Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 45, 54, 57, 60

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

Text of NECTA-057 Attachment 1.pdf

Extracted from the file · 39 pages · 452,743 characters

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 1 of 80

    [Sheet: Billable] Category | ConversationID | Frontier Application Fees | CL&P Application Fees | CL&P Survery Fees | Make-Ready Estimate Amount | True-Up Cost | ConversationCurrentStatus | PermittingCompany | ApplicationSubmitted | SurveyStart | PowerSurvey | PowerSurveyStatus | PoleID | PoleNo | StreetAddress | Town | OwnerName | Custodian | Latitude | Longitude | AttachmentWorkType | AttachmentMRAction | PoleWorkType | PoleWorkReason | PoleComment | PowerSurveyAttachmentComment | Billable CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | BASLEY RD | Plainfield | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 40' class 2 pole (JO) / Abdn 35' class 4 pole (C-Truss).Inst. (1) anc. at a lead of 17' for stub/Sec. DE.Attach Sec. DE at 82".Inst. (1) 14M span guy at 70", run to pole 2263 (ins. at pole 2263).Inst. (1) 14M non-ins. anc. guy at 70", attach to new DE anc. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | WESTCOTT RD | Killingly | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 45' class 2 pole (JO) / Abdn 35' class 4 pole.Inst. 14M ins. Stub guy at 22", run to pole 1873.Attach Sec. at 109".Transfer Xfrmr. | Existing Attachment auto-added. | Y Non CONNECTICUT LIGHT&POWER New or Replace Poles | Attachment Overdue | New Cingular Wireless PCS | Complete | BYRAM RD | Greenwich | VERIZON NEW YORK/CONNECTICUT LIGHT&POWER | VERIZON NEW YORK | TRANSFER | Transfer To New Pole | REPLACE | null | null | FTR to set 45' class 2 pole (JO) / Rmv 40' class 3 pole. Attach Sec. DE at 109". Inst. (1) 14M ins. span guy at 97", run to pole 70807 (ins. at pole 90807). Inst. (1) 18M ins. anc. guy at 109", attach to DE anc. (VZ Set). Transfer street light. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | MIDDLE ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | REQUESTING ES TO CUT & KICK AND REPLACE POLE WITH 55'-1 DUE TO CAMM MED SPAN CLEARENCE TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | CIRCLE DR | Farmington | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | ES Replace 3/4"ST Anchor with 1"TT L-12' - Due to COMM Guying Required and Due to Additional Load with New Attachment | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | PLAINVILLE AVE | Farmington | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 45'2. TRANSFER EXISTING POWER. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | MIDDLE ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | 9278 (978). ES TO REPLACE POLE WITH 55/1 TRANSFER EXISITNG POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | MIDDLE ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 55/1 TRANSFER EXISITNG POWER | Existing Attachment auto-added. | Y
  2. Part 2 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | MIDDLE ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Pole ownership to become E5; Raise Secondary 16"; Raise Streetlight 36" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | MIDDLE ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 50/1 TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | MIDDLE ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | REQUESTING ES TO REPLACE POLE WITH 50/1 DUE TO COMM CLEARENCE TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | MIDDLE ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | REQUESTING ES TO REPLACE POLE WITH 55-1 DUE TO COMM MED SPAN CLEARENCE TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | MIDDLE ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 55/1 TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | MIDDLE ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | 6279 (629). REQUESTING ES TO REPLACE POLE WITH 45/1 DUE TO COMM CLEARENCE TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | G6609 | CHASE PKWY | Waterbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise Neutral 6" due to clearance; Extend Secondary riser 14" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HIGHLAND AVE | Waterbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise Secondary 31" due to clearance; Raise Streetlight 18" ES/FTR split to update from 45/35 to 45/40 | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | F1493 | HIGHLAND AVE | Waterbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | DOUBLE POLE | Raise Secondary 26" due to clearance; Replace span guy backing Secondary with 14M to P.24428 | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CHASE PKWY | Waterbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise Secondary 12" and place on extension bracket, due to clearances | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CHASE PKWY | Waterbury | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise Secondary 18" due to clearance | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CHAMBERS ST | Waterbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise secondary 18"; services exist mid-span in field | Y
  3. Part 3 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | ACRA RD | Waterbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Re-sag Neutral to P.29381 due to clearance | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | F9995 | COMO AVE | Waterbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Abandon: 35/4Install: 40/2Replace due to clearance; Attach Secondary 82" from pole top; Shift (1) service mid-span; Transfer 50KVA XFMR; XFMR is fused; Zap shield exists | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | INDUSTRIAL PARK RD | Putnam | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 45' class 2 pole (JO) / Abdn 35' class 4 pole.Cut and kick pole for risers.Inst. (1) anc. at a lead of 13' for 3PH DE.Inst. (1) anc. at a lead of 19' for service DE.Attach 1/0 QPX at 107", attach 4/0 QPX service at 109".Inst. (1) 18M ins. anc. guy at 15", attach to the 13' lead DE anc.Inst. (1) 18M non-ins. anc. guy at 109", attach to 19' lead DE anc.Inst. cutouts.Extend service riser for new pole height.Transfer Xfmr bank. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | S SHORE RD | Killingly | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 35' class 2 pole (JO) / Abdn 30' class 4 pole.Inst. 10" PISA at a lead of 13' for DE OWS.Inst. 18M non-ins. anc guy at 38", attach to 13'L DE anc. Transfer 3 spool rack, so bottom of bracket is at 46". | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | 27444-S | EASTERN AVE | Waterbury | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 35/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | AUBURN ST | Putnam | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 40c2 pole (JO) / Abdn. 30'Inst. (1) anc. at a lead of 14' for DE.Attach Sec. DE at 82".Inst. (1) 14M ins. anc. guy at 22", attach to the 14' lead DE.Inst. cutout & zap shield.Transfer xfrmr. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | G4406 | MIDWOOD AVE | Waterbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | CRESCENT RD | Glastonbury | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 35/2 | Existing Attachment auto-added. | Y Non CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | NEW LONDON TPKE | Glastonbury | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | null | Transfer To New Pole | REPLACE | null | FTR TO REPLACE POLE WITH 50/1 TRANSFER EXISTING POWER | FTR replace pole 50/1 | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | HILLCREST DR | Glastonbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 35/2 | Existing Attachment auto-added. | Y
  4. Part 4 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | CART RD | Glastonbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | HOWE RD | Griswold | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 35/2 TRANSFER EXISTING POWER TRANSFER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | TERRACE DR | Plainfield | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | EVS TO REPLACE POLE WITH 40/2 CUT & KICK | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | TERRACE DR | Plainfield | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | EVS TO REPLACE POLE WITH 40/2 CUT & KICK | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | TOLLAND ST | East Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 40'Install: 45/1Transfer: 25KVA OH XFMR BankReplace due to on pole clearances; attach secondary 136" from pole top; replace 14M secondary down guy to existing 1" TT anchor, LL=16', P=DE | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | HUDSON ST | East Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 35'Install: 40/1Transfer: 50KVA OH XFMRReplace due to on pole clearances; attach secondary 82" from pole top and place on extension bracket; replace 14M secondary span guy to P.2607-S; shift one (1) service mid-span | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | MCIMETRO ACCESS TRANSMISSION SYSTEMS | Complete | GREAT HILL RD | East Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 40'Install: 50/1Replace due to on pole clearances; attach secondary 163" from pole top; replace (2) 18M primary down guys to new ES set 1" TT anchors, LL1=20', P1=DE, LL2=20', P2=DE | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | null | Complete | FARMINGTON AVE | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 50/2 DUE TO MIDSPAN CLEARANCE ISSUES TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Inspection | CABLEVISION OF LITCHFIELD, INC | Complete | BUTTERNUT HOLLOW RD | Greenwich | CONNECTICUT LIGHT&POWER/VERIZON NEW YORK | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | (Billable) Raise DDE Neut.s 6". (Non-Billable) Inst. (2) 18M ins. anc. guy at their existing heights, replacing existing guys, attach each to their respective existing DE anc. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Siena Engineering Group | Complete | SOUND BEACH AVE EXT | Greenwich | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Transfer To New Pole | null | null | Inst 50' class 1 pole (JO) / Abdn 45' class 2 pole.Attach Sec./Neut. at 136".Replace cutout. | Inst 50' class 1 pole (JO) / Abdn 45' class 2 pole. Maintain slack span of cables to pole 84112. Attach Sec./Neut. at 136". Transfer cutout. | Y
  5. Part 5 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Siena Engineering Group | Complete | STUART DR | Greenwich | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 45' class 2 pole (JO) / Abdn 40' class 3 pole.Inst. 11'L bisector PISA.Inst. 18M ins. anc. guy at 22", attach to 11'L bisector anc.Attach Sec./Neut. at 109".Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready | CROWN CASTLE | Complete | FARMINGTON AVE | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES REPLACE POLE W/A 50-1 DUE TO COMM. CLEARANCE/ TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready | CROWN CASTLE | Complete | FARMINGTON AVE | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | REPLACE POLE W/A 50-1 (ES + 5') TRANSFER EXISTING POWER. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready | CROWN CASTLE | Complete | FARMINGTON AVE | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE W/A 50-1 (ES + 5') DUE TO COMM. CLEARANCE ISSUES. TRANSFER EXISTING POWER. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CORBIN AVE | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise street light 18" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | ROUTE 9 | Berlin | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | UI TO REPLACE POLE WITH 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | SUNRISE AVE | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 4" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CARLSON ST | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 10" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | EAST ST | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | MINIMUM HEIGHT REQUIREMENT FOR LOWEST POWER IS 31'8"IF NOT POLE REPLACEMENT IS UNAVOIDABLE | raise secondary 53" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | QUEEN ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 11" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SKIPPER ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | 4193-S | LURTON ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 35/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | FARMINGTON AVE | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 20" | Y
  6. Part 6 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | FARMINGTON AVE | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 18" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | FARMINGTON AVE | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 36" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | OSGOOD AVE | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | GREENWOOD ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | WALLACE ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | GREENWOOD ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | GLEN ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 26" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | BROOK ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 16" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | BASSETT ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | CHARLENE DR | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HART ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 4" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | GARDEN ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | 55882-S | GARDEN ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | LIBERTY ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 | Existing Attachment auto-added. | Y
  7. Part 7 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HART ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 6" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | WOODBINE ST | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 6" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Survey Overdue | NetSpeed LLC | Complete | EAST ST | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 18" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Survey Overdue | NetSpeed LLC | Complete | JOHN DOWNEY DR | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 21" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Survey Overdue | NetSpeed LLC | Complete | JOHN DOWNEY DR | New Britain | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 6" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | EAST ST | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 5" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | GOLF BLVD | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 6" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | STANLEY ST | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 15" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HARTFORD RD | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 20" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | FARMINGTON AVE | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | REQUESTING ES TO REPLACE POLE WITH 50'-2 DUE TO CAMM MED SPAN CLEARENCE TRANSFER EXISTING POWER | raise secondary 48" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | FARMINGTON AVE | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | Existing double pole in field | raise secondary 15" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | VIOLA LN | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 17" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | MARWOOD DR | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | WINFIELD DR | New Britain | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | CROWN CASTLE | Complete | SELES RD | Ashford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 40/2. TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y
  8. Part 8 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Tilson Technology Management | Complete | WHITING ST | Plainville | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise Secondary and Streetlight 25"; Extend 2" Secondary riser 25" with 3" PVC shield; Remove Weatherhead | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | MAJOR DR | Plainfield | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 40' class 1 pole (Sole) / Rmv. 35' class 4 pole.Inst. 10" PISA at a lead of 11' for DE Tap.Inst. (2) 14M ins. anc. guys at 42" & 84", attach to 11'L DE anc.Inst. (2) 14M non-ins. span guys at 82" & 84" run to poles 309 & 2660 (attach opposite Sec. DE at pole 2660 & 12" below SL bracket at 309).Attach DE Sec. at 82".Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | MAJOR DR | Plainfield | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 40' class 1 pole (Sole) / Rmv. 35' class 4 pole.Inst. (2) 14" PISAs at leads of 8' & 11' for DDE Pri.Inst. (3) 18M ins. anc. guys at 22", 24", 42" & 44", attach to 14'L and 16'L DE ancs. (attach 2 to each anc.)Attach DE Sec. at 82".Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | MAJOR DR | Plainfield | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 40' class 2 pole (Sole) / Rmv. 35' class 4 pole.Inst. 10" & 14" PISAs at leads of 14' & 16' for DDE Pri.Inst. (3) 18M ins. anc. guys at 22", 24" & 44", attach to 14'L and 16'L DE ancs. (attach 2 to 16'L anc.)Attach DE Sec. at 82".Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Tilson Technology Management | Complete | PARK AVE | Windsor | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | EVS TO REPLACE POLE WITH 45/2 | Existing Attachment auto-added. | Y Non CONNECTICUT LIGHT&POWER New or Replace Poles | Attachment Overdue | VERIZON WIRELESS | Complete | OENOKE RDG | New Canaan | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | null | Transfer To New Pole | REPLACE | null | FTR TO REPLACE POLE WITH 45/1 | FTR Inst 45' class 1 pole (JO) / Remove 40' class 4 pole. Splice new TPX Neut. into existing 1/0 Neut., attach at 109". | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Attachment Overdue | MD7, LLC | Complete | MANAFORT DR | New Britain | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | null | Complete installation of 1/0 TPX & connect to existing Sec.. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Attachment Overdue | MD7, LLC | Complete | STRATFORD RD | New Britain | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 45' class 2 pole (FO) / Remove 40' class 3 pole.Inst. (1) anc. at a lead of 14' for corner bisector.Inst. 1/0 TPX to pole 4056, removing existing 1/0 Neut., attach at 82". Inst. (1) 14M ins. anc. guy at 22", attach to the 14' lead bisector anc.. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | null | Complete | 3742-S | 31 King Arthur's Way | Newington | FRONTIER (AT&T - CT) | FRONTIER (AT&T - CT) | MAKE-READY | Other | null | null | null | Install down guy at H=27'7" with 14M to existing 1"TT anchor L=5'; Install 14M span guy backing primary to P.3742 | Y
  9. Part 9 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | FARMINGTON AVE | West Hartford | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | POWER TO REPLACE POLE WITH A 45/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | NetSpeed LLC | Complete | AVALON RD | West Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 6" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | BOULEVARD | West Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 45/1 DUE TO COMM CLEARENCE TRANSFER EXISTING POWER TRANSFER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | QUAKER LN N | West Hartford | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise streetlight 8" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | FOXCROFT RD | West Hartford | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise streelight 14" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | TROUT BROOK DR | West Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | VERA ST | West Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 35/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | BOULEVARD | West Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | EVS TO REPLACE POLE WITH 45/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | BOULEVARD | West Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Inspection | CROWN CASTLE | Complete | BUNKER HILL AVE | Waterbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 45/1 TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Siena Engineering Group | Complete | LONG RIDGE RD | Stamford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | EVS TO REPLACE POLE WITH 45/1- EVS TO BUY 5' EXTRA | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | KENSINGTON AVE | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Nonbillable raise secondary 24" install guy Billable raise SL 20" street light height meets existing clearance requirements but needs to shift up for comms to go up to fit new attachment | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | COLONY RD | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 4" no existing clearance violation. shift needed to fit new comm | Y
  10. Part 10 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | COLONY RD | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | DOUBLE POLE | raise secondary 14" raise sl 6" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | STONYCREST DR | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 16" no existing clearance issue. sl shift needed to fit new comm | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | LAKEVIEW AVE | Danbury | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 55" extend riser | Y Non CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | APPLEWOOD DR | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | null | Transfer To New Pole | REPLACE | null | FTR TO REPLACE POLE WITH 40-2 PER EL REQUEST | FTR replace pole 40/2 | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | WARWICK ST | Middletown | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 13" raise aerial cable 11" extend riser | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | S MAIN ST | Middletown | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 14" raise aerial cable 23" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Siena Engineering Group | Complete | MIDDLE ST | Middletown | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 45' class 1 pole (JO) / Abdn. 40' class 3.Inst. (1) anc. at a lead of 12' for DE.Attach Sec./Sec. tap at 109".Inst. (1) 14M non-ins. anc. guy at 109", attach to the 12' lead DE anc...Transfer cutouts & xfrmr bank (Inst. zap shields)Note: Pole replaced at phones request, due to clearances to ground level with new attachment (power space at 40' pole joint space). | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Siena Engineering Group | Complete | MIDDLE ST | Middletown | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 45' class 1 pole (JO) / Abdn. 40' class 2.Inst. (1) anc. at a lead of 14' for corner bisector.Attach Sec. at 109".Inst. (1) 18M ins. anc. guy at 22", attach to the 14' lead bisector an...Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Siena Engineering Group | Complete | MIDDLE ST | Middletown | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 50' class 1 pole (JO) / Abdn. 45' class 3.Inst. (2) ancs. at leads of 20' & 24' for DE (24' for ES use only).Attach Sec. DE at 128".Attach Neut./Neut. tap at 136".Inst. (2) 18M ins. anc. guys at 50" & 51", attach both to the 24' lead DE anc.Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | EDGEMARK ACRES RD | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise step xfmr 24" raise sec 24" no existing clearance violation. shift up required to make space for new comm | Y

Text of NECTA-060_Final.pdf

Extracted from the file · 1 page · 1,114 characters

Text of NECTA-060 Attachment 1.pdf

Extracted from the file · 15 pages · 67,516 characters

As listed on the current system

Question(s) Answered 45, 54, 57, 60 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026

This filing on the current system (opens in a new tab)