45/35 to 45/40 Y Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1286182 $21,400.00 $150.00 $21,625.00 $1,916.44 Awaiting MR Payment NetSpeed LLC 6/6/2022 7/6/2022 1307692 Complete 4890460 7879 HIGHLAND AVE Waterbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER -73.06098938 41.54708099 -73.05640411 MAKE-READY Other null null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1286182 $21,400.00 $150.00 $21,625.00 $1,916.44 Awaiting MR Payment NetSpeed LLC 6/6/2022 7/6/2022 1307692 Complete 4483563 F1493 HIGHLAND AVE Waterbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.54843521 -73.05729675 MAKE-READY Other null null DOUBLE POLE Raise Secondary 26" due to clearance; Replace span guy backing Secondary with 14M to P.24428 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1286182 $21,400.00 $150.00 $21,625.00 $1,916.44 Awaiting MR Payment NetSpeed LLC 6/6/2022 7/6/2022 1307692 Complete 4485405 62026 CHASE PKWY Waterbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.54781342 -73.05971527 MAKE-READY Other null null null Raise Secondary 12" and place on extension bracket, due to clearances Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1286182 $21,400.00 $150.00 $21,625.00 $1,916.44 Awaiting MR Payment NetSpeed LLC 6/6/2022 7/6/2022 1307692 Complete 4477545 7539 CHASE PKWY Waterbury CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.54834747 -73.05744934 MAKE-READY Other null null null Raise Secondary 18" due to clearance Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1286182 $21,400.00 $150.00 $21,625.00 $1,916.44 Awaiting MR Payment NetSpeed LLC 6/6/2022 7/6/2022 1307692 Complete 4475442 7784 CHAMBERS ST Waterbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.54634857 -73.05364227 MAKE-READY Other null null null Raise secondary 18"; services exist midspan in field Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1286182 $21,400.00 $150.00 $21,625.00 $1,916.44 Awaiting MR Payment NetSpeed LLC 6/6/2022 7/6/2022 1307692 Complete 4481138 29382 ACRA RD Waterbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.54617691 -73.05413818 MAKE-READY Other null null null Re-sag Neutral to P.29381 due to clearance Y null Abandon: 35/4Install: 40/2Replace due to clearance; Attach Secondary 82" from pole top; Shift (1) service midspan; Transfer 50KVA XFMR; XFMR is fused; Zap shield exists Existing Attachment auto-added. Y null Inst 45' class 2 pole (JO) / Abdn 35' class 4 pole.Cut and kick pole for risers.Inst. (1) anc. at a lead of 13' for 3PH DE.Inst. (1) anc. at a lead of 19' for service DE.Attach 1/0 QPX at 107", attach 4/0 QPX service at 109".Inst. (1) 18M ins. anc. guy at 15", attach to the 13' lead DE anc.Inst. (1) 18M non-ins. anc. guy at 109", attach to 19' lead DE anc.Inst. cutouts.Extend service riser for new pole height.Transfer Xfmr bank. Existing Attachment auto-added. Y null Inst 35' class 2 pole (JO) / Abdn 30' class 4 pole.Inst. 10" PISA at a lead of 13' for DE OWS.Inst. 18M non-ins. anc guy at 38", attach to 13'L DE anc. Transfer 3 spool rack, so bottom of bracket is at 46". Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1286200 1292976 1292699 $24,275.00 $15,775.00 $18,900.00 $150.00 $150.00 $150.00 $24,000.00 $16,750.00 $19,500.00 $13,543.25 Awaiting MR Payment $10,892.94 $2,202.76 Make-Ready Overdue $2,483.63 Make-Ready Overdue NetSpeed LLC Precision Valley Communications Precision Valley Communications 6/6/2022 6/9/2022 6/13/2022 7/6/2022 7/5/2022 7/5/2022 1307702 1307060 1307058 Complete Complete Complete 4888810 4783582 4929330 F9995 1455 3381 COMO AVE INDUSTRIAL PARK RD S SHORE RD Waterbury Putnam Killingly CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.53552246 -73.0664444 41.89956284 -71.88929749 41.85597029 -71.8974841 null null null null null null REPLACE REPLACE REPLACE
  2. Page 2 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 2 of 39 Category ConversationID CONNECTICUT LIGHT&POWER New or Replace Poles 1295110 Frontier Application Fees $17,275.00 CL&P Application Fees $150.00 CL&P Survery Fees $18,125.00 Make-Ready Estimate Amount True-Up Cost $3,800.00 ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus Awaiting MR Payment NetSpeed LLC 6/15/2022 7/26/2022 1315134 Complete PoleID PoleNo StreetAddress Town OwnerName Custodian 4530960 27444-S EASTERN AVE Waterbury CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Latitude Longitude 41.58288574 -73.07893372 AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable null null REPLACE null ES replace pole 35/2 Existing Attachment auto-added. Y Existing Attachment auto-added. Y Make-Ready Overdue Precision Valley Communications 6/15/2022 7/12/2022 1310281 Complete 4808510 2066 AUBURN ST Putnam CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.92848988 -71.90476773 null null REPLACE null Inst. 40c2 pole (JO) / Abdn. 30'Inst. (1) anc. at a lead of 14' for DE.Attach Sec. DE at 82".Inst. (1) 14M ins. anc. guy at 22", attach to the 14' lead DE.Inst. cutout & zap shield.Transfer xfrmr. $6,009.85 Awaiting MR Payment NetSpeed LLC 6/16/2022 8/2/2022 1318062 Complete 4494870 G4406 MIDWOOD AVE Waterbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.55789938 -73.06600102 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y $1,881.05 Awaiting MR Payment NetSpeed LLC 6/21/2022 8/2/2022 1318096 Complete 4596038 2829 CRESCENT RD Glastonbury CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.68865204 -72.56871033 null null REPLACE null ES replace pole 35/2 Existing Attachment auto-added. Y FRONTIER 41.69926453 -72.57796478 null Transfer To New Pole REPLACE null FTR TO REPLACE POLE WITH 50/1 TRANSFER EXISTING POWER FTR replace pole 50/1 Y ES replace pole 35/2 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1295221 $21,400.00 $150.00 $21,250.00 $4,431.43 CONNECTICUT LIGHT&POWER New or Replace Poles 1285931 $18,650.00 $150.00 $18,875.00 CONNECTICUT LIGHT&POWER New or Replace Poles 1292010 $22,400.00 $150.00 $23,375.00 $1,981.57 Non CONNECTICUT LIGHT&POWER New or Replace Poles 1292010 $22,400.00 $150.00 $23,375.00 $1,881.05 Awaiting MR Payment NetSpeed LLC 6/21/2022 8/2/2022 1318096 Complete 4609395 2609 NEW LONDON TPKE Glastonbury FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1292027 $21,400.00 $150.00 $21,375.00 $11,469.29 Awaiting MR Payment NetSpeed LLC 6/21/2022 8/2/2022 1318105 Complete 4606774 857 HILLCREST DR Glastonbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.68866348 -72.60063934 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1292057 $22,650.00 $150.00 $22,500.00 $18,029.88 Awaiting MR Payment NetSpeed LLC 6/21/2022 8/2/2022 1318110 Complete 4607557 2963 CART RD Glastonbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.69040298 -72.58753204 null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1304921 $2,150.00 $150.00 $2,375.00 $2,492.11 $6,396.09 Make-Ready Overdue Precision Valley Communications 7/1/2022 7/20/2022 1313793 Complete 4556651 193 HOWE RD Griswold CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.6347352 -71.95885881 null null REPLACE null ES TO REPLACE POLE WITH 35/2 TRANSFER EXISTING POWER TRANSFER CONNECTICUT LIGHT&POWER New or Replace Poles 1305498 $2,150.00 $150.00 $3,125.00 $53,059.33 $13,843.34 Make-Ready Overdue Precision Valley Communications 7/1/2022 7/20/2022 1313801 Complete 4605446 2267 TERRACE DR Plainfield CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.68827621 -71.91555102 null null REPLACE null EVS TO REPLACE POLE WITH 40/2 CUT & KICK Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1305498 $2,150.00 $150.00 $3,125.00 $53,059.33 $13,843.34 Make-Ready Overdue Precision Valley Communications 7/1/2022 7/20/2022 1313801 Complete 4907484 2266 TERRACE DR Plainfield CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.6882242 -71.91494235 null null REPLACE null EVS TO REPLACE POLE WITH 40/2 CUT & KICK Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1305498 $2,150.00 $150.00 $3,125.00 $53,059.33 $13,843.34 Make-Ready Overdue Precision Valley Communications 7/1/2022 7/20/2022 1313801 Complete 4606133 2268 TERRACE DR Plainfield CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.68879237 -71.91508662 null null REPLACE null EVS TO REPLACE POLE WITH 40/2 CUT & KICK Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1305498 $2,150.00 $150.00 $3,125.00 $53,059.33 $13,843.34 Make-Ready Overdue Precision Valley Communications 7/1/2022 7/20/2022 1313801 Complete 4619067 2265 TERRACE DR Plainfield CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.6880426 -71.91425373 null null REPLACE null EVS TO REPLACE POLE WITH 40/2 CUT & KICK Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1305498 $2,150.00 $150.00 $3,125.00 $53,059.33 $13,843.34 Make-Ready Overdue Precision Valley Communications 7/1/2022 7/20/2022 1313801 Complete 4907679 2269 TERRACE DR Plainfield CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.68947009 -71.91494765 null null REPLACE null EVS TO REPLACE POLE WITH 40/2 CUT & KICK Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1305498 $2,150.00 $150.00 $3,125.00 $53,059.33 $13,843.34 Make-Ready Overdue Precision Valley Communications 7/1/2022 7/20/2022 1313801 Complete 4607447 2271 TERRACE DR Plainfield CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.68891188 -71.91386397 null null REPLACE null EVS TO REPLACE POLE WITH 40/2 CUT & KICK Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1305498 $2,150.00 $150.00 $3,125.00 $53,059.33 $13,843.34 Make-Ready Overdue Precision Valley Communications 7/1/2022 7/20/2022 1313801 Complete 4907608 2270 TERRACE DR Plainfield CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.68912757 -71.91453763 null null REPLACE null EVS TO REPLACE POLE WITH 40/2 CUT & KICK Existing Attachment auto-added. Y null Remove: 40'Install: 45/1Transfer: 25KVA OH XFMR BankReplace due to on pole clearances; attach secondary 136" from pole top; replace 14M secondary down guy to existing 1" TT anchor, LL=16', P=DE Existing Attachment auto-added. Y null Remove: 35'Install: 40/1Transfer: 50KVA OH XFMRReplace due to on pole clearances; attach secondary 82" from pole top and place on extension bracket; replace 14M secondary span guy to P.2607-S; shift one (1) service mid-span Existing Attachment auto-added. Y null Remove: 40'Install: 50/1Replace due to on pole clearances; attach secondary 163" from pole top; replace (2) 18M primary down guys to new ES set 1" TT anchors, LL1=20', P1=DE, LL2=20', P2=DE Existing Attachment auto-added. Y ES TO REPLACE POLE WITH 50/2 DUE TO MIDSPAN CLEARANCE ISSUES TRANSFER EXISTING POWER Existing Attachment auto-added. (Billable) Raise DDE Neut.s 6". (NonBillable) Inst. (2) 18M ins. anc. guy at their existing heights, replacing existing guys, attach each to their respective existing DE anc. Inst 50' class 1 pole (JO) / Abdn 45' class 2 pole. Maintain slack span of cables to pole 84112. Attach Sec./Neut. at 136". Transfer cutout. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1307804 1307804 1307804 $20,650.00 $20,650.00 $20,650.00 $150.00 $150.00 $150.00 $22,125.00 $22,125.00 $22,125.00 $143,407.06 Awaiting MR Payment $143,407.06 Awaiting MR Payment $143,407.06 Awaiting MR Payment CONNECTICUT LIGHT&POWER New or Replace Poles 1315781 $900.00 $150.00 $750.00 $8,576.31 $9,270.17 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1315871 $0.00 $150.00 $625.00 $419.16 $0.00 MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS 7/8/2022 7/8/2022 7/8/2022 10/6/2022 10/6/2022 10/6/2022 1347185 1347185 1347185 Complete Complete Complete 4712361 4919230 4691730 622 2607 2535 TOLLAND ST HUDSON ST GREAT HILL RD East Hartford East Hartford East Hartford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.78298187 -72.60823822 41.77416992 -72.60549927 41.77537918 -72.59615326 Make-Ready Overdue null 7/28/2022 8/10/2022 1320567 Complete 4592520 2227 FARMINGTON AVE Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.68512726 Inspection CABLEVISION OF LITCHFIELD, INC 7/28/2022 9/14/2022 1337698 Complete 4855727 82531 BUTTERNUT HOLLOW RD Greenwich CONNECTICUT LIGHT&POWER/VERIZON NEW YORK CONNECTICUT LIGHT&POWER 41.09635925 -73.64276886 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1317158 $7,025.00 $150.00 $7,000.00 $35,243.40 Make-Ready Overdue Siena Engineering Group 8/1/2022 8/10/2022 1320564 Complete 14790297 84111 SOUND BEACH AVE EXT Greenwich FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER CONNECTICUT LIGHT&POWER New or Replace Poles 1317158 $7,025.00 $150.00 $7,000.00 $35,243.40 Make-Ready Overdue Siena Engineering Group 8/1/2022 8/10/2022 1320564 Complete 4226835 521 STUART DR Greenwich CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.04353333 -72.9384613 -73.5756073 41.04959106 -73.56691742 null null null null null null REPLACE REPLACE REPLACE null null REPLACE null MAKE-READY Other null null null Y MAKE-READY Transfer To New Pole null null null null REPLACE null Inst 50' class 1 pole (JO) / Abdn 45' class 2 pole.Attach Sec./Neut. at 136".Replace cutout. Inst 45' class 2 pole (JO) / Abdn 40' class 3 pole.Inst. 11'L bisector PISA.Inst. 18M ins. anc. guy at 22", attach to 11'L bisector anc.Attach Sec./Neut. at 109".Transfer street light. Existing Attachment auto-added. Y Existing Attachment auto-added. Y Y CONNECTICUT LIGHT&POWER New or Replace Poles 1321866 $900.00 $150.00 $1,125.00 $26,011.62 Make-Ready CROWN CASTLE 8/16/2022 8/23/2022 1324217 Complete 4906752 2219 FARMINGTON AVE Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.68313217 -72.94107056 null null REPLACE null ES REPLACE POLE W/A 50-1 DUE TO COMM. CLEARANCE/ TRANSFER EXISTING POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1321866 $900.00 $150.00 $1,125.00 $26,011.62 Make-Ready CROWN CASTLE 8/16/2022 8/23/2022 1324217 Complete 4585133 2220 FARMINGTON AVE Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.6834259 null null REPLACE null REPLACE POLE W/A 50-1 (ES + 5') TRANSFER EXISTING POWER. Existing Attachment auto-added. Y Existing Attachment auto-added. Y -72.94068909 CONNECTICUT LIGHT&POWER New or Replace Poles 1321866 $900.00 $150.00 $1,125.00 $26,011.62 Make-Ready CROWN CASTLE 8/16/2022 8/23/2022 1324217 Complete 4614906 2221 FARMINGTON AVE Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.68367004 -72.94036102 null null REPLACE null ES TO REPLACE POLE W/A 50-1 (ES + 5') DUE TO COMM. CLEARANCE ISSUES. TRANSFER EXISTING POWER. CONNECTICUT LIGHT&POWER Make-Ready Attachments 1297151 $19,400.00 $150.00 $20,750.00 $217.12 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/22/2022 1341282 Complete 4584644 52922 CORBIN AVE New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.67066193 -72.80509186 MAKE-READY Street Light Bracket null null null raise street light 18" Y CONNECTICUT LIGHT&POWER New or Replace Poles 1330708 $525.00 $150.00 $1,375.00 $52,942.49 Awaiting MR Payment NetSpeed LLC 8/30/2022 10/19/2022 1351778 Complete 4580749 3235 ROUTE 9 Berlin CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.64957809 -72.76986694 null null REPLACE null UI TO REPLACE POLE WITH 40/2 Existing Attachment auto-added. Y New Britain FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.67359161 -72.7617569 MAKE-READY Shift Raise null null null raise secondary 4" Y New Britain FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.67272186 -72.76190186 MAKE-READY Shift Raise null null null raise secondary 10" Y null MINIMUM HEIGHT REQUIREMENT FOR LOWEST POWER IS 31'8"IF NOT POLE REPLACEMENT IS UNAVOIDABLE raise secondary 53" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments 1300323 1300323 1300342 $23,650.00 $23,650.00 $23,525.00 $150.00 $150.00 $150.00 $24,375.00 $24,375.00 $25,500.00 $517.90 $517.90 $4,192.44 Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC 8/30/2022 8/30/2022 8/30/2022 9/22/2022 9/22/2022 9/22/2022 1341297 1341297 1341300 Complete Complete Complete 4587541 4578535 4607582 1420 4415 5318 SUNRISE AVE CARLSON ST EAST ST New Britain FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.69041443 -72.75974274 MAKE-READY Shift Raise null
  3. Page 3 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 3 of 39 null null raise secondary 11" Y CONNECTICUT LIGHT&POWER 41.69595718 -72.79785919 null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.69728851 -72.79525757 null null REPLACE null ES replace pole 35/2 Existing Attachment auto-added. Y New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.69818878 -72.7913208 MAKE-READY Shift Raise null null null raise secondary 20" Y New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.69518662 -72.79128265 MAKE-READY Shift Raise null null null raise secondary 18" Y New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.69747925 -72.79111481 MAKE-READY Shift Raise null null null raise secondary 36" Y New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.68458939 -72.79905701 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65638351 -72.78269196 null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER 41.6556282 -72.78310394 null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y -72.7826004 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y Custodian $607.89 Awaiting MR Payment NetSpeed LLC 8/30/2022 10/13/2022 1349687 Complete 4581875 58915 QUEEN ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER $21,250.00 $23,982.14 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/29/2022 1344779 Complete 4597019 1631 SKIPPER ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER $150.00 $21,250.00 $23,982.14 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/29/2022 1344779 Complete 4602965 4193-S LURTON ST New Britain $150.00 $21,250.00 $23,982.14 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/29/2022 1344779 Complete 4604306 98828 FARMINGTON AVE 1300686 $21,275.00 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1300686 $21,275.00 $24,025.00 null OwnerName CONNECTICUT LIGHT&POWER New or Replace Poles 1296144 Shift Raise Town $150.00 $23,025.00 MAKE-READY StreetAddress $21,275.00 1300740 41.67591858 -72.80387115 PoleNo 1300686 CONNECTICUT LIGHT&POWER New or Replace Poles Billable PoleID CONNECTICUT LIGHT&POWER New or Replace Poles $21,275.00 PowerSurveyAttachmentComment PowerSurveyStatus $22,625.00 1300686 PoleComment PowerSurvey $150.00 CONNECTICUT LIGHT&POWER New or Replace Poles PoleWorkReason SurveyStart $22,900.00 $21,275.00 PoleWorkType ApplicationSubmitted 1301174 1300686 AttachmentMRAction PermittingCompany CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments AttachmentWorkType ConversationCurrentStatus ConversationID CONNECTICUT LIGHT&POWER Make-Ready Attachments Frontier Application Fees CL&P Application Fees CL&P Survery Fees Category $150.00 $150.00 $150.00 $150.00 $21,250.00 $21,250.00 $22,750.00 $23,750.00 Make-Ready Estimate Amount True-Up Cost $23,982.14 Awaiting MR Payment $23,982.14 Awaiting MR Payment $3,962.46 Awaiting MR Payment $44,236.45 Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC 8/30/2022 8/30/2022 8/30/2022 8/30/2022 9/29/2022 9/29/2022 10/13/2022 9/8/2022 1344779 1344779 1349676 1333956 Complete Complete Complete Complete 4908350 4627450 4595792 4570275 46035 46042 55341 53258 FARMINGTON AVE FARMINGTON AVE OSGOOD AVE GREENWOOD ST Latitude Longitude CONNECTICUT LIGHT&POWER New or Replace Poles 1296144 $24,025.00 $150.00 $23,750.00 $44,236.45 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/8/2022 1333956 Complete 4569581 59009 WALLACE ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER New or Replace Poles 1296144 $24,025.00 $150.00 $23,750.00 $44,236.45 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/8/2022 1333956 Complete 4572011 53260 GREENWOOD ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65588379 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1296144 $24,025.00 $150.00 $23,750.00 $44,236.45 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/8/2022 1333956 Complete 4560501 56807 GLEN ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65362549 -72.78091431 MAKE-READY Shift Raise null null null raise secondary 26" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1296144 $24,025.00 $150.00 $23,750.00 $44,236.45 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/8/2022 1333956 Complete 4902309 56817 BROOK ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65246201 -72.77970886 MAKE-READY Street Light Bracket null null null raise SL 16" Y CONNECTICUT LIGHT&POWER New or Replace Poles 1296144 $24,025.00 $150.00 $23,750.00 $44,236.45 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/8/2022 1333956 Complete 4584849 57808 BASSETT ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65446854 -72.77954102 null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1300752 $20,900.00 $150.00 $22,250.00 $42,506.10 Awaiting MR Payment NetSpeed LLC 8/30/2022 10/6/2022 1347218 Complete 4606179 6025 CHARLENE DR New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.68915176 -72.78689575 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1297103 $20,400.00 $150.00 $23,000.00 $174,719.23 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/22/2022 1341275 Complete 4568222 45069 HART ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65898514 -72.80004883 MAKE-READY Shift Raise null null null raise secondary 4" Y CONNECTICUT LIGHT&POWER New or Replace Poles 1297103 $20,400.00 $150.00 $23,000.00 $174,719.23 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/22/2022 1341275 Complete 4575981 55882 GARDEN ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66263962 -72.80147552 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1297103 $20,400.00 $150.00 $23,000.00 $174,719.23 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/22/2022 1341275 Complete 4903632 55882-S GARDEN ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66266632 -72.80160522 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1297103 $20,400.00 $150.00 $23,000.00 $174,719.23 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/22/2022 1341275 Complete 4903907 57063 LIBERTY ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66492081 -72.79546356 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1297103 $20,400.00 $150.00 $23,000.00 $174,719.23 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/22/2022 1341275 Complete 4572131 50707 HART ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.65930939 -72.7955246 MAKE-READY Shift Raise null null null raise secondary 6" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1297103 $20,400.00 $150.00 $23,000.00 $174,719.23 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/22/2022 1341275 Complete 4574353 57050 WOODBINE ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66172791 -72.79582214 MAKE-READY Shift Raise null null null raise secondary 6" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1297103 $20,400.00 $150.00 $23,000.00 $174,719.23 Awaiting MR Payment NetSpeed LLC 8/30/2022 9/22/2022 1341275 Complete 4576849 50649 WOODBINE ST New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66165924 -72.79547882 MAKE-READY Shift Raise null null null raise secondary 6" Y FRONTIER -72.762146 MAKE-READY Shift Raise null null null raise secondary 18" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330722 $19,025.00 $150.00 $21,500.00 $1,306.17 Survey Overdue NetSpeed LLC 8/31/2022 10/25/2022 1353280 Complete 4589615 1351 EAST ST New Britain FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330722 $19,025.00 $150.00 $21,500.00 $1,306.17 Survey Overdue NetSpeed LLC 8/31/2022 10/25/2022 1353280 Complete 4577310 5513 JOHN DOWNEY DR New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66917801 -72.75514984 MAKE-READY Shift Raise null null null raise secondary 21" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330722 $19,025.00 $150.00 $21,500.00 $1,306.17 Survey Overdue NetSpeed LLC 8/31/2022 10/25/2022 1353280 Complete 4600329 5505 JOHN DOWNEY DR New Britain CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.67162704 -72.75598907 MAKE-READY Shift Raise null null null raise secondary 6" Y New Britain FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.67860413 -72.76210022 MAKE-READY Shift Raise null null null raise secondary 5" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330725 $9,900.00 $150.00 $9,750.00 $2,687.02 Awaiting MR Payment NetSpeed LLC 8/31/2022 10/25/2022 1353291 Complete 4906043 1361 EAST ST 41.67527008 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330728 $23,400.00 $150.00 $24,125.00 $1,554.47 Awaiting MR Payment NetSpeed LLC 8/31/2022 10/25/2022 1353294 Complete 4600417 4536 GOLF BLVD New Britain FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.69905472 -72.76836395 MAKE-READY Shift Raise null null null raise secondary 6" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330734 $22,525.00 $150.00 $24,000.00 $8,366.44 Awaiting MR Payment NetSpeed LLC 8/31/2022 10/25/2022 1353302 Complete 4637019 134 STANLEY ST New Britain FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.70679855 -72.7755661 MAKE-READY Street Light Bracket null null null raise SL 15" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330734 $22,525.00 $150.00 $24,000.00 $8,366.44 Awaiting MR Payment NetSpeed LLC 8/31/2022 10/25/2022 1353302 Complete 4623004 3736 HARTFORD RD New Britain FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.7063942 -72.76786804 MAKE-READY Shift Raise null null raise secondary 20" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330737 $23,275.00 $150.00 $23,000.00 $2,262.92 Awaiting MR Payment NetSpeed LLC 8/31/2022 11/2/2022 1355716 Complete 4605028 98830 FARMINGTON AVE New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.69897461 -72.79167175 MAKE-READY Shift Raise null null null REQUESTING ES TO REPLACE POLE WITH 50'-2 DUE TO CAMM MED SPAN CLEARENCE TRANSFER EXISTING POWER raise secondary 48" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330737 $23,275.00 $150.00 $23,000.00 $2,262.92 Awaiting MR Payment NetSpeed LLC 8/31/2022 11/2/2022 1355716 Complete 4609366 3945 FARMINGTON AVE New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.69911575 -72.79193115 MAKE-READY Shift Raise null null Existing double pole in field raise secondary 15" Y FRONTIER 41.70145416 -72.78427887 MAKE-READY Shift Raise null null null raise secondary 17" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1330737 $23,275.00 $150.00 $23,000.00 $2,262.92 Awaiting MR Payment NetSpeed LLC 8/31/2022 11/2/2022 1355716 Complete 4631625 5182 VIOLA LN New Britain FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1330784 $25,150.00 $150.00 $25,375.00 $32,380.44 Awaiting MR Payment NetSpeed LLC 8/31/2022 11/2/2022 1355723 Complete 4588120 6408 MARWOOD DR New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.68148422 -72.81533813 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1330784 $25,150.00 $150.00 $25,375.00 $32,380.44 Awaiting MR Payment NetSpeed LLC 8/31/2022 11/2/2022 1355723 Complete 4906633 6402 WINFIELD DR New Britain CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.68227386 -72.81443787 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1332222 $10,775.00 $150.00 $10,625.00 $7,102.79 Make-Ready Overdue CROWN CASTLE 9/2/2022 9/14/2022 1337704 Complete 4781000 906 SELES RD Ashford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.86337771 -72.18664198 null null REPLACE null ES TO REPLACE POLE WITH 40/2. TRANSFER EXISTING POWER Existing Attachment auto-added. Y $3,121.67
  4. Page 4 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 4 of 39 Category ConversationID CONNECTICUT LIGHT&POWER New or Replace Poles 1332222 CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1333748 1333899 1333899 Frontier Application Fees $10,775.00 $275.00 $9,900.00 $9,900.00 CL&P Application Fees $150.00 $150.00 $150.00 $150.00 CL&P Survery Fees $10,625.00 $125.00 $10,875.00 $10,875.00 Make-Ready Estimate Amount $7,102.79 True-Up Cost $3,121.67 $2,178.36 ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo StreetAddress Town OwnerName Custodian Latitude Longitude AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason PoleComment Make-Ready Overdue CROWN CASTLE 9/2/2022 9/14/2022 1337704 Complete 4766870 971 SELES RD Ashford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.86258878 -72.1860605 null null REPLACE null Awaiting MR Payment $23,640.38 Make-Ready Overdue $23,640.38 Make-Ready Overdue Tilson Technology Management Precision Valley Communications Precision Valley Communications 9/8/2022 9/12/2022 9/12/2022 11/2/2022 9/29/2022 9/29/2022 1355707 1344793 1344793 Complete Complete Complete 4571466 4592304 4596792 537 2650 2663 WHITING ST MAJOR DR MAJOR DR Plainville Plainfield Plainfield CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.6709938 -72.86708069 41.69039917 -71.87830353 41.689888 -71.88032532 MAKE-READY null null Other null null null REPLACE REPLACE PowerSurveyAttachmentComment Billable ES TO REPLACE POLE WITH 40/2. TRANSFER EXISTING POWER Existing Attachment auto-added. Y null null Raise Secondary and Streetlight 25"; Extend 2" Secondary riser 25" with 3" PVC shield; Remove Weatherhead Y null Inst 40' class 1 pole (Sole) / Rmv. 35' class 4 pole.Inst. 10" PISA at a lead of 11' for DE Tap.Inst. (2) 14M ins. anc. guys at 42" & 84", attach to 11'L DE anc.Inst. (2) 14M non-ins. span guys at 82" & 84" run to poles 309 & 2660 (attach opposite Sec. DE at pole 2660 & 12" below SL bracket at 309).Attach DE Sec. at 82".Transfer street light. Existing Attachment auto-added. Y null Inst 40' class 1 pole (Sole) / Rmv. 35' class 4 pole.Inst. (2) 14" PISAs at leads of 8' & 11' for DDE Pri.Inst. (3) 18M ins. anc. guys at 22", 24", 42" & 44", attach to 14'L and 16'L DE ancs. (attach 2 to each anc.)Attach DE Sec. at 82".Transfer street light. Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1333899 $9,900.00 $150.00 $10,875.00 $23,640.38 Make-Ready Overdue Precision Valley Communications 9/12/2022 9/29/2022 1344793 Complete 4604562 2661 MAJOR DR Plainfield CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.68960953 -71.87905121 null null REPLACE null Inst 40' class 2 pole (Sole) / Rmv. 35' class 4 pole.Inst. 10" & 14" PISAs at leads of 14' & 16' for DDE Pri.Inst. (3) 18M ins. anc. guys at 22", 24" & 44", attach to 14'L and 16'L DE ancs. (attach 2 to 16'L anc.)Attach DE Sec. at 82".Transfer street light. CONNECTICUT LIGHT&POWER New or Replace Poles 1342490 $2,900.00 $150.00 $2,875.00 $41,837.58 Awaiting MR Payment Tilson Technology Management 9/23/2022 10/25/2022 1353222 Complete 4734613 2224 PARK AVE Windsor CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.83859253 -72.66251373 null null REPLACE null EVS TO REPLACE POLE WITH 45/2 Existing Attachment auto-added. Y FTR TO REPLACE POLE WITH 45/1 FTR Inst 45' class 1 pole (JO) / Remove 40' class 4 pole. Splice new TPX Neut. into existing 1/0 Neut., attach at 109". Y null null Complete installation of 1/0 TPX & connect to existing Sec.. Y null Inst 45' class 2 pole (FO) / Remove 40' class 3 pole.Inst. (1) anc. at a lead of 14' for corner bisector.Inst. 1/0 TPX to pole 4056, removing existing 1/0 Neut., attach at 82". Inst. (1) 14M ins. anc. guy at 22", attach to the 14' lead bisector anc.. Existing Attachment auto-added. Y Y Non CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles 1344381 1344932 1344932 $400.00 $0.00 $0.00 $150.00 $150.00 $150.00 $50.00 $50.00 $50.00 $2,522.20 $2,853.83 $2,853.83 $5,783.78 $3,970.09 $3,970.09 Attachment Overdue Attachment Overdue Attachment Overdue VERIZON WIRELESS MD7, LLC MD7, LLC 9/28/2022 9/30/2022 9/30/2022 11/10/2022 11/2/2022 11/2/2022 1357964 1355693 1355693 Complete Complete Complete 4274967 4590648 4603056 128 4056 8433 OENOKE RDG MANAFORT DR STRATFORD RD New Canaan FRONTIER/CONNECTICUT LIGHT&POWER New Britain FRONTIER/CONNECTICUT LIGHT&POWER New Britain CONNECTICUT LIGHT&POWER FRONTIER FRONTIER CONNECTICUT LIGHT&POWER 41.76379013 -72.73436737 null null REPLACE null POWER TO REPLACE POLE WITH A 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER 41.76379013 -72.73436737 null null REPLACE null POWER TO REPLACE POLE WITH A 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER 41.75933075 -72.73190308 MAKE-READY Shift Raise null null null raise secondary 6" Y Existing Attachment auto-added. Y Awaiting MR Payment null 10/13/2022 11/23/2022 1361991 Complete -1 3742-S 31 King Arthur's Way Newington FRONTIER (AT&T - CT) CONNECTICUT LIGHT&POWER New or Replace Poles 1341486 $650.00 $150.00 $625.00 $33,388.27 Awaiting MR Payment NetSpeed LLC 11/10/2022 12/8/2022 1366383 Complete 4658867 4573 FARMINGTON AVE West Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1341486 $650.00 $150.00 $625.00 $33,388.27 Awaiting MR Payment NetSpeed LLC 11/10/2022 12/8/2022 1366383 Complete 4658867 4573 FARMINGTON AVE West Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1349746 $1,525.00 $150.00 $1,375.00 $266.05 Make-Ready Overdue NetSpeed LLC 11/12/2022 12/8/2022 1366427 Complete 4654628 4106 AVALON RD West Hartford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1333215 $2,400.00 $150.00 $2,875.00 $22,483.66 Awaiting MR Payment $296.48 Awaiting MR Payment NetSpeed LLC NetSpeed LLC 11/12/2022 11/12/2022 12/8/2022 12/7/2022 1366440 1366069 Complete Complete 4686144 4919487 3997 2613 BOULEVARD QUAKER LN N REPLACE null $16,690.82 $1,000.00 null null null null $1,250.00 $150.00 null Other REPLACE null $150.00 $1,275.00 41.68814468 -72.76763916 MAKE-READY Transfer To New Pole Other $900.00 1350013 41.68837357 -72.76728058 null MAKE-READY 1344215 CONNECTICUT LIGHT&POWER New or Replace Poles -73.5201416 Install down guy at H=27'7" with 14M to existing 1"TT anchor L=5'; Install 14M span guy backing primary to P.3742 CONNECTICUT LIGHT&POWER Make-Ready Attachments $250.91 41.18086624 FRONTIER (AT&T 41.70666566 -72.74979651 CT) West Hartford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.75862122 -72.72790527 null null REPLACE null ES TO REPLACE POLE WITH 45/1 DUE TO COMM CLEARENCE TRANSFER EXISTING POWER TRANSFER West Hartford FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.77596283 -72.72782135 MAKE-READY Street Light Bracket null null null raise streetlight 8" Y FRONTIER 41.77581406 -72.72649384 MAKE-READY Street Light Bracket null null null raise streelight 14" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1333215 $2,400.00 $150.00 $2,875.00 $296.48 Awaiting MR Payment NetSpeed LLC 11/12/2022 12/7/2022 1366069 Complete 4683379 2857 FOXCROFT RD West Hartford FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1353921 $13,400.00 $150.00 $13,625.00 $21,002.00 Awaiting MR Payment NetSpeed LLC 11/12/2022 12/8/2022 1366459 Complete 4661730 1824 TROUT BROOK DR West Hartford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.75631714 -72.73582459 null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1353921 $13,400.00 $150.00 $13,625.00 $21,002.00 Awaiting MR Payment NetSpeed LLC 11/12/2022 12/8/2022 1366459 Complete 4661089 827 VERA ST West Hartford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.75605392 -72.735466 null null REPLACE null ES replace pole 35/2 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1353934 $6,400.00 $150.00 $6,125.00 $18,425.80 Awaiting MR Payment NetSpeed LLC 11/12/2022 12/8/2022 1366462 Complete 4664564 3993 BOULEVARD West Hartford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.75893784 -72.72619629 null null REPLACE null EVS TO REPLACE POLE WITH 45/2 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1350013 $1,275.00 $150.00 $1,000.00 $22,483.66 Awaiting MR Payment NetSpeed LLC 11/12/2022 12/8/2022 1366440 Complete 4672815 3996 BOULEVARD West Hartford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.75868607 -72.72756958 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1361925 $275.00 $150.00 $125.00 $7,059.33 $8,380.66 Inspection CROWN CASTLE 11/23/2022 11/30/2022 1363240 Complete 4496884 993 BUNKER HILL AVE Waterbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.56851959 -73.06362152 null null REPLACE null ES TO REPLACE POLE WITH 45/1 TRANSFER EXISTING POWER Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1430717 $1,650.00 $150.00 $1,875.00 $4,827.50 $4,837.28 Make-Ready Overdue Siena Engineering Group 5/4/2023 5/22/2023 1437680 Complete 4231667 2820 LONG RIDGE RD Stamford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.0740069 null null REPLACE null EVS TO REPLACE POLE WITH 45/1EVS TO BUY 5' EXTRA Existing Attachment auto-added. Y null Nonbillable raise secondary 24" install guy Billable raise SL 20" street light height meets existing clearance requirements but needs to shift up for comms to go up to fit new attachment Y Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1628139 $26,650.00 $150.00 $26,625.00 $113.75 Awaiting MR Payment NetSpeed LLC 2/7/2024 2/22/2024 1655870 Complete 4487502 83028 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1628187 $25,900.00 $150.00 $26,000.00 $26,199.92 Awaiting MR Payment NetSpeed LLC 2/7/2024 2/22/2024 1655873 Complete 4511758 815 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1628187 $25,900.00 $150.00 $26,000.00 $26,199.92 Awaiting MR Payment NetSpeed LLC 2/7/2024 2/22/2024 1655873 Complete 4504836 828 Meriden CONNECTICUT LIGHT&POWER/FRONTIER COLONY RD Meriden FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.56320148 -72.78300616 MAKE-READY Shift Raise null null null raise secondary 4" no existing clearance violation. shift needed to fit new comm COLONY RD Meriden FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.56745529 -72.78014374 MAKE-READY Shift Raise null null DOUBLE POLE raise secondary 14" raise sl 6" Y FRONTIER null raise SL 16" no existing clearance issue. sl shift needed to fit new comm Y CONNECTICUT LIGHT&POWER KENSINGTON AVE CONNECTICUT LIGHT&POWER -73.5509532 41.54985046 -72.79584503 MAKE-READY Shift Raise null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1628187 $25,900.00 $150.00 $26,000.00 $26,199.92 Awaiting MR Payment NetSpeed LLC 2/7/2024 2/22/2024 1655873 Complete 4493456 4502 STONYCREST DR Meriden FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1743990 $25,775.00 $150.00 $26,250.00 $2,083.77 Awaiting MR Payment NetSpeed LLC 12/12/2024 1/2/2025 1787812 Complete 4407444 3377 LAKEVIEW AVE Danbury CONNECTICUT LIGHT&POWER Meriden FRONTIER/CONNECTICUT LIGHT&POWER Middletown FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.54990387 -72.65065002 MAKE-READY Shift Raise null Middletown FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.5524292 MAKE-READY Shift Raise null Non CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments 1615306 1632493 1632493 $25,400.00 $25,275.00 $25,275.00 $150.00 $150.00 $150.00 $25,250.00 $26,125.00 $26,125.00 $26,143.85 $1,303.07 $1,303.07 Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC 12/6/2023 3/15/2024 3/15/2024 1/4/2024 3/20/2024 3/20/2024 1634885 1666600 1666600 Complete Complete Complete 4443116 4487508 4490618 5541 1295 8060 APPLEWOOD DR WARWICK ST S MAIN ST FRONTIER 41.5565567 null -72.77805328 MAKE-READY Street Light Bracket null null 41.44952393 -73.43367767 MAKE-READY Shift Raise null null null raise secondary 55" extend riser Y null FTR TO REPLACE POLE WITH 40-2 PER EL REQUEST FTR replace pole 40/2 Y null null raise secondary 13" raise aerial cable 11" extend riser Y null null raise secondary 14" raise aerial cable 23" Y 41.51241195 -72.81203647 -72.64931488 null Transfer To New Pole REPLACE
  5. Page 5 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 5 of 39 Category CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments ConversationID 1739920 1739920 1739920 1623191 Frontier Application Fees $25,150.00 $25,150.00 $25,150.00 $25,025.00 CL&P Application Fees $150.00 $150.00 $150.00 $150.00 CL&P Survery Fees $25,000.00 $25,000.00 $25,000.00 $25,500.00 Make-Ready Estimate Amount $87,194.84 $87,194.84 $87,194.84 $433.04 True-Up Cost ConversationCurrentStatus Make-Ready Overdue Make-Ready Overdue Make-Ready Overdue Awaiting MR Payment PermittingCompany Siena Engineering Group Siena Engineering Group Siena Engineering Group NetSpeed LLC ApplicationSubmitted 9/5/2024 9/5/2024 9/5/2024 2/6/2024 SurveyStart 9/11/2024 9/11/2024 9/11/2024 2/22/2024 PowerSurvey 1743604 1743604 1743604 1655822 PowerSurveyStatus Complete Complete Complete Complete PoleID 4526609 4517897 4508912 4471283 PoleNo 3181 6319 2058 2745 StreetAddress MIDDLE ST MIDDLE ST MIDDLE ST EDGEMARK ACRES RD Town Middletown Middletown Middletown Meriden OwnerName CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER Custodian CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Latitude Longitude 41.59238434 -72.72109985 41.59282684 -72.72111511 41.5842514 -72.7209549 41.53385544 -72.84059906 AttachmentWorkType null null null MAKE-READY AttachmentMRAction null null null Shift Raise PoleWorkType REPLACE REPLACE REPLACE null PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable null ES set 45' class 1 pole (JO) / Abdn. 40' class 3.Inst. (1) anc. at a lead of 12' for DE.Attach Sec./Sec. tap at 109".Inst. (1) 14M non-ins. anc. guy at 109", attach to the 12' lead DE anc...Transfer cutouts & xfrmr bank (Inst. zap shields)Note: Pole replaced at phones request, due to clearances to ground level with new attachment (power space at 40' pole joint space). Existing Attachment auto-added. Y null ES set 45' class 1 pole (JO) / Abdn. 40' class 2.Inst. (1) anc. at a lead of 14' for corner bisector.Attach Sec. at 109".Inst. (1) 18M ins. anc. guy at 22", attach to the 14' lead bisector an...Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES set 50' class 1 pole (JO) / Abdn. 45' class 3.Inst. (2) ancs. at leads of 20' & 24' for DE (24' for ES use only).Attach Sec. DE at 128".Attach Neut./Neut. tap at 136".Inst. (2) 18M ins. anc. guys at 50" & 51", attach both to the 24' lead DE anc.Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null raise step xfmr 24" raise sec 24" no existing clearance violation. shift up required to make space for new comm Y Y null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1623191 $25,025.00 $150.00 $25,500.00 $433.04 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655822 Complete 4464679 83609 ALLEN AVE Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53865433 -72.82949829 MAKE-READY Shift Raise null null null raise secondary 6" raise sl 16" no existing clearance violation. shift up required to make space for new comm CONNECTICUT LIGHT&POWER Make-Ready Attachments 1623191 $25,025.00 $150.00 $25,500.00 $433.04 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655822 Complete 4477396 83585 CENTENNIAL AVE Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53863144 -72.82369995 MAKE-READY Shift Raise null null null raise secondary 4" existing clearances met on pole. raise needed to fit new comm Y Remove: 35/5Install: 35/2Replace due to overload on pole; Attach Secondary 52" from pole top; Replace Secondary Span Guy with 14M to P. 1333; Shift Service mid-span Existing Attachment auto-added. Y Raise Secondary 56"; Shift Services midspan Y FTR replace pole 40/1 Y Y CONNECTICUT LIGHT&POWER New or Replace Poles 1582381 $24,900.00 $150.00 $25,375.00 $3,696.72 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604410 Complete 4290989 1216 ATTAWANHOOD TER Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28187943 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1582381 $24,900.00 $150.00 $25,375.00 $3,696.72 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604410 Complete 4289714 1548 NEPTUNE AVE Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Meriden FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER Non CONNECTICUT LIGHT&POWER New or Replace Poles 1614281 $24,900.00 $150.00 $24,500.00 $465.12 Awaiting MR Payment NetSpeed LLC 12/6/2023 1/4/2024 1634893 Complete 4458078 4814 HAMPSHIRE RD -72.4010849 null null REPLACE null 41.28017807 -72.39765167 MAKE-READY Other null null 41.52762222 -72.79411316 TRANSFER Transfer To New Pole REPLACE null null FTR TO REPLACE POLE WITH 40-1 PER EL REQUEST TRANSFER EXSTING POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1655446 $24,900.00 $150.00 $26,000.00 $35,826.08 Awaiting MR Payment NetSpeed LLC 9/27/2024 10/10/2024 1755767 Complete 4370659 766 ELM ST Danbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.39556122 -73.45683289 null null REPLACE null ES Install: 45/1Remove: 40/2Replace due to clearance issues; Cut and kick due to riser at pole/location of pole; Attach secondary 136" from pole top; Replace primary DG to ES set 1" TT anchor, LL=12', P=DE CONNECTICUT LIGHT&POWER Make-Ready Attachments 1736020 $24,900.00 $150.00 $24,750.00 $1,685.85 Awaiting MR Payment NetSpeed LLC 12/12/2024 1/2/2025 1787863 Complete 4386502 3638 DENVER TER Danbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.42380524 -73.44857788 MAKE-READY Street Light Bracket null null DOUBLE POLE. Existing Attachment auto-added. install down guy (nonbillable) raise sl 8" (billable) no existing NESC clearance violation. SL needs to be raised to fit new comm CONNECTICUT LIGHT&POWER New or Replace Poles 1621062 $24,775.00 $150.00 $25,500.00 $22,277.32 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655707 Complete 4477276 92797 FREMONT ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52636719 -72.82067108 null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1621062 $24,775.00 $150.00 $25,500.00 $22,277.32 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655707 Complete 4452263 90881 PROSPECT AVE Meriden CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.52543259 -72.81563568 null null REPLACE null ES replace pole 50/1 Existing Attachment auto-added. Y Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52598953 -72.81902313 MAKE-READY Street Light Bracket null null null raise SL 12" Y Meriden CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.52561569 -72.81593323 null null REPLACE null ES replace pole 50/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Existing Attachment auto-added. Y raise sl 12" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles 1621062 1621062 $24,775.00 $24,775.00 $150.00 $150.00 $25,500.00 $25,500.00 $22,277.32 $22,277.32 Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC 2/6/2024 2/6/2024 2/22/2024 2/22/2024 1655707 1655707 Complete Complete 4456690 4476562 90871 90880 BALDWIN ST PROSPECT AVE CONNECTICUT LIGHT&POWER New or Replace Poles 1623350 $24,775.00 $150.00 $24,750.00 $5,415.30 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655824 Complete 4482565 90129 CHAMBERLAIN HWY Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1630923 $24,775.00 $150.00 $24,750.00 $1,280.67 Awaiting MR Payment NetSpeed LLC 3/14/2024 3/20/2024 1666611 Complete 4462548 1610 DEERFIELD AVE Middletown FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1929607 $24,775.00 $150.00 $25,125.00 $8,264.95 Awaiting MR Payment NetSpeed LLC 10/17/2025 10/22/2025 1939951 Complete 4581454 8041 PARK ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1929607 $24,775.00 $150.00 $25,125.00 $8,264.95 Awaiting MR Payment NetSpeed LLC 10/17/2025 10/22/2025 1939951 Complete 4577093 8057 PARK ST Bristol CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments 1597770 1597770 1597770 1597770 1648035 $24,650.00 $24,650.00 $24,650.00 $24,650.00 $24,525.00 $150.00 $150.00 $150.00 $150.00 $150.00 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $24,625.00 $1,011.04 $1,011.04 $1,011.04 $1,011.04 $8,618.25 Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC 11/15/2023 11/15/2023 11/15/2023 11/15/2023 2/6/2024 11/21/2023 11/21/2023 11/21/2023 11/21/2023 2/22/2024 1619423 1619423 1619423 1619423 1655689 Complete Complete Complete Complete Complete 4708151 4701811 4706497 4707915 4483645 3142 4388 4387 4382 428 GREEN RD PARKER ST PARKER ST PARKER ST JOHNSON AVE null null REPLACE null ES replace pole 45/2 due to insufficient room in comm space -72.64070892 MAKE-READY Street Light Bracket null null null CONNECTICUT LIGHT&POWER 41.67230225 -72.96031189 MAKE-READY Shift Raise null null null CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.67135972 -72.96614147 MAKE-READY Street Light Bracket null null null raise secondary 4" existing clearance 45" from sec to comms. comms needs extra shift up to fit new comm raise SL 16" existing clearance from comms to SL is 17" no existing NESC violation. SL needs to shift up to make space for new comm Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79089737 -72.507164 MAKE-READY Street Light Bracket null null null raise streetlight 8" Y Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79304886 -72.50635529 MAKE-READY Shift Raise null null null raise secondary 4" Y Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79331589 -72.50641632 MAKE-READY Shift Raise null null null raise secondary 4" Y Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79497147 -72.50650024 MAKE-READY Shift Raise null null null raise secondary and streetlight 16" Y Meriden FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.54497147 -72.84552002 raise secondary 16" and raise sl 12" Y CONNECTICUT LIGHT&POWER 41.54779434 -72.81526184 41.5364151 CONNECTICUT LIGHT&POWER New or Replace Poles 1648035 $24,525.00 $150.00 $24,625.00 $8,618.25 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655689 Complete 4486783 2359 SURREY DR Meriden CONNECTICUT LIGHT&POWER/FRONTIER 41.54914856 -72.84081268 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1648035 $24,525.00 $150.00 $24,625.00 $8,618.25 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655689 Complete 4473609 439 JOHNSON AVE Meriden FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.54402924 -72.84060669 CONNECTICUT LIGHT&POWER New or Replace Poles 1648035 $24,525.00 $150.00 $24,625.00 $8,618.25 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655689 Complete 4474300 84089 SPRUCE ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.54452515 -72.83631897 Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.54628372 -72.83517456 CONNECTICUT LIGHT&POWER New or Replace Poles 1648035 $24,525.00 $150.00 $24,625.00 $8,618.25 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655689 Complete 4481142 923 SPRUCE ST Y Y Y Shift Raise null null FTR TO REPLACE POLE WITH 45/2 DUE TO CLEARANCE OVER THE ROAD TRANSFER EXISTING POWER null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y MAKE-READY Shift Raise null null null raise secondary 12" Y null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y MAKE-READY
  6. Page 6 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 6 of 39 Category ConversationID Frontier Application Fees CL&P Application Fees CL&P Survery Fees Make-Ready Estimate Amount True-Up Cost ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo CONNECTICUT LIGHT&POWER Make-Ready Attachments 1648035 $24,525.00 $150.00 $24,625.00 $8,618.25 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655689 Complete 4482022 4007 CONNECTICUT LIGHT&POWER New or Replace Poles 1648035 $24,525.00 $150.00 $24,625.00 $8,618.25 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655689 Complete 4493326 84091 StreetAddress AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable 41.54449463 -72.84291077 MAKE-READY Shift Raise null null null raise secondary 28" Y CONNECTICUT LIGHT&POWER 41.54388046 -72.83674622 null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y FRONTIER 41.54581833 -72.82967377 MAKE-READY Street Light Bracket null null null raise sl 4" Y MAKE-READY Other null null null dress drip loop Y Town OwnerName Custodian CYNROSE PL Meriden FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER SPRUCE ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER Latitude Longitude CONNECTICUT LIGHT&POWER Make-Ready Attachments 1648035 $24,525.00 $150.00 $24,625.00 $8,618.25 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655689 Complete 4484393 19 W MAIN ST Meriden FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1961834 $24,400.00 $150.00 $26,250.00 $10,251.07 Awaiting MR Payment NetSpeed LLC 1/9/2026 1/26/2026 1976470 Complete 4642095 723 WOODSIDE ST Burlington CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.7399559 CONNECTICUT LIGHT&POWER New or Replace Poles 1961834 $24,400.00 $150.00 $26,250.00 $10,251.07 Awaiting MR Payment NetSpeed LLC 1/9/2026 1/26/2026 1976470 Complete 4642126 732 WESTSIDE BLVD Burlington CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.74023056 -72.90556335 null null REPLACE null ES replace pole 35/2 due to clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1961834 $24,400.00 $150.00 $26,250.00 $10,251.07 Awaiting MR Payment NetSpeed LLC 1/9/2026 1/26/2026 1976470 Complete 4627201 7632 STAFFORD RD Burlington CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.72866058 -72.90891266 null null REPLACE null ES replace pole 35/2 due to clearance Existing Attachment auto-added. Y FRONTIER 41.52568054 -72.75302887 MAKE-READY Shift Raise null null null raise secondary 60" Y -72.90562439 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1626598 $24,275.00 $150.00 $24,250.00 $8,456.74 Awaiting MR Payment NetSpeed LLC 2/7/2024 2/22/2024 1655826 Complete 4476553 3295 E MAIN ST Meriden FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4457067 81789 SUMMER ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53062115 -72.81247102 null null REPLACE null ES replace pole 45/2 due to sec to comms clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4457075 8794 SUMMER ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53068161 -72.81295013 null null REPLACE null ES replace pole 45/2 due to sec to comms clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4459555 81809 SUMMER PL Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53069305 -72.81027985 null null REPLACE null ES replace pole 40/2 due to sec to comms clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4458132 84550 SPRING ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52897263 -72.81204987 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4458666 93791 NEW HANOVER AVE Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52288437 -72.81523895 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4461331 93805 NEW HANOVER AVE Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52618408 -72.81182861 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4462755 87899 ALCOVE ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52804184 -72.81080627 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4462771 635 ALCOVE ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.5282135 -72.81214142 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4458204 84552 SPRING ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52947235 -72.81177521 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4469047 84555 SPRING ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53008652 -72.81143188 MAKE-READY Street Light Bracket null null null raise sl 24" Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4468445 81790 SUMMER ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53077316 -72.81338501 null null REPLACE null ES replace pole 40/2 due to height difference Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4449284 1246 NEW HANOVER AVE Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.51824951 -72.8214798 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4458211 14 NEW HANOVER AVE Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.51847839 -72.82109833 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4458248 84601 NEW HANOVER AVE Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.51885605 -72.82045746 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4886847 84600 NEW HANOVER AVE Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.51910019 -72.82004547 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 $24,150.00 $150.00 $24,500.00 $69,932.69 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655704 Complete 4463634 93793 NEW HANOVER AVE Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52331162 -72.81475067 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52357864 -72.81266022 MAKE-READY Shift Raise null null null raise secondary 23" and raise sl 37" Y Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null ES replace pole 40/2 due to comms to ground clearance Existing Attachment auto-added. Y Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null ES replace pole 45/2 due to comms to ground clearance Existing Attachment auto-added. Y Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.52533722 -72.81278229 null null REPLACE null Existing Attachment auto-added. Y Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.66775131 -72.94020844 null null REPLACE null Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER 41.66783142 -72.94306946 null null REPLACE null ES replace pole 40/2 due to comms to ground clearance ES replace pole 45/2 due to needing more spaceno existing NESC clearance violation. taller pole needed to fit new comm ES replace pole 45/1 5E due to needing more spaceno existing NESC clearance violation. taller pole needed to fit new comm Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1620863 1620863 1620863 1620863 1931646 $24,150.00 $24,150.00 $24,150.00 $24,150.00 $24,150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $24,500.00 $24,500.00 $24,500.00 $24,500.00 $24,000.00 $69,932.69 $69,932.69 $69,932.69 $69,932.69 $59,062.90 Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC 2/6/2024 2/6/2024 2/6/2024 2/6/2024 10/15/2025 2/22/2024 2/22/2024 2/22/2024 2/22/2024 10/22/2025 1655704 1655704 1655704 1655704 1939988 Complete Complete Complete Complete Complete 4475165 4455239 4454009 4454755 4575877 90890 93795 13 93801 14593 LANOUETTE ST NEW HANOVER AVE LANOUETTE ST NEW HANOVER AVE SOUTH ST 41.52384949 -72.81414032 41.52386856 -72.81243896 null null null null REPLACE REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1931646 $24,150.00 $150.00 $24,000.00 $59,062.90 Awaiting MR Payment NetSpeed LLC 10/15/2025 10/22/2025 1939988 Complete 4596199 14599 SOUTH ST Bristol CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER New or Replace Poles 1613864 $24,025.00 $150.00 $24,000.00 $77,954.55 Awaiting MR Payment NetSpeed LLC 12/6/2023 1/4/2024 1634912 Complete 4482753 84929 E MAIN ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53245163 -72.78790283 null null REPLACE null ES replace pole 50/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1613864 $24,025.00 $150.00 $24,000.00 $77,954.55 Awaiting MR Payment NetSpeed LLC 12/6/2023 1/4/2024 1634912 Complete 4888367 84930 E MAIN ST Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53237152 -72.78762817 null null REPLACE null ES replace pole 50/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1615004 $24,025.00 $150.00 $24,375.00 $124,712.93 Awaiting MR Payment NetSpeed LLC 12/6/2023 1/4/2024 1634887 Complete 4449458 2082 HALL AVE Meriden FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.5213089 -72.80597687 MAKE-READY Shift Raise null null null raise secondary 30" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1629947 $24,025.00 $150.00 $24,250.00 $112.19 Awaiting MR Payment NetSpeed LLC 3/14/2024 3/20/2024 1666644 Complete 4475914 3375 S MAIN ST Middletown FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.52528381 -72.66486359 MAKE-READY Street Light Bracket null null null raise SL 26" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1657399 $24,025.00 $150.00 $24,250.00 $12,046.77 Awaiting MR Payment NetSpeed LLC 7/1/2024 7/10/2024 1719615 Complete 4836890 2853 ENFIELD ST Enfield CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 42.00321579 MAKE-READY Shift Raise null null null raise secondary 18" and raise xfmr 12" Y -72.5927887
  7. Page 7 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 7 of 39 null CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.369133 null null REPLACE null Bethel CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.36759186 -73.41842651 null null REPLACE null Meriden FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.54795074 -72.79221344 MAKE-READY Transfer To New Pole null null null Meriden FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.55163574 -72.79099274 MAKE-READY Shift Raise null null null raise secondary 17" raise SL 6" Y null Install: 40/2Remove: 35/4Cut + Kick due to secondary risers; Replace due to load from comm attachment; Attach Secondary 82" from pole top; Transfer 50kVA XFMR, XFMR is fused, zap shield exists; Transfer (3) 3" Secondary Risers; Extend (3) 3" Secondary Risers 36" with 4" PVC Shield; Replace Primary Down Guy with 14M to existing anchor, LL-10' PDE Existing Attachment auto-added. Y null null Install 14M Down Guy to new ES set 1" TT anchor, LL-8' P-DE Y null Abandon: 35/2Install: 40/1Replace due to pole overload; Attach sec 82" from pole top; Install 14M span guy to P.1521 backing secondary; Install 14M span guy to P.1534 backing primary; Transfer 25 kVA XFMR; Shft (2) SVC’s mid span Existing Attachment auto-added. Y null Install: 45/1Abandon: 40/4Replace due to required facilities separation; Attach sec 136" from pole top; Replace prim tree guy with 14M down guy with new ES set 1"TT anchor LL=10', P=DE; Replace (2) C/O’s Existing Attachment auto-added. Y null Install: 40/2Abandon: 35/5Replace due to 5' rule; Attach sec 82" from pole top; Replace prim down guy with 14M to new ES set 1"TT anchor LL=12', P=6' Existing Attachment auto-added. Y null Install: 40/2Abandon: 35/4Replace due to 5' rule; Attach sec 82" from pole top; Replace prim down guy with 14M to new ES set 1"TT anchor L=15', P=10' Existing Attachment auto-added. Y Existing Attachment auto-added. Y NetSpeed LLC 7/1/2024 7/10/2024 1719615 Complete 4941035 2868 ENFIELD ST Enfield CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER $24,000.00 $38,090.85 Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619432 Complete 4681624 5291 HOLLISTER ST Manchester CONNECTICUT LIGHT&POWER $150.00 $24,125.00 $40,991.19 Awaiting MR Payment NetSpeed LLC 9/6/2024 9/18/2024 1746487 Complete 4345771 1532 OAKLAND HTS Bethel $23,900.00 $150.00 $24,125.00 $40,991.19 Awaiting MR Payment NetSpeed LLC 9/6/2024 9/18/2024 1746487 Complete 4871750 1158 OAKLAND HTS $23,775.00 $150.00 $24,500.00 $22,184.40 Awaiting MR Payment NetSpeed LLC 2/7/2024 2/22/2024 1655853 Complete 4497517 981 SHERMAN AVE CONNECTICUT LIGHT&POWER New or Replace Poles 1650853 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1628076 1581170 REPLACE Awaiting MR Payment $23,900.00 CONNECTICUT LIGHT&POWER New or Replace Poles null $12,046.77 1650853 1581170 null Custodian CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 41.78556442 -72.52326965 OwnerName $150.00 1581170 CONNECTICUT LIGHT&POWER ES replace pole 45/1 due to comms to ground clearance ES replace pole 45/2 due to midspan clearanceno existing NESC clearance violation. more space is needed to fit new comm ES replace pole 40/2 due to comm clearanceno pre-existing clearance issue. taller pole needed to fit new comm ES replace pole 45/1 due to comm clearanceno pre-existing clearance issue. taller pole needed to fit new comm Town $23,900.00 CONNECTICUT LIGHT&POWER New or Replace Poles null StreetAddress 1598009 1581170 REPLACE PoleNo CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles null PoleID $24,250.00 1563311 null PowerSurveyStatus $150.00 CONNECTICUT LIGHT&POWER Make-Ready Attachments 42.00702286 -72.59250641 PowerSurvey $24,025.00 1563311 PoleWorkReason SurveyStart 1657399 CONNECTICUT LIGHT&POWER New or Replace Poles PoleWorkType ApplicationSubmitted CONNECTICUT LIGHT&POWER New or Replace Poles 1628076 AttachmentMRAction PermittingCompany ConversationID CONNECTICUT LIGHT&POWER Make-Ready Attachments AttachmentWorkType ConversationCurrentStatus Frontier Application Fees $23,775.00 $23,525.00 $23,525.00 $23,400.00 $23,400.00 $23,400.00 $23,400.00 CL&P Application Fees CL&P Survery Fees Category $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $24,500.00 $24,000.00 $24,000.00 $23,250.00 $23,250.00 $23,250.00 $23,250.00 Make-Ready Estimate Amount $22,184.40 $30,875.10 $30,875.10 $122,503.54 $122,503.54 $122,503.54 $122,503.54 True-Up Cost Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC 2/7/2024 10/17/2023 10/17/2023 10/18/2023 10/18/2023 10/18/2023 10/18/2023 2/22/2024 10/25/2023 10/25/2023 10/25/2023 10/25/2023 10/25/2023 10/25/2023 1655853 1604475 1604475 1604420 1604420 1604420 1604420 Complete Complete Complete Complete Complete Complete Complete 4486418 4296249 4301527 4283542 4290088 4283454 4285063 4348 49 1538 1522 539 540 1062 HICKS ST SALTUS DR MAIN ST ATLANTIC DR KNOLLWOOD DR KNOLLWOOD DR NEPTUNE DR Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER Old Saybrook FRONTIER/CONNECTICUT LIGHT&POWER Old Saybrook Old Saybrook Old Saybrook Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Latitude 41.2915535 41.29088974 Longitude -73.41885376 -72.36750031 -72.3762207 41.26570129 -72.37314606 41.27004242 -72.37207794 41.2702713 -72.37207794 41.27000427 -72.37148285 null MAKE-READY null null null null null Other null null null null REPLACE null REPLACE REPLACE REPLACE REPLACE PoleComment PowerSurveyAttachmentComment Billable Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y FTR replace pole 45/2 due to comms to ground clearance Y CONNECTICUT LIGHT&POWER New or Replace Poles 1581170 $23,400.00 $150.00 $23,250.00 $122,503.54 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604420 Complete 4298220 313 MAPLE AVE Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.26568985 -72.38217163 null null REPLACE null Abandon: 40/3Install: 45/1Replace due to cracks at pole base; Attach sec 136" from pole top; Replace stub guy with 18M to P.313-S; Transfer 25 kVA XFMR; Shft (1) SVC midspan CONNECTICUT LIGHT&POWER Make-Ready Attachments 1581170 $23,400.00 $150.00 $23,250.00 $122,503.54 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604420 Complete 4282015 1795 SEAGULL RD Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.26584244 -72.38124084 MAKE-READY Other null null null Raise secondary 16"; Shft (2) SVC’s mid span Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1581170 $23,400.00 $150.00 $23,250.00 $122,503.54 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604420 Complete 4283562 1898 OSPREY RD Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.26631165 -72.38050842 MAKE-READY Other null null null Raise secondary 11" Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1581170 $23,400.00 $150.00 $23,250.00 $122,503.54 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604420 Complete 4862520 1717 OAKWOOD RD Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.26626587 -72.37966919 MAKE-READY Other null null null Extend 23'8" secondary riser with 4" PVC shield 12"; Re-sag secondary to P.2419 Y null Install: 40/2Abandon: 35/5Replace due to required facilities seperation; Attach sec 82" from pole top; Cut & Kick; Transfer 50 kVA XFMR to new pole Existing Attachment auto-added. Y null Abandon: 30/4Install: 35/2Replace due to change in P.324 to 45/1 and required 10' rule; Replace (2) primary DG with 14M to new ES 1" TT anchor set LL = 8', P = DE Existing Attachment auto-added. Y Abandon: 40/3Install: 45/1Replace due to cracks at pole base; Replace stub guy with 14M backing primary to P.315-S; Attach sec 136" from pole top Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1581170 1581170 $23,400.00 $23,400.00 $150.00 $150.00 $23,250.00 $23,250.00 $122,503.54 $122,503.54 Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC 10/18/2023 10/18/2023 10/25/2023 10/25/2023 1604420 1604420 Complete Complete 4279250 4281499 320 315-S OAKWOOD RD MAPLE AVE Old Saybrook Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.26561737 -72.37918091 41.26528168 -72.38103485 CONNECTICUT LIGHT&POWER New or Replace Poles 1581170 $23,400.00 $150.00 $23,250.00 $122,503.54 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604420 Complete 4283527 315 MAPLE AVE Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.2654953 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1581170 $23,400.00 $150.00 $23,250.00 $122,503.54 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604420 Complete 4284830 321 MAPLE AVE Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.26530075 -72.37880707 -72.38122559 null null null null REPLACE REPLACE null null REPLACE null MAKE-READY Other null null null Raise secondary 20" Y ES to set 45' class 1 pole (E5) / Remove 40' class 4 pole.Cut and kick pole for riser(s).Attach double tangent spacer cable brackets at 36".Attach Neut. at 130", attach Sec. DE at 136".Inst. cutouts & zap shield.Extend service riser conduit/cable for new pole height.Transfer xfrmr. Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1365517 $23,275.00 $150.00 $23,750.00 $53,644.59 Awaiting MR Payment NetSpeed LLC 1/4/2023 1/26/2023 1381646 Complete 4290340 472 BOSTON POST RD Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28129959 -72.45759583 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1600928 $23,275.00 $150.00 $24,000.00 $26,623.77 Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619449 Complete 4672766 7922 ADAMS ST Manchester CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.77700424 -72.54896545 null null REPLACE null ES replace pole 45/2 Existing Attachment auto-added. Y ES replace pole 40/2 due to comm spacingexisting clearances meet NESC but insufficient room to shift to make room for new comm Existing Attachment auto-added. Y null raise secondary 18" Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1656634 $23,150.00 $150.00 $23,500.00 $5,839.86 Awaiting MR Payment NetSpeed LLC 7/1/2024 7/10/2024 1719634 Complete 4836082 14391 LAUREL PARK Enfield CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.98176956 -72.60157013 null null REPLACE null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1601392 $23,025.00 $150.00 $23,875.00 $211.40 Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619459 Complete 4679870 3651 PIONEER CIR Manchester CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.76778793 -72.54945374 MAKE-READY Shift Raise null null CONNECTICUT LIGHT&POWER New or Replace Poles 1365510 $22,900.00 $150.00 $24,625.00 $376,659.22 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381641 Complete 4289603 1008 WANGUM RD Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.27468491 -72.47842407 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1365510 $22,900.00 $150.00 $24,625.00 $376,659.22 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381641 Complete 4291494 965 YOUNG RD Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.27278137 -72.48137665 null null REPLACE null Inst. 35' class 2 pole (JO) / Abdn. 25' class 4 pole.Attach Sec. at 52" (slack span). Inst. 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Cut and kick for riser.Attach Sec. at 82".Replace Svc. riser for new pole height.
  8. Page 8 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 8 of 39 Category ConversationID CONNECTICUT LIGHT&POWER New or Replace Poles 1365510 Frontier Application Fees $22,900.00 CL&P Application Fees $150.00 CL&P Survery Fees $24,625.00 Make-Ready Estimate Amount $376,659.22 True-Up Cost ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo StreetAddress Town OwnerName Custodian Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381641 Complete 4284942 454 INDIAN TRL Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365510 $22,900.00 $150.00 $24,625.00 $376,659.22 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381641 Complete 4303761 1491 HAMMOCK DOCK RD Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER New or Replace Poles 1365510 $22,900.00 $150.00 $24,625.00 $376,659.22 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381641 Complete 4285067 470 OLD MAIL TRL Westbrook CONNECTICUT LIGHT&POWER/FRONTIER AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason 41.27306366 -72.47834015 null null REPLACE null 41.27588654 -72.46941376 MAKE-READY Other null null 41.27007294 -72.47387695 null null REPLACE Latitude Longitude PoleComment Inst. 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach DE. Sec. at 82".Inst. (1) 14M non-ins. span guy at 82", run to pole 127 (attach 6" above Sec. at pole 127). PowerSurveyAttachmentComment Billable Existing Attachment auto-added. Y Extend Svc. Riser up to Svc. Level. Y null null Inst. 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach DE. Sec. at 82".Inst. (1) 14M non-ins. span guy at 82", run to pole 127 (attach 6" above Sec. at pole 127). Existing Attachment auto-added. Y Inst. 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Inst. (1) anc. at a lead of 21 for DE'.Attach DE Sec. at 52".Attach other end of span guy at 40", ran from pole 470.Inst. (1) 14M non-ins. anc. guy at 52", attach to the 21' DE anc. Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1365510 $22,900.00 $150.00 $24,625.00 $376,659.22 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381641 Complete 4290095 1005 OLD MAIL TRL Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.27011108 -72.47355652 null null REPLACE null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365510 $22,900.00 $150.00 $24,625.00 $376,659.22 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381641 Complete 4863720 672 ECKFORD AVE Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28050232 -72.46192169 MAKE-READY Other null null null Extend Svc. Riser up to Svc. Level. Y null Inst. to set 45' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Sec. at 109".Transfer Xfrmr and cutout. Existing Attachment auto-added. Y null Inst. to set 45' class 1 pole (JO) / Abdn. 40' class 4 pole.Cut and kick for riser.Inst. 10" DE PISA at a lead of 16'.Inst. 18M ins. anc. guy at 46", attach to the 16' lead DE anc.Attach Sec./Sec. tap at 109".Inst. Arrester.Replace Svc. Riser for new pole height.Transfer cutout and street light. Existing Attachment auto-added. Y Existing Attachment auto-added. Y raise SL 8" Y raise secondary 33" existing clearance between secondary and comms is 42" - no existing clearance violation shift needed to accommodate new attachment Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365510 1365510 1365202 1558086 1617934 $22,900.00 $22,900.00 $22,775.00 $22,775.00 $22,650.00 $150.00 $150.00 $150.00 $150.00 $150.00 $24,625.00 $24,625.00 $23,375.00 $23,375.00 $22,750.00 $376,659.22 $376,659.22 $12,785.28 $29,389.23 $879.53 Awaiting MR Payment Awaiting MR Payment Survey Overdue Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC 1/3/2023 1/3/2023 1/3/2023 9/29/2023 2/6/2024 1/26/2023 1/26/2023 1/26/2023 10/5/2023 2/22/2024 1381641 1381641 1381628 1596013 1655652 Complete Complete Complete Complete Complete 4294940 4863416 4288350 4673948 383 384 382 312 1607629 $22,275.00 $150.00 $23,875.00 $2,527.57 Awaiting MR Payment NetSpeed LLC 11/16/2023 11/21/2023 1619475 Complete 4546838 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1621882 $22,275.00 $150.00 $23,500.00 $224.40 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655811 Complete CONNECTICUT LIGHT&POWER Make-Ready Attachments 1621882 $22,275.00 $150.00 $23,500.00 $224.40 Awaiting MR Payment NetSpeed LLC 2/6/2024 2/22/2024 1655811 Complete CONNECTICUT LIGHT&POWER Make-Ready Attachments 1563402 $22,150.00 $150.00 $22,375.00 $199,215.25 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604448 Complete MAKE-READY Street Light Bracket null null null COOK AVE CONNECTICUT LIGHT&POWER Make-Ready Attachments Complete 41.76304626 -72.59980011 398 217 1604448 FRONTIER 4463176 216 4655268 10/25/2023 East Hartford COOK AVE 4650571 Complete 10/18/2023 null 399 Complete 1596002 NetSpeed LLC REPLACE 4461649 1596002 10/5/2023 Awaiting MR Payment null Cromwell 10/5/2023 9/29/2023 $199,215.25 null KOWAL DR 9/29/2023 NetSpeed LLC 4291564 4294433 2412 1587 DANA DR WARD PL REPLACE 41.27752686 -72.51690674 1178 NetSpeed LLC Awaiting MR Payment null CONNECTICUT LIGHT&POWER FRONTIER/CONNECTICUT LIGHT&POWER Awaiting MR Payment $985.55 null REPLACE FRONTIER/CONNECTICUT LIGHT&POWER East Hartford $985.55 $21,750.00 -72.4703598 null CONNECTICUT LIGHT&POWER/FRONTIER East Hartford $21,750.00 $150.00 41.27766037 null Clinton FOREST ST $150.00 $22,275.00 CAMP ST 41.27798843 -72.47042084 Inst. 45' class 1 pole (JO) / Abdn. 35' class 4 pole.Cut and kick for riser.Inst. 10" bisector PISA at a lead of 22'.Inst. 18M ins. anc. guy at 5", attach to the 22' lead bisector anc.Attach Sec. at 109".Repl. Svc. Riser for new pole height.Transfer street light. FOREST ST $22,275.00 $22,375.00 CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 1558085 $150.00 FORBES ST CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER FRONTIER/CONNECTICUT LIGHT&POWER 1558085 $22,150.00 LIBERTY ST Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER 84387 Non CONNECTICUT LIGHT&POWER New or Replace Poles 1563402 HAMMOCK RD N Westbrook Meriden 4457217 Non CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles HAMMOCK RD N 41.5209465 -72.82840729 MAKE-READY Shift Raise null null FRONTIER 41.7493248 -72.6039505 TRANSFER Transfer To New Pole REPLACE null FRONTIER 41.74945831 -72.60350037 null null REPLACE null null FTR TO REPLACE POLE WITH 45-1 DUE TO 5' RULE TRANSFER EXISITNG POWER FTR TO REPLACE POLE WITH 45-1 DUE TO 5' RULE TRANSFER EXISITNG POWER FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.61840057 -72.65550995 MAKE-READY Transfer To New Pole null null Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53302546 -72.80808806 MAKE-READY Street Light Bracket null Meriden CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.53283691 -72.80810547 MAKE-READY Street Light Bracket null Old Saybrook Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER FRONTIER 41.28276062 -72.36032104 41.28478622 -72.35594177 null MAKE-READY null Other REPLACE null FTR replace pole 40/1 Y Existing Attachment auto-added. Y null FTR replace pole 40/2 Y null null raise sl 6" Y null null replace pole top with large corner raise sl 12" Y null Remove: 35/4Install: 40/2Replace due to new attachment & driveway clearance; Attach secondary 82" from pole top; Transfer 25C KVA XFMR; Fuse XFMR Existing Attachment auto-added. Y FTR TO REPLACE EXISITNG ANCHOR WITH 1" TER AT B=355 L=12' Due to new attachment causing loading issues, replace down guy with 14M to new FTR-set 1"TT anchor LL=15' , P=DE Y null CONNECTICUT LIGHT&POWER New or Replace Poles 1563402 $22,150.00 $150.00 $22,375.00 $199,215.25 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604448 Complete 4863908 1211 COVE ST Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28223038 -72.35393524 null null REPLACE null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1563402 $22,150.00 $150.00 $22,375.00 $199,215.25 Awaiting MR Payment NetSpeed LLC 10/18/2023 10/25/2023 1604448 Complete 4291718 1690 SHEFFIELD COVE RD Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28104019 -72.35778046 MAKE-READY Other null null Remove: 30/5Install: 35/2Replace due to new attachment and increased loading; Attach secondary 18" from pole top; Replace 18M span guy to P.344; Replace down guy with 18M to new ES set 1"TT anchor LL=8' , P=DE Existing Attachment auto-added. FTR TO REPLACE EXISITNG ANHOR WITH 1" TER L=18', B=227. FTR TREE Due to new attachment & increased TRIMMING REQUIRED (NONloading, replace down guy with 14M to new BILLABLE) FTR-set 1"TT anchor LL=9' , P=DE null Remove: 40/4Install: 45/1Replace due to clearances; Attach secondary 136" from pole top; Replace (1) 30K fuse; Replace primary span guy with 18M to P.1527; Install streetlight conduit Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments 1563402 1365493 1365493 1365493 1365493 1597494 1597494 1597494 $22,150.00 $22,025.00 $22,025.00 $22,025.00 $22,025.00 $21,900.00 $21,900.00 $21,900.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $22,375.00 $22,625.00 $22,625.00 $22,625.00 $22,625.00 $23,000.00 $23,000.00 $23,000.00 $199,215.25 $77,496.39 $77,496.39 $77,496.39 $77,496.39 $22,574.44 $22,574.44 $22,574.44 Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC 10/18/2023 1/4/2023 1/4/2023 1/4/2023 1/4/2023 11/15/2023 11/15/2023 11/15/2023 10/25/2023 1/26/2023 1/26/2023 1/26/2023 1/26/2023 11/21/2023 11/21/2023 11/21/2023 1604448 1381634 1381634 1381634 1381634 1619414 1619414 1619414 Complete Complete Complete Complete Complete Complete Complete Complete 4864191 4280165 4297474 4287380 4296755 4702445 4702446 4920802 1858 294 279 274 286 6149 6152 6157 MAIN ST HAMMOCK RD CENTER RD SOUTH PKWY HAMMOCK RD MIDDLE TPKE E COOK ST MIDDLE TPKE E Old Saybrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28507233 -72.37480927 null null REPLACE Y Y Clinton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.25829638 -72.51828039 null null REPLACE null Inst. 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Cut and kick for riser.Inst. 10" DE PISA with a lead of 12'.Inst. 18M ins. anc. guy at 22", attach to the 12' lead DE anc.Attach Sec. at 82".Repl (2) Svc. Riser for new pole height.Transfer street light. Clinton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.26212692 -72.51641083 MAKE-READY Other null null null Clean up drooping Sec. cables. Y Clinton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.26233292 -72.51464081 MAKE-READY Other null null null Clean up drooping Sec. cables. Y Clinton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.25893402 -72.51354218 Existing Attachment auto-added. Y Manchester CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.78488541 Manchester CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Manchester CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER -72.4980011 41.78494644 -72.49752045 41.78517914 -72.49499512 null null REPLACE null Inst. 45' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Sec./Neut. At 109". MAKE-READY Street Light Bracket null null null raise SL 10" Y null raise secondary 6" raise aerial cable 11" lower sl 2" Y null raise secondary 19" and dress loop raise sl 6" Y MAKE-READY MAKE-READY Shift Raise Shift Raise null null null null
  9. Page 9 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 9 of 39 Category ConversationID CONNECTICUT LIGHT&POWER Make-Ready Attachments 1597601 Frontier Application Fees $21,900.00 CL&P Application Fees $150.00 CL&P Survery Fees $25,000.00 Make-Ready Estimate Amount $112.19 True-Up Cost ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo StreetAddress Town OwnerName Custodian Latitude Longitude AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619420 Complete 4700799 6123 MIDDLE TPKE E Manchester CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.78419495 -72.5072937 MAKE-READY Street Light Bracket null FRONTIER Non CONNECTICUT LIGHT&POWER New or Replace Poles 1607699 $21,775.00 $150.00 $24,625.00 $15,555.73 Awaiting MR Payment NetSpeed LLC 11/16/2023 11/21/2023 1619479 Complete 4544450 1034 SHUNPIKE RD Cromwell FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1600791 $21,400.00 $150.00 $22,500.00 $3,513.91 Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619444 Complete 4698755 7483 NEW STATE RD Manchester CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments 1600791 1366793 1388989 $21,400.00 $21,275.00 $21,150.00 $150.00 $150.00 $150.00 $22,500.00 $21,500.00 $21,625.00 $3,513.91 $560.09 $485.17 Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC 11/15/2023 3/10/2023 5/10/2023 11/21/2023 3/22/2023 5/17/2023 1619444 1404369 1436037 Complete Complete Complete 4698282 4354613 4905610 3337 C3360 842 HILLIARD ST GREAT HILL RD ALLEN ST PoleComment PowerSurveyAttachmentComment Billable null null raise SL 28" Y FTR replace pole 45/2 Y -72.6756134 TRANSFER Transfer To New Pole REPLACE null FTR TO REPLACE POLE WITH 45-1 PER EL REQUEST CONNECTICUT LIGHT&POWER 41.78217697 -72.55683899 MAKE-READY Shift Raise null null null raise secondary, terminator and riser by 17" Y Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.78605652 -72.54877472 MAKE-READY Shift Raise null null null raise secondary 10" Y Seymour FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.35620117 -73.11082459 MAKE-READY Shift Raise null null null raise secondary 10" Y Plymouth FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER MAKE-READY Shift Raise null null null raise secondary 28" Y CONNECTICUT LIGHT&POWER 41.77168274 -72.53846741 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y FRONTIER 41.29065704 -72.52707672 MAKE-READY Other null null LOWER COMM DROP FROM 15' TO 14'8" Extend Svc. Riser up to Sec. level. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1600943 $21,150.00 $150.00 $23,000.00 $33,903.43 Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619452 Complete 4683891 4350 W CENTER ST Manchester CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365138 $20,650.00 $150.00 $21,125.00 $8,103.52 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381615 Complete 4303445 308-S GLENWOOD RD Clinton FRONTIER/CONNECTICUT LIGHT&POWER 41.61530685 41.67556 -73.00184631 CONNECTICUT LIGHT&POWER New or Replace Poles 1365138 $20,650.00 $150.00 $21,125.00 $8,103.52 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381615 Complete 4314725 1071 GLENWOOD RD Clinton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.29272079 -72.52511597 null null REPLACE null Inst. 35' class 2 pole (JO) / Abdn. 25' class 4 pole.Cut and kick for riser.Attach Sec. at 52".Customer to transfer/replace Svc. riser/meter. Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365138 $20,650.00 $150.00 $21,125.00 $8,103.52 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381615 Complete 4304840 319A GLENWOOD RD Clinton FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.29314804 -72.52500916 MAKE-READY Other null null LOWER COMM DROPS FROM 18'8" TO 18' & FROM 18' TO 17'8" Clean up drooping Sec. cables. Y FRONTIER 41.29132843 -72.52411652 MAKE-READY Other null null null Clean up drooping Sec. cables. Y CONNECTICUT LIGHT&POWER 41.29963684 -72.51829529 MAKE-READY Other null null null Extend Svc. Riser up to Sec. level. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365138 $20,650.00 $150.00 $21,125.00 $8,103.52 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381615 Complete 4298746 503 LIBERTY ST Clinton FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365138 $20,650.00 $150.00 $21,125.00 $8,103.52 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381615 Complete 4306450 1419 FAIRY DELL RD Clinton CONNECTICUT LIGHT&POWER/FRONTIER null null REPLACE null Remove: 40/4Install 45/1Replace due to comms request; Attach secondary 109" from pole top 41.77817154 -72.51113892 MAKE-READY Shift Raise null null null raise secondary 4" Y 41.28068161 -72.52625275 MAKE-READY Shift Raise null null null raise secondary 20" Y null ES to set 35' class 2 pole (JO) / Abandon 30' class 4 pole.Attach Sec. DE at 52". Existing Attachment auto-added. Y null ES to set 35' class 2 pole (JO) / Abandon 30' class 4 pole.Attach Sec. bracket & service at 52".Inst. cutouts and zap shields.Transfer xfrmr. Existing Attachment auto-added. Y Existing Attachment auto-added. Y Y CONNECTICUT LIGHT&POWER New or Replace Poles 1363201 $20,025.00 $150.00 $20,875.00 $8,938.51 Awaiting MR Payment NetSpeed LLC 5/11/2023 5/22/2023 1437828 Complete 4698762 6 MAIN ST East Hartford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.7819519 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1597806 $19,900.00 $150.00 $24,750.00 $668.29 Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619428 Complete 4680124 2724 LENOX ST Manchester CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Clinton FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1365900 1365496 1365496 $19,150.00 $19,150.00 $19,150.00 $150.00 $150.00 $150.00 $20,750.00 $21,125.00 $21,125.00 $21,261.91 $208,319.57 $208,319.57 Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC NetSpeed LLC 1/3/2023 1/3/2023 1/3/2023 1/26/2023 1/26/2023 1/26/2023 1381681 1381638 1381638 Complete Complete Complete 4294168 4290805 4301638 1589 334 333 HIGH ST BEACH ROAD EXT BEACH ROAD EXT Clinton Clinton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER -72.63491058 41.27154541 -72.49274445 41.2719574 -72.49285889 null null null null REPLACE REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1365496 $19,150.00 $150.00 $21,125.00 $208,319.57 Awaiting MR Payment NetSpeed LLC 1/3/2023 1/26/2023 1381638 Complete 4292177 350 WALNUT ST Clinton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.27370834 -72.49492645 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1866286 $19,150.00 $150.00 $19,375.00 $5,331.85 Awaiting MR Payment NetSpeed LLC 6/16/2025 7/1/2025 1885757 Complete 4637042 9068 SOUTH RD Farmington CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.72242737 -72.78607941 null null REPLACE null ES to set 40' class 2 pole (JO) / Abandon 30' class 4 pole.Inst. (1) anc. at a lead of 10' for DE.Attach Sec. DE at 82", adjust midspan services.Inst. (1) 14M non-ins. anc. guy at 82, attach to 10' lead DE anc.. ES replace pole 35/2 due to insufficient space on pole for new commno existing NESC violation present. taller pole needed for additional comm Farmington CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.71969604 -72.78132629 MAKE-READY Street Light Bracket null null null Existing Attachment auto-added. raise SL 4" no existing NESC violation. comms need to shift up to fit new comm which in turn creates a need for SL need to be raised Glastonbury CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.72474289 MAKE-READY Shift Raise null null null raise secondary 29" and sl 22" Y CONNECTICUT LIGHT&POWER 41.76809692 -72.59224701 CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments 1866286 1462108 $19,150.00 $18,900.00 $150.00 $150.00 $19,375.00 $20,625.00 $5,331.85 $756.46 Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC 6/16/2025 7/10/2023 7/1/2025 7/31/2023 1885757 1477261 Complete Complete 4624274 4640753 6077 1926 ROBIN RD GRISWOLD ST CONNECTICUT LIGHT&POWER New or Replace Poles 1558083 $18,650.00 $150.00 $19,750.00 $2,817.75 Awaiting MR Payment NetSpeed LLC 9/29/2023 10/5/2023 1595998 Complete 4695865 1394 SUNSET RIDGE DR East Hartford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1597084 $18,650.00 $150.00 $23,750.00 $543.45 Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619408 Complete 4714087 4441 CUSHMAN DR Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1597084 $18,650.00 $150.00 $23,750.00 $543.45 Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619408 Complete 4923229 6512 KENNEDY RD Manchester CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Make-Ready Attachments 1597084 $18,650.00 $150.00 $23,750.00 $543.45 Awaiting MR Payment NetSpeed LLC 11/15/2023 11/21/2023 1619408 Complete 4922565 4449 CUSHMAN DR Manchester Manchester CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles 1597084 1365678 $18,650.00 $18,525.00 $150.00 $150.00 $23,750.00 $20,725.00 $543.45 $138,034.76 Awaiting MR Payment Awaiting MR Payment NetSpeed LLC NetSpeed LLC 11/15/2023 1/6/2023 11/21/2023 1/26/2023 1619408 1381653 Complete Complete 4699027 4293170 4381 434 PARKER ST BOSTON POST RD -72.5982666 Y null null REPLACE null ES replace pole 40/2 Existing Attachment auto-added. Y -72.5062027 MAKE-READY Street Light Bracket null null FTR TO PLACE 1" TER AT B=297 L=18' FTR TO ADD 10M DG AT 21'4" raise SL 12" Y CONNECTICUT LIGHT&POWER 41.80211639 -72.49834442 MAKE-READY Street Light Bracket null null null raise SL 12" Y FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79718781 -72.50211334 MAKE-READY Street Light Bracket null null null raise SL 12" Y FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79549408 MAKE-READY Shift Raise null null null raise secondary 12" Y Set 50' class 1 pole (Sole) / Rmv. 45' class 2 pole.Inst. 10" DE PISA at a lead of 21'.Inst. 18M ins. Anc. Guy at 190", attach to 21' L DE anc.Attach bottom circuit at 100".Attach 1PH tap at 130".Attach Sec./Neut. Tap at 190".Replace (4) arresters.Transfer cutout and street. light. Existing Attachment auto-added. Y 41.79673767 -72.5068512 Westbrook CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.2824173 -72.43946075 null null REPLACE null CONNECTICUT LIGHT&POWER 41.28356171 -72.4433136 MAKE-READY Shift Raise null null CONNECTICUT LIGHT&POWER 41.28328705 -72.44185638 null null REPLACE null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365678 $18,525.00 $150.00 $20,725.00 $138,034.76 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381653 Complete 4296360 444 BOSTON POST RD Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER New or Replace Poles 1365678 $18,525.00 $150.00 $20,725.00 $138,034.76 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381653 Complete 4293104 440 BOSTON POST RD Westbrook CONNECTICUT LIGHT&POWER null Set 50' class 1 pole (Sole) / Rmv. 45' class 2 pole.Attach bottom circuit at 100".Attach 1PH tap at 130".Attach Sec./Sec. taps/Neut. Tap at 190".Replace arrester and cutout.Transfer flood light. Raise Neut./Neut. Tap 24". Y Existing Attachment auto-added. Y Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365678 $18,525.00 $150.00 $20,725.00 $138,034.76 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381653 Complete 4308582 439 BOSTON POST RD Westbrook CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.28321457 -72.44146729 MAKE-READY Shift Raise null null null Raise Sec./Neut. 10". Pull slack in Sec. to pole 440. Extend Sec. riser up to Sec. level. Inst. Zap shields.Raise Sec./Neut. 10". Pull slack in Sec. to pole 440. Extend Sec. riser up to Sec. level. Inst. Zap shields. CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365678 $18,525.00 $150.00 $20,725.00 $138,034.76 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381653 Complete 4290013 436 BOSTON POST RD Westbrook CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.28273392 -72.43999481 MAKE-READY Shift Raise null null null Raise Sec./Neut. 20". Raise street and flood lights 10". Inst. Zap shield. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1365678 $18,525.00 $150.00 $20,725.00 $138,034.76 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381653 Complete 4293066 437 BOSTON POST RD Westbrook CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.28292465 -72.44036102 MAKE-READY Shift Raise null null null Raise Sec./Neut. 13". Inst. Zap shield. Y
  10. Page 10 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 10 of 39 Category ConversationID Frontier Application Fees CL&P Application Fees CL&P Survery Fees Make-Ready Estimate Amount True-Up Cost ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo StreetAddress Town OwnerName Custodian Latitude Longitude AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1365678 $18,525.00 $150.00 $20,725.00 $138,034.76 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381653 Complete 4294192 79 CARTA LN Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28087235 -72.44461823 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1365678 $18,525.00 $150.00 $20,725.00 $138,034.76 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381653 Complete 4294223 79 CARTA LN Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28124237 -72.44441223 null null REPLACE null Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Inst. 10" DE PISA at a lead of 5'.Inst. 18M non-ins. anc. guy at 52", attach to the 5' lead DE anc.Inst. 14M ins. span guy at 40", run to pole 209 (attach opposite of Pri. DE at pole 102).Attach Sec. at 52". Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Cut and kick for riser.Inst. 10" DE PISA at a lead of 11'.Inst. 14M non-ins. anc. guy at 52", attach to the 11' lead DE anc.Attach Sec. at 52".Replace Sec. riser for new pole height. Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1365552 $18,500.00 $150.00 $17,850.00 $44,330.10 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381610 Complete 4303435 1185 ESSEX RD Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.29033661 -72.44655609 null null REPLACE null Inst 40' class 2 pole (JO) / Abdn 35' class 4 pole.Pole in grass.Attach Sec. at 82".Inst. 16'L 10" PISA DE anchor at 352 degrees.Inst 18M ins. anc. guy at 82", attach to 16'L DE anc.Transfer street light. CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4644768 5047 GLENN RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74264526 -72.62583923 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4644765 5048 GLENN RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74262238 -72.6262207 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4656730 4647 GLENN RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74227524 -72.62580872 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4671053 4590 GLENN RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74300003 -72.62591553 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y FRONTIER 41.74020004 -72.62480927 MAKE-READY Shift Raise null null null raise secondary 4" and dress loop Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4637495 3008 HOLLISTER DR East Hartford FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4641426 4793 JEFFERSON LN East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.73959732 -72.62229156 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4647263 4650 GRAHAM RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74136734 -72.62652588 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4651545 4794 JEFFERSON LN East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.73976898 -72.62259674 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4654806 4753 LEICHTNER DR East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74230576 -72.62446594 MAKE-READY Street Light Bracket null null null raise SL 6" Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4642119 4788 JEFFERSON LN East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74007034 -72.62044525 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4914548 4709 GRAHAM RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74199295 -72.62398529 null null REPLACE null ES replace pole 45/1 Meriden FRONTIER 41.56778336 -72.77277374 MAKE-READY Shift Raise null null null Existing Attachment auto-added. raise secondary 6" existing clearances are met. shifting needed to make space for new comm Y FRONTIER/CONNECTICUT LIGHT&POWER Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79606628 -72.54679871 MAKE-READY Street Light Bracket null null null raise streetlight 17" Y Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79993439 MAKE-READY Street Light Bracket null null null raise streetlight 4" Y Bethel CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER ES TO RAISE SEC & SL 18" raise secondary and streetlight 18" no existing clearance violation. shift up needed to allow new comm Y Bethel CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null DOUBLE POLE raise secondary and streetlight 10" no existing clearance violation. shift up needed to allow for new comms transfer Y Bethel CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null DOUBLE POLE - ES TO RAISE SEC TO 25'9 raise secondary 12" no existing clearance violation. shift up need to allow transfer of new comm Y null ES replace pole 50/1 5E due to insufficient space on poleno existing clearance violation and cannot shift up. taller pole needed for new comm Existing Attachment auto-added. Y null null raise sl 4" existing clearance between comms and sl is met. sl needs to be shifted up to make room for new comm Y null ES replace pole 45/2 due to comm spaceno nesc clearance issue. extra space needed in comm space Existing Attachment auto-added. Y null Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Neut. at 82".Replace ¼ mile arresters.Note: Pole replaced at phones request, due to comms clearances in midspan with new attachment. Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1648704 1599574 1599574 1651769 1651769 1651769 1651769 1926597 1840700 1676739 1676739 $15,900.00 $14,900.00 $14,900.00 $14,525.00 $14,525.00 $14,525.00 $14,525.00 $13,525.00 $13,025.00 $12,900.00 $12,900.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $16,000.00 $16,250.00 $16,250.00 $15,625.00 $15,625.00 $15,625.00 $15,625.00 $15,500.00 $14,500.00 $14,250.00 $14,250.00 $10,515.03 Awaiting MR Payment $922.55 Awaiting MR Payment $922.55 Awaiting MR Payment $44,247.19 Awaiting MR Payment Awaiting MR Payment $44,247.19 $44,247.19 Awaiting MR Payment $44,247.19 Awaiting MR Payment $524.67 Awaiting MR Payment $11,525.68 $10,048.08 $10,048.08 Awaiting MR Payment $9,618.11 $9,618.11 Make-Ready Overdue Make-Ready Overdue NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC GrecoWolf Engineering GrecoWolf Engineering 2/8/2024 11/15/2023 11/15/2023 9/6/2024 9/6/2024 9/6/2024 9/6/2024 10/15/2025 3/31/2025 4/29/2024 4/29/2024 2/22/2024 11/21/2023 11/21/2023 9/18/2024 9/18/2024 9/18/2024 9/18/2024 10/22/2025 4/9/2025 8/7/2024 8/7/2024 1655949 1619436 1619436 1746452 1746452 1746452 1746452 1939913 1845351 1730508 1730508 Complete Complete Complete Complete Complete Complete Complete Complete Complete Complete Complete 4492926 4711323 4922939 4363655 4353103 4872065 4351282 4678534 4504808 4782290 4768351 3142 3988 4865 28 22 23 34 2809 1503 162 5325 WILBUR CROSS PKWY TOLLAND TPKE TOLLAND TPKE GRASSY PLAIN ST GRASSY PLAIN ST GRASSY PLAIN ST GRASSY PLAIN ST LOCUST ST NEWFIELD ST BLUE HILLS AVE BLUE HILLS AVE Bethel Manchester Middletown Bloomfield CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER -72.5376358 41.36901093 -73.42191315 41.37079436 -73.42301888 41.37049866 -73.42282867 41.36671448 -73.4211731 41.77130508 -72.52272797 41.56715012 -72.67093658 41.86536789 -72.71788025 Bloomfield CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.87399673 -72.72805786 CONNECTICUT LIGHT&POWER MAKE-READY MAKE-READY MAKE-READY null MAKE-READY null null null REPLACE null Existing Attachment auto-added. Y null null null raise secondary 27" Y Shift Raise null null null raise secondary 26" Y null ES inst. 50' class 1 (T5) / Abdn 45' class 3.Pole behind sidewalk.Attach Sec. at 109".Inst. zap shields.Transfer cutouts, xfrmr bank & streetlight.Note: Pole replaced at phones request due to midspan clearance with new attachment. Existing Attachment auto-added. Y $12,576.81 Awaiting MR Payment NetSpeed LLC 10/15/2025 10/22/2025 1939903 Complete 4919000 1603 CHESTNUT ST Manchester 41.77263641 -72.52558899 $12,125.00 $874.66 Awaiting MR Payment NetSpeed LLC 3/15/2024 3/20/2024 1666649 Complete 4490603 2484 LAWN AVE Middletown FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.55244827 -72.65666962 Middletown FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.55395126 -72.65433502 MAKE-READY CONNECTICUT LIGHT&POWER New or Replace Poles 1608450 $11,150.00 $150.00 $11,000.00 $80,213.04 Awaiting MR Payment NetSpeed LLC Precision Valley Communications 3/15/2024 11/8/2023 3/20/2024 11/27/2023 1666649 1620806 Complete Complete 4482408 4247437 2138 20217 HIGH ST NORTH AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12156296 -73.40945435 REPLACE Shift Raise $13,625.00 $150.00 Awaiting MR Payment null REPLACE null $150.00 $11,525.00 $874.66 null null MAKE-READY $12,150.00 1632829 $12,125.00 Street Light Bracket REPLACE null 1925696 $150.00 null null REPLACE CONNECTICUT LIGHT&POWER Make-Ready Attachments $11,525.00 Shift Raise null null null null CONNECTICUT LIGHT&POWER/FRONTIER 1632829 Shift Raise null ES set 45' class 2 pole (JO) / Abdn. 40' class 4 pole.Cut & kick pole for Comms. riser.Attach Neut. at 109".Note: Pole replaced at phones request, due to comms clearances in midspan with new attachment. ES replace pole 40/2 due to insufficient spaceno existing NESC clearance issues. more space is needed to fit new comm CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments Shift Raise Y null null REPLACE

Text of NECTA-057 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of NECTA-060_Final.pdf

Extracted from the file · 1 page · 1,114 characters

Text of NECTA-060 Attachment 1.pdf

Extracted from the file · 15 pages · 67,516 characters

As listed on the current system

Question(s) Answered 45, 54, 57, 60 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026