Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 45, 54, 57, 60

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

  1. Page 10 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 10 of 39 Category ConversationID Frontier Application Fees CL&P Application Fees CL&P Survery Fees Make-Ready Estimate Amount True-Up Cost ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo StreetAddress Town OwnerName Custodian Latitude Longitude AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1365678 $18,525.00 $150.00 $20,725.00 $138,034.76 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381653 Complete 4294192 79 CARTA LN Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28087235 -72.44461823 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1365678 $18,525.00 $150.00 $20,725.00 $138,034.76 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381653 Complete 4294223 79 CARTA LN Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.28124237 -72.44441223 null null REPLACE null Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Inst. 10" DE PISA at a lead of 5'.Inst. 18M non-ins. anc. guy at 52", attach to the 5' lead DE anc.Inst. 14M ins. span guy at 40", run to pole 209 (attach opposite of Pri. DE at pole 102).Attach Sec. at 52". Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Cut and kick for riser.Inst. 10" DE PISA at a lead of 11'.Inst. 14M non-ins. anc. guy at 52", attach to the 11' lead DE anc.Attach Sec. at 52".Replace Sec. riser for new pole height. Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1365552 $18,500.00 $150.00 $17,850.00 $44,330.10 Awaiting MR Payment NetSpeed LLC 1/6/2023 1/26/2023 1381610 Complete 4303435 1185 ESSEX RD Westbrook CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.29033661 -72.44655609 null null REPLACE null Inst 40' class 2 pole (JO) / Abdn 35' class 4 pole.Pole in grass.Attach Sec. at 82".Inst. 16'L 10" PISA DE anchor at 352 degrees.Inst 18M ins. anc. guy at 82", attach to 16'L DE anc.Transfer street light. CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4644768 5047 GLENN RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74264526 -72.62583923 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4644765 5048 GLENN RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74262238 -72.6262207 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4656730 4647 GLENN RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74227524 -72.62580872 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4671053 4590 GLENN RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74300003 -72.62591553 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y FRONTIER 41.74020004 -72.62480927 MAKE-READY Shift Raise null null null raise secondary 4" and dress loop Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4637495 3008 HOLLISTER DR East Hartford FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4641426 4793 JEFFERSON LN East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.73959732 -72.62229156 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4647263 4650 GRAHAM RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74136734 -72.62652588 null null REPLACE null ES replace pole 45/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4651545 4794 JEFFERSON LN East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.73976898 -72.62259674 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4654806 4753 LEICHTNER DR East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74230576 -72.62446594 MAKE-READY Street Light Bracket null null null raise SL 6" Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4642119 4788 JEFFERSON LN East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74007034 -72.62044525 null null REPLACE null ES replace pole 40/1 Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1559257 $16,275.00 $150.00 $22,125.00 $271,388.97 Awaiting MR Payment NetSpeed LLC 10/2/2023 10/5/2023 1596047 Complete 4914548 4709 GRAHAM RD East Hartford CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.74199295 -72.62398529 null null REPLACE null ES replace pole 45/1 Meriden FRONTIER 41.56778336 -72.77277374 MAKE-READY Shift Raise null null null Existing Attachment auto-added. raise secondary 6" existing clearances are met. shifting needed to make space for new comm Y FRONTIER/CONNECTICUT LIGHT&POWER Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79606628 -72.54679871 MAKE-READY Street Light Bracket null null null raise streetlight 17" Y Manchester FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.79993439 MAKE-READY Street Light Bracket null null null raise streetlight 4" Y Bethel CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER ES TO RAISE SEC & SL 18" raise secondary and streetlight 18" no existing clearance violation. shift up needed to allow new comm Y Bethel CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null DOUBLE POLE raise secondary and streetlight 10" no existing clearance violation. shift up needed to allow for new comms transfer Y Bethel CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null DOUBLE POLE - ES TO RAISE SEC TO 25'9 raise secondary 12" no existing clearance violation. shift up need to allow transfer of new comm Y null ES replace pole 50/1 5E due to insufficient space on poleno existing clearance violation and cannot shift up. taller pole needed for new comm Existing Attachment auto-added. Y null null raise sl 4" existing clearance between comms and sl is met. sl needs to be shifted up to make room for new comm Y null ES replace pole 45/2 due to comm spaceno nesc clearance issue. extra space needed in comm space Existing Attachment auto-added. Y null Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Neut. at 82".Replace ¼ mile arresters.Note: Pole replaced at phones request, due to comms clearances in midspan with new attachment. Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1648704 1599574 1599574 1651769 1651769 1651769 1651769 1926597 1840700 1676739 1676739 $15,900.00 $14,900.00 $14,900.00 $14,525.00 $14,525.00 $14,525.00 $14,525.00 $13,525.00 $13,025.00 $12,900.00 $12,900.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $16,000.00 $16,250.00 $16,250.00 $15,625.00 $15,625.00 $15,625.00 $15,625.00 $15,500.00 $14,500.00 $14,250.00 $14,250.00 $10,515.03 Awaiting MR Payment $922.55 Awaiting MR Payment $922.55 Awaiting MR Payment $44,247.19 Awaiting MR Payment Awaiting MR Payment $44,247.19 $44,247.19 Awaiting MR Payment $44,247.19 Awaiting MR Payment $524.67 Awaiting MR Payment $11,525.68 $10,048.08 $10,048.08 Awaiting MR Payment $9,618.11 $9,618.11 Make-Ready Overdue Make-Ready Overdue NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC GrecoWolf Engineering GrecoWolf Engineering 2/8/2024 11/15/2023 11/15/2023 9/6/2024 9/6/2024 9/6/2024 9/6/2024 10/15/2025 3/31/2025 4/29/2024 4/29/2024 2/22/2024 11/21/2023 11/21/2023 9/18/2024 9/18/2024 9/18/2024 9/18/2024 10/22/2025 4/9/2025 8/7/2024 8/7/2024 1655949 1619436 1619436 1746452 1746452 1746452 1746452 1939913 1845351 1730508 1730508 Complete Complete Complete Complete Complete Complete Complete Complete Complete Complete Complete 4492926 4711323 4922939 4363655 4353103 4872065 4351282 4678534 4504808 4782290 4768351 3142 3988 4865 28 22 23 34 2809 1503 162 5325 WILBUR CROSS PKWY TOLLAND TPKE TOLLAND TPKE GRASSY PLAIN ST GRASSY PLAIN ST GRASSY PLAIN ST GRASSY PLAIN ST LOCUST ST NEWFIELD ST BLUE HILLS AVE BLUE HILLS AVE Bethel Manchester Middletown Bloomfield CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER -72.5376358 41.36901093 -73.42191315 41.37079436 -73.42301888 41.37049866 -73.42282867 41.36671448 -73.4211731 41.77130508 -72.52272797 41.56715012 -72.67093658 41.86536789 -72.71788025 Bloomfield CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.87399673 -72.72805786 CONNECTICUT LIGHT&POWER MAKE-READY MAKE-READY MAKE-READY null MAKE-READY null null null REPLACE null Existing Attachment auto-added. Y null null null raise secondary 27" Y Shift Raise null null null raise secondary 26" Y null ES inst. 50' class 1 (T5) / Abdn 45' class 3.Pole behind sidewalk.Attach Sec. at 109".Inst. zap shields.Transfer cutouts, xfrmr bank & streetlight.Note: Pole replaced at phones request due to midspan clearance with new attachment. Existing Attachment auto-added. Y $12,576.81 Awaiting MR Payment NetSpeed LLC 10/15/2025 10/22/2025 1939903 Complete 4919000 1603 CHESTNUT ST Manchester 41.77263641 -72.52558899 $12,125.00 $874.66 Awaiting MR Payment NetSpeed LLC 3/15/2024 3/20/2024 1666649 Complete 4490603 2484 LAWN AVE Middletown FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.55244827 -72.65666962 Middletown FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER 41.55395126 -72.65433502 MAKE-READY CONNECTICUT LIGHT&POWER New or Replace Poles 1608450 $11,150.00 $150.00 $11,000.00 $80,213.04 Awaiting MR Payment NetSpeed LLC Precision Valley Communications 3/15/2024 11/8/2023 3/20/2024 11/27/2023 1666649 1620806 Complete Complete 4482408 4247437 2138 20217 HIGH ST NORTH AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12156296 -73.40945435 REPLACE Shift Raise $13,625.00 $150.00 Awaiting MR Payment null REPLACE null $150.00 $11,525.00 $874.66 null null MAKE-READY $12,150.00 1632829 $12,125.00 Street Light Bracket REPLACE null 1925696 $150.00 null null REPLACE CONNECTICUT LIGHT&POWER Make-Ready Attachments $11,525.00 Shift Raise null null null null CONNECTICUT LIGHT&POWER/FRONTIER 1632829 Shift Raise null ES set 45' class 2 pole (JO) / Abdn. 40' class 4 pole.Cut & kick pole for Comms. riser.Attach Neut. at 109".Note: Pole replaced at phones request, due to comms clearances in midspan with new attachment. ES replace pole 40/2 due to insufficient spaceno existing NESC clearance issues. more space is needed to fit new comm CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments Shift Raise Y null null REPLACE
  2. Page 11 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 11 of 39 Category ConversationID Frontier Application Fees CL&P Application Fees CL&P Survery Fees Make-Ready Estimate Amount True-Up Cost ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo StreetAddress Town OwnerName Custodian Latitude Longitude AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1608450 $11,150.00 $150.00 $11,000.00 $80,213.04 Awaiting MR Payment Precision Valley Communications 11/8/2023 11/27/2023 1620806 Complete 4249527 20211 NORTH AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12190247 -73.41069794 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1608450 $11,150.00 $150.00 $11,000.00 $80,213.04 Awaiting MR Payment Precision Valley Communications 11/8/2023 11/27/2023 1620806 Complete 4249519 20213 NORTH AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12176895 -73.41034698 null null REPLACE null ES inst. 50' class 1 (T5) / Abdn 45' class 4.Attach Sec. at 109".Inst. (1) 14M ins. stub guy at 22", run to pole 20211-S, attach at existing location at pole 20211-S.Inst. zap shields.Transfer cutouts, xfrmr bank & streetlight.Note: Pole replaced at phones request due to midspan clearance with new attachment. ES inst. 45' class 2 / Abdn 40' class 4.Attach Sec./Sec. tap at 109".Note: Pole replaced at phones request due to midspan clearance with new attachment. Existing Attachment auto-added. Y null ES inst, 50' class 1 (T5) / Abdn 45' class 4.Attach Sec. at 109".Inst. zap shield.Transfer cutout, xfrmr & streetlight.Note: Pole replaced at phones request due to midspan clearance with new attachment. Existing Attachment auto-added. Y null Set 45' class 1 pole (JO) / Abdn. 40' pole.Cut & kick pole for comms. risers. Inst. (2) xarms & ridge pin at 7.5" for 3PH Pri. Attach Sec. at 109". Adjust SVC & xfer SVC. Inst. (1) 18M ins. anc. guy at 22", attach to new anc. Rmv. existing guy & 100% LTS anc. set in stone wall. Existing Attachment auto-added. Y null Set 45' class 2 pole (JO) / Abdn. 40' class 2 pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Attach Sec. & DE Sec. at 109". Xfer 50KVA xfmr w/ 6K cutout. Inst. zap shield. Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1608450 1698919 1698919 $11,150.00 $10,400.00 $10,400.00 $150.00 $150.00 $150.00 $11,000.00 $10,250.00 $10,250.00 $80,213.04 $142,952.33 $142,952.33 Awaiting MR Payment Make-Ready Overdue Make-Ready Overdue Precision Valley Communications Precision Valley Communications Precision Valley Communications 11/8/2023 5/23/2024 5/23/2024 11/27/2023 7/30/2024 7/30/2024 1620806 1727387 1727387 Complete Complete Complete 4247120 4252335 4252104 20212 25730 25734 NORTH AVE COMPO RD S COMPO RD S Norwalk Westport Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.1218338 41.1322937 -73.41051483 -73.35719299 41.13126199 -73.35779718 null null null null null null REPLACE REPLACE REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1698919 $10,400.00 $150.00 $10,250.00 $142,952.33 Make-Ready Overdue Precision Valley Communications 5/23/2024 7/30/2024 1727387 Complete 4265551 25732 COMPO RD S Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.13175583 -73.35749817 null null REPLACE null Set 45' class 2 pole (JO) / Abdn. 35' pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Attach Sec. at 109". CONNECTICUT LIGHT&POWER New or Replace Poles 1698919 $10,400.00 $150.00 $10,250.00 $142,952.33 Make-Ready Overdue Precision Valley Communications 5/23/2024 7/30/2024 1727387 Complete 4251804 2068 GREEN ACRE LN Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.1316185 null null REPLACE null Set 40' class 2 pole (JO) / Abdn. 30' pole.Attach Sec. at 82". Existing Attachment auto-added. Y null Set 45' class 1 pole (JO) / Abdn. 40' pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Inst. 1PH tap at 30". Xfer 40K cutout & 12KV arrester. Attach DE Neut. at 103".Attach Sec. at 109" & resag to pole 25739 & adjust SVC. Inst. (1) 18M ins. anc. guy at 22", attach to new anc. Rmv. existing guy & 100% LTS anc. Xfer street light & bracket. Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1698919 $10,400.00 $150.00 $10,250.00 $142,952.33 Make-Ready Overdue Precision Valley Communications 5/23/2024 7/30/2024 1727387 Complete 4857750 25740 COMPO RD S Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER -73.3527832 41.12947464 -73.35890961 null null REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1698919 $10,400.00 $150.00 $10,250.00 $142,952.33 Make-Ready Overdue Precision Valley Communications 5/23/2024 7/30/2024 1727387 Complete 4248216 25742 COMPO RD S Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12896347 -73.35926056 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1698919 $10,400.00 $150.00 $10,250.00 $142,952.33 Make-Ready Overdue Precision Valley Communications 5/23/2024 7/30/2024 1727387 Complete 4263129 25743 COMPO RD S Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12872314 -73.35938263 null null REPLACE null Set 45' class 2 pole (JO) / Abdn. 40' class 2 pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Attach Sec. & DE Sec. at 109". Inst. SVC riser, replacing existing SVC riser. Break asphalt & cut & kick for riser replacement. Inst. (1) 18M non-ins. anc. guy at 109", attach to new DE sidewalk anc. Rmv. existing guy. Xfer 50KVA xfmr w/ 6K cutout. Inst. zap shield.Xfer SVC. Set 45' class 2 pole (JO) / Abdn. 35' class 4 pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri. Attach Sec. at 109" & adjust SVC & midspan SVC to pole 25742. CONNECTICUT LIGHT&POWER New or Replace Poles 1698919 $10,400.00 $150.00 $10,250.00 $142,952.33 Make-Ready Overdue Precision Valley Communications 5/23/2024 7/30/2024 1727387 Complete 4251560 25753 COMPO RD S Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12555313 -73.3605957 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1700443 $10,400.00 $150.00 $10,375.00 $33,825.06 Awaiting MR Payment Precision Valley Communications 5/28/2024 7/31/2024 1727803 Complete 4269950 27130 POST RD E Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.13870621 -73.31916046 null null REPLACE null Set 45' class 1 pole (JO) / Abdn. 40' class 2 pole.Break asphalt, cut & kick, & hand-dig for pole replacement. Inst. xarm & ridge pin at 7.5" for 3PH Pri.Inst. 1PH tap at 30". Inst. 12KV arrester. Attach DE Neut. at 103". Attach Neut./Sec. & DE Sec. at 109". Inst. (1) 18M ins. anc. guy at 22", attach to new sidewalk anc. Inst. (1) 18M ins. span guy at 46", run to pole 25752 & inst. at 46". Xfer (1) SVC. Remove: 45', Install: 45/1; Replace due to clearance issues; Attach neutral 109" from pole top; Replace (3) fuses; Install 18M primary down guy to new ES-set 1"TT anchor LL=8', P=DE null Set 45' class 2 pole (JO) / Abdn. 40' class 2 pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Inst. 1PH tap at 30". Xfer 15K cutout & 12KV arrester. Attach DE Neut. at 103".Attach Sec. & DE Sec. at 109" & adjust SVC. Inst. SVC riser, replacing existing SVC riser. Cut & kick for riser replacement.Inst. (1) 14M ins. anc. guy at 46", attach to new anc. Xfer street light & bracket. Existing Attachment auto-added. Y null Set 50' class 2 pole (JO) / Abdn. 40' class 3 pole.Inst. (2) xarms & ridge pin at 7.5" for med. cor. 3PH Pri.Attach Sec. at 136". Inst. SVC riser, replacing existing SVC riser. Cut & kick for riser replacement.Inst. (1) 14M ins. anc. guy at 22", attach to new anc. Rmv. existing guy. Existing Attachment auto-added. Y null Set 40' class 2 pole (JO) / Abdn. 30' pole.Attach DE Sec. at 82". Inst. SVC riser, replacing existing SVC riser. Cut & kick for riser replacement.Inst. (1) 18M non-ins. anc. guy at 82", attach to new DE anc. Rmv. existing guy. Existing Attachment auto-added. Y null Set 40' class 2 pole (JO) / Abdn. 35' class 5 pole.Attach DE 1PH Pri. at 5". Attach Sec. at 82" & adjust (2) SVCs. Inst. 14M ins. span guy at 22", run to pole 5825 & inst. at 12". Rmv. existing span guy. Xfer 50KVA xfmr w/ 6K cutout. Inst. zap shield. Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1701752 1701752 1701752 1701752 $10,400.00 $10,400.00 $10,400.00 $10,400.00 $150.00 $150.00 $150.00 $150.00 $10,375.00 $10,375.00 $10,375.00 $10,375.00 $24,246.98 $24,246.98 $24,246.98 $24,246.98 Make-Ready Payments Received Make-Ready Payments Received Make-Ready Payments Received Make-Ready Payments Received Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications 5/31/2024 5/31/2024 5/31/2024 5/31/2024 7/30/2024 7/30/2024 7/30/2024 7/30/2024 1727402 1727402 1727402 1727402 Complete Complete Complete Complete 4857276 4248649 4248394 4249012 25762 25757 7047 4603 COMPO RD S COMPO RD S HORSESHOE LN W KEYSLER RD Westport Westport Westport Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.12347412 -73.36101532 41.12463379 -73.36094666 41.12434006 -73.36382294 41.12586212 -73.36346436 null null null null null null null null REPLACE REPLACE REPLACE REPLACE
  3. Page 12 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 12 of 39 Category CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles ConversationID 1701752 1700696 Frontier Application Fees $10,400.00 $10,400.00 CL&P Application Fees $150.00 $150.00 CL&P Survery Fees $10,375.00 $10,375.00 Make-Ready Estimate Amount True-Up Cost $24,246.98 ConversationCurrentStatus Make-Ready Payments Received $41,048.49 Make-Ready Overdue PermittingCompany Precision Valley Communications Precision Valley Communications ApplicationSubmitted 5/31/2024 5/31/2024 SurveyStart 7/30/2024 7/30/2024 PowerSurvey 1727402 1727392 PowerSurveyStatus Complete Complete PoleID 4246217 4252446 PoleNo 32652 27153 StreetAddress WAKEMAN PL POST RD E Town Westport Westport OwnerName CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER Custodian CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Latitude 41.12516403 Longitude -73.3679657 41.13887787 -73.32624817 AttachmentWorkType null null AttachmentMRAction null null PoleWorkType REPLACE REPLACE PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable null Set 45' class 2 pole (JO) / Abdn. 40' class 2 pole.Attach lrg. cor. 1PH Pri at 5". Attach DDE Sec. at 109"Inst. SVC riser, replacing existing SVC riser. Cut & kick for riser replacement. Inst. (2) 18M non-ins. anc. guys at 109", attach (1) to each new DE anc. Rmv. (2) existing guys. Xfer 50KVA xfmr w/ 6K cutout. Inst. zap shield. Xfer SVC. Existing Attachment auto-added. Y null ES set 50' class 1 pole (JO) / Abdn. 45' class 2 pole.Attach Neut. at 120" & Sec. at 136".Replace bypass switches (AWC preference for TR)..Transfer recloser & recloser control.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1664369 $10,275.00 $150.00 $10,125.00 $2,905.91 Awaiting MR Payment Precision Valley Communications 3/18/2024 5/29/2024 1701923 Complete 4287169 24616 DUDLEY RD Wilton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.18820953 -73.40396881 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1699311 $10,275.00 $150.00 $10,125.00 $207,367.41 Awaiting MR Payment Precision Valley Communications 5/23/2024 8/1/2024 1728544 Complete 4256403 27176 POST RD E Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.1377182 -73.33693695 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1699311 $10,275.00 $150.00 $10,125.00 $207,367.41 Awaiting MR Payment Precision Valley Communications 5/23/2024 8/1/2024 1728544 Complete 4254625 27178 POST RD E Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.13763428 -73.33770752 null null REPLACE null Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Neut. at 82".Note: Pole replaced at phones request, due to clearances to ground level with new attachment. ES Install: 50/1, Remove: 40/3; Replace due to comms need for additional clearances; Transfer 1200KVAR Capacitor Bank; Refer to DTR19.371 for cap bank installation details; Attach neutral 163" from pole top ES Install: 50/2, Remove: 40/2; Due to uplift from adjacent replacement; Transfer and fuse XFMR, install zap shield; Attach secondary 163" from pole top Existing Attachment auto-added. Y null ES Install: 50/2, Remove: 40/3; Replace due to comms need for additional clearances; Cut & kick (primary riser); Refer to DTR12.251 for construction details; Stagger splices for maximum space under shield; Attach secondary 163" from pole top; Replace 18M span guy to P.30069 (P=DE at P.30069) Existing Attachment auto-added. Y null ES Install: 50/2, Remove: 45/3; Replace due to comms need for additional clearances; Transfer and fuse XFMR, install zap shield; Attach secondary 163" from pole top, SVC exists midspan; Replace 14M primary span guy (backing messenger DE) to P.27171 Existing Attachment auto-added. Y ES Install: 50/2, Remove: 45/3; Replace due to comms need for additional clearances; Cut & kick (primary riser); Refer to DTR12.251 for construction details; Stagger splices for maximum space under shield; Splice through 1/0 QPX and attach tangent 163" from pole top, attach 1/0 TPX 147" from pole top Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1699311 1699311 $10,275.00 $10,275.00 $150.00 $150.00 $10,125.00 $10,125.00 $207,367.41 $207,367.41 CONNECTICUT LIGHT&POWER New or Replace Poles 1699311 $10,275.00 $150.00 $10,125.00 $207,367.41 CONNECTICUT LIGHT&POWER Make-Ready Attachments 1700375 $10,275.00 $150.00 $10,125.00 $427.50 CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1700375 1702415 1702415 1702415 1702415 1702415 $10,275.00 $10,275.00 $10,275.00 $10,275.00 $10,275.00 $10,275.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $10,125.00 $11,125.00 $11,125.00 $11,125.00 $11,125.00 $11,125.00 Awaiting MR Payment Awaiting MR Payment $427.50 Complete 4260925 4251875 27177 27170 POST RD E POST RD E Westport Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.13766861 -73.33740997 41.13803864 -73.33486176 null null null null REPLACE REPLACE 1728544 Complete 4254691 24971 POST RD E Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.13841629 -73.3321991 null null REPLACE null Make-Ready Payments Received Precision Valley Communications 5/28/2024 7/31/2024 1727826 Complete 4258627 15924 HUNT CLUB LN Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.14572525 -73.3117981 MAKE-READY Other null null null Raise secondary 8" Y null Remove: 40/2Install: 45/2Replace due to FTR request; Attach secondary 109" from pole top Existing Attachment auto-added. Y null ES TO REPLACE POLE WITH 45/1 DUE TO COMM MIDSPAN CLEARANCE TRANSFER EXISTING POWER Existing Attachment auto-added. Y null ES TO REPLC POLE WITH 45/1 DUE TO COMM CLEARANCE TRANSFER EXISTING POWER Existing Attachment auto-added. Y null ES TO REPLACE POLE WITH 45/1 C&K DUE TO 5' REPLACEMENT OF P.25788 TRANSFER EXISTING POWER Existing Attachment auto-added. Y null ES TO REPLACE POLE WITH 40-1 C&K DUE TO 5' RULE REPLACEMENT OF P.25788 TRANSFER EXISTING POWER Existing Attachment auto-added. Y null ES TO REPLACE POLE WITH 50/1 DUE TO COMM MIDSPAN CLEARANCE TRANSFER EXISTING POWER Existing Attachment auto-added. Y Existing Attachment auto-added. Y Awaiting MR Payment $126,037.46 1728544 Complete 8/1/2024 Awaiting MR Payment $126,037.46 8/1/2024 1728544 5/23/2024 Awaiting MR Payment $126,037.46 5/23/2024 8/1/2024 Precision Valley Communications Awaiting MR Payment $126,037.46 Precision Valley Communications 5/23/2024 Awaiting MR Payment Make-Ready Payments Received $126,037.46 Precision Valley Communications Awaiting MR Payment Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications 5/28/2024 6/5/2024 6/5/2024 6/5/2024 6/5/2024 6/5/2024 7/31/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 1727826 1728502 1728502 1728502 1728502 1728502 Complete Complete Complete Complete Complete Complete 4258406 4244290 4255893 4247267 4251702 4244325 5977 25796 25789 25789 5123 25788 OLD ORCHARD RD COMPO RD S COMPO RD S COMPO RD S HEDGEROW LN COMPO RD S Westport Westport Westport Westport Westport Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.14209747 -73.31278229 41.11554718 -73.35931396 41.11480713 -73.35877991 41.11602402 -73.36030579 41.11587143 -73.36071014 41.11614609 -73.36071014 null null null null null null null null null null null null REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1702415 $10,275.00 $150.00 $11,125.00 $126,037.46 Awaiting MR Payment Precision Valley Communications 6/5/2024 8/1/2024 1728502 Complete 4247586 25787 COMPO RD S Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11629105 -73.36112213 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1712336 $10,150.00 $150.00 $10,000.00 $5,583.00 Make-Ready Overdue Siena Engineering Group 6/27/2024 7/10/2024 1719646 Complete 4363347 C5187 QUAKER FARMS RD Oxford CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.39413452 null null REPLACE null ES TO REPLACE POLE WITH 45/2 DUE TO 5' RULE REPLACEMENT OF P.25788. TRANSFER EXISTING POWER Set 45' class 1 pole (JO) / Abdn. 35' class 4 pole.Attach Neut./Sec. at 109".Transfer Xfrmr & cutout, inst. zap shield. Existing Attachment auto-added. Y null ES TO REPLACE POLE WITH 40/1' DUE TO MIDSPAN CLEARANCE ISSUES TRANSFER EXISTING POWERS Existing Attachment auto-added. Y null ESTO REPLACE POLE WITH 40/1' DUE TO MIDSPAN CLEARANCE ISSUES TRANSFER EXISTING POWERS Existing Attachment auto-added. Y null ES TO REPLACE POLE WITH 40/1' DUE TO MIDSPAN CLEARANCE ISSUES TRANSFER EXISTING POWERS null Y null EL TO REPLACE POLE WITH 40-1 TO AVOID P29934 REPLACEMENT TRANSFER EXISTING POWER Existing Attachment auto-added. Y null Set 40' class 2 pole (JO) / Abdn 35' class 4 pole.Attach Sec. at 82".Inst. (1) 14M ins. span guy at 22", run to pole 18344 (attach at 12" above Sec. at pole 18344)Inst cutout and zap shield.Transfer Xrfmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1621879 1621879 1621879 1621879 1623337 $10,025.00 $10,025.00 $10,025.00 $10,025.00 $10,025.00 $150.00 $150.00 $150.00 $150.00 $150.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,250.00 $29,772.09 $29,772.09 $29,772.09 $29,772.09 $21,719.46 $29,867.26 $29,867.26 $29,867.26 $29,867.26 Make-Ready Overdue Make-Ready Overdue Make-Ready Overdue Make-Ready Overdue Make-Ready Overdue Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications 12/1/2023 12/1/2023 12/1/2023 12/1/2023 12/18/2023 1/8/2024 1/8/2024 1/8/2024 1/8/2024 2/1/2024 1635940 1635940 1635940 1635940 1646905 Complete Complete Complete Complete Complete 4248206 4250402 4251742 4857674 4257876 20173 29932 31408 29933 18343 HAZEL ST HARVARD ST CARLIN ST HARVARD ST CREEPING HEMLOCK DR Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER -73.1397171 41.12883794 -73.40265409 41.1287106 41.130594 -73.40050772 -73.39982759 41.12863979 -73.40027976 41.14359665 -73.42292023 null null null null null null null null null null REPLACE REPLACE REPLACE REPLACE REPLACE
  4. Page 13 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 13 of 39 Category ConversationID CONNECTICUT LIGHT&POWER New or Replace Poles 1650257 CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1702310 1702310 1702310 1702310 Frontier Application Fees $10,025.00 $10,025.00 $10,025.00 $10,025.00 $10,025.00 CL&P Application Fees $150.00 $150.00 $150.00 $150.00 $150.00 CL&P Survery Fees $9,750.00 $9,875.00 $9,875.00 $9,875.00 $9,875.00 Make-Ready Estimate Amount True-Up Cost $5,959.93 $100,022.69 ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo StreetAddress Town OwnerName Custodian Awaiting MR Payment Precision Valley Communications 2/12/2024 3/28/2024 1670109 Complete 4293949 3 MAYFLOWER DR Wilton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Awaiting MR Payment $100,022.69 Awaiting MR Payment $100,022.69 Awaiting MR Payment $100,022.69 Awaiting MR Payment Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications 6/4/2024 6/4/2024 6/4/2024 6/4/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 1728535 1728535 1728535 1728535 Complete Complete Complete Complete 4247874 4254081 4259531 4857251 26113 26112 26111 26110 SAUGATUCK AVE SAUGATUCK AVE SAUGATUCK AVE SAUGATUCK AVE Westport Westport Westport Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Latitude Longitude 41.23371506 -73.49378967 41.12189102 -73.37308502 41.12218857 -73.37295532 41.12279511 -73.37290955 41.12321854 -73.37280273 AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason null null REPLACE null PoleComment Remove: 30/5Install: 35/2Replace due to deflection caused by new attachment; Attach secondary 18" from pole top null null null null null null null null REPLACE REPLACE REPLACE REPLACE PowerSurveyAttachmentComment Billable Existing Attachment auto-added. Y null ES to set 40' class 2 pole (JO) / Abdn 35' class 4.Pole in sidewalk, set new pole at least 18" behind curb face. Attach Sec. at 82".Inst. (1) 14M nonins. span guy at 82", run to pole 26114 (attach at 6" above Sec. at pole 26114).Transfer streetlight.Notes:Pole replaced due to 5' step rule with adjacent billable replacement pole. Existing Attachment auto-added. Y null ES set 45' class 1 pole (E5) / Abdn 40' class 4.Pole in sidewalk, set new pole at least 18" behind curb face. Inst. (2) anc.s at leads of 6' & 8' for corner bisector, place in proximity to existing anc. locations.Attach Sec. at 136".Inst. (1) 18M ins. anc. guy at 5", attach to the 8' lead bisector anc.Inst. (1) 18M non-ins. anc. guy at 136", attach to the 8' lead bisector anc.Transfer streetlight, cutout & xfrmr (inst. zap shield).Note: Pole replaced due to 5' step rule with adjacent billable replacement pole. Existing Attachment auto-added. Y null ES set 50' class 1 pole (JO) / Abdn 45' class 2Set new pole as close to stone retaining wall as feasible.Inst. (1) anc. at a lead of 8', place in proximity to existing power anc. location.Attach 3PH DE x-arm top bolt at 84", maintain slack span of Pri./Neut. cables to pole 27316.Attach (2) DE Neuts. at 134" (to poles 2749 & 27316). Attach Sec. DE at 136".Attach other end span guy at 136", ran from pole 26110.Inst. (1) 18M ins. anc. guy at 92", attach to the 8' lead DE anc.Inst. (1) 18M non-ins. anc. guy at 134", attach to the 8' lead DE anc.Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES set 45' class 1 pole (JO) / Abdn 40' class 4.Pole in grass strip, set new pole behind current location.Attach 1PH tap at 40".Attach Sec. DE at 107", attach Sec. tap at 109".Inst. (1) 14M non-ins. span guy at 107", run to pole 26111.Push brace bracket at 80".Transfer cutout & streetlight.Notes: Pole replaced due to 5' step rule with adjacent billable replacement pole. Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Y CONNECTICUT LIGHT&POWER New or Replace Poles 1702310 $10,025.00 $150.00 $9,875.00 $100,022.69 Awaiting MR Payment Precision Valley Communications 6/4/2024 8/1/2024 1728535 Complete 4248836 10319 LOCUST LN Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12448502 -73.37835693 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1706067 $10,025.00 $150.00 $9,875.00 $23,002.24 Awaiting MR Payment Precision Valley Communications 6/17/2024 8/1/2024 1728458 Complete 4856918 24927 HILLSPOINT RD Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11807632 -73.34588623 null null REPLACE null ES set 40' class 2 pole (JO) / Abdn 35' class 4.Inst. (1) anc. at a lead of 12' for DE.DDE Pri. & Neut., slack span all power cables to pole 25700.Inst. (1) 14M ins. anc guy at 22", attach to 12' lead DE anc..Attach Sec. at 82".Transfer cutout & xfrmr (zap shield already installed).Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Set 45' class 2 pole (JO) / Abdn. 40' class 4 pole.Attach Sec. at 109".Transfer Xfrmr, inst. cutout & zap shield. null Set 45' class 1 pole (JO) / Abdn. 40' class 4 pole.Attach 1PH tap at 30".Attach Sec. at 109". CONNECTICUT LIGHT&POWER New or Replace Poles 1706067 $10,025.00 $150.00 $9,875.00 $23,002.24 Awaiting MR Payment Precision Valley Communications 6/17/2024 8/1/2024 1728458 Complete 4856923 19747 HILLSPOINT RD Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11820602 -73.34581757 null null REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1622622 $9,900.00 $150.00 $9,750.00 $5,405.62 $13,286.81 Make-Ready Overdue Precision Valley Communications 12/8/2023 1/8/2024 1635850 Complete 4252008 16169 SILWEN LN Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.13195861 -73.39238015 null null REPLACE null Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Inst. (2) anc.s at leads of 10' & 13' for bisector/corner & Pri. DE.Attach Sec. at 82".Inst. (1) 18M ins. anc. guy at 22", attach to 13'L DE anc.Inst. (1) 18M non-ins. anc. guy at 70", attach to 10'L bisector anc.Transfer xfrmr & cutout, zap shield already installed. CONNECTICUT LIGHT&POWER Make-Ready Attachments 1630933 $9,900.00 $150.00 $10,000.00 $12,649.09 -$1,856.91 Make-Ready Overdue Precision Valley Communications 1/3/2024 2/19/2024 1654058 Complete 4242886 5112 WHITE OAK RD Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11885834 -73.44367981 MAKE-READY Other null null null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1630933 $9,900.00 $150.00 $10,000.00 $12,649.09 -$1,856.91 Make-Ready Overdue Precision Valley Communications 1/3/2024 2/19/2024 1654058 Complete 4243514 5111 WHITE OAK RD Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11931992 -73.44403076 MAKE-READY Other null null null Existing Attachment auto-added. Replace primary pole top construction with A5 Large Corner; Replace primary down guy with 14M to existing anchor LL=14', P=41 Replace primary pole top construction with A5 Large Corner; Replace primary down guy with 14M to existing anchor LL=11', P=29 Y CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1630933 1630933 1651188 1699434 $9,900.00 $9,900.00 $9,900.00 $9,900.00 $150.00 $150.00 $150.00 $150.00 $10,000.00 $10,000.00 $9,750.00 $9,750.00 $12,649.09 $12,649.09 $5,937.33 $31,333.85 -$1,856.91 -$1,856.91 Make-Ready Overdue Make-Ready Overdue Make-Ready Overdue Make-Ready Payments Received Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications 1/3/2024 1/3/2024 2/15/2024 5/23/2024 2/19/2024 2/19/2024 3/28/2024 8/1/2024 1654058 1654058 1670164 1728553 Complete Complete Complete Complete 4245404 2749 WHITE OAK RD Norwalk FRONTIER/CONNECTICUT LIGHT&POWER 4246688 4821 FILLOW ST Norwalk FRONTIER/CONNECTICUT LIGHT&POWER 4296775 4265273 3917 19616 SUNSET PASS MOSS LEDGE RD Wilton Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER FRONTIER FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.11618805 -73.44434357 41.1192627 -73.43922424 41.25940704 -73.43875122 41.1486702 -73.32137299 MAKE-READY MAKE-READY null null Y Y Other null null null Replace primary down guy with 14M to existing anchor LL=10, P=DE Other null null null Raise secondary 29"; Raise streetlight 18"; Install streetlight conduit Y null Remove: 40/2Install: 40/1Replace due to defective pole tag, overload from new attachment; Attach secondary 82" from pole top; Transfer 25 KVA XFMR, XFMR is fused, zap shield exists; Replace primary down guy with 14M to existing anchor LL=6', P=19'; Service exists mid-span in field Existing Attachment auto-added. Y null Remove: 35/4Install: 40/2Cut+Kick due to secondary riser; Replace due to midspan clearness from the new attachment; Attach secondary 82'' from pole top; Transfer and extend 3'' Secondary riser with 4'' PVC to the secondary level; Replace (2) primary down guys with 14M to (2) new ES set 1'' TT anchors, LL1=11', LL2=13', P=DE Existing Attachment auto-added. Y null null REPLACE REPLACE
  5. Page 14 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 14 of 39 Category CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles ConversationID 1696565 1696565 Frontier Application Fees $9,900.00 $9,900.00 CL&P Application Fees $150.00 $150.00 CL&P Survery Fees $10,000.00 $10,000.00 Make-Ready Estimate Amount True-Up Cost $442,182.72 ConversationCurrentStatus Awaiting MR Payment $442,182.72 Awaiting MR Payment PermittingCompany Precision Valley Communications Precision Valley Communications ApplicationSubmitted 5/23/2024 5/23/2024 SurveyStart 7/30/2024 7/30/2024 PowerSurvey 1727380 1727380 PowerSurveyStatus Complete Complete PoleID 4253670 4272306 PoleNo 2824 2825 StreetAddress MYRTLE AVE MYRTLE AVE Town Westport Westport OwnerName CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER Custodian CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Latitude 41.1424408 Longitude -73.35853577 41.14286041 -73.35878754 AttachmentWorkType null null AttachmentMRAction null null PoleWorkType REPLACE REPLACE PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable null ES TO REPLACE POLE WITH 50-1 DUE TO COMM CLEARANCE ISSUES TRANSFER EXISTING POWER Existing Attachment auto-added. Y null ES TO REPLACE POLE WITH 50-1 DUE TO COMM CLEARANCE ISSUES TRANSFER EXISTING POWER Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1696565 $9,900.00 $150.00 $10,000.00 $442,182.72 Awaiting MR Payment Precision Valley Communications 5/23/2024 7/30/2024 1727380 Complete 4257251 2826 MYRTLE AVE Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.14309692 -73.35873413 null null REPLACE null ES TO REPLACE POLE WITH 50-1 DUE TO COMM CLEARANCE ISSUES TRANSFER EXISTING POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1696565 $9,900.00 $150.00 $10,000.00 $442,182.72 Awaiting MR Payment Precision Valley Communications 5/23/2024 7/30/2024 1727380 Complete 4256834 2823 MYRTLE AVE Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.14218903 -73.35839844 null null REPLACE null ES TO RPLC W/ 50-1 C&K DUE TO CLRNC XFER EXIST PWR Existing Attachment auto-added. Y Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null ES TO REPLACE POLE WITH 50/1 POLE DUE TO COMM MIDSPAN CLEARANCE TRANSFER EXISTING POWER Existing Attachment auto-added. Y Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null ES TO RPLC W/ 45/1 DUE TO COMM CLRNC. XFER EXIST PWR. Existing Attachment auto-added. Y Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null ES TO RPLC W/ 45/2 DUE TO COMM CLRNC XFER EXIST PWR. Existing Attachment auto-added. Y Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER null ES TO REPLACE POLE WITH 45-2 DUE TO THE REPLACEMENT OF P25594 TRANSFER EXISTING POWER Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER 41.13969421 -73.34793854 null null REPLACE null ES TO REPLACE POLE WITH 50-1 DUE TO 5' RULE C& K TRANSFER EXISTING POWER Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER 41.13957977 -73.34754181 null null REPLACE null ES TO RPLC W 50-1 C&K XFER EXIST PWR Existing Attachment auto-added. Y null Remove: 40/2Install: 45/2Cut + Kick due to secondary riser; Replace due to mid-span clearances from new attachment; Attach Secondary 136" from pole top; Transfer 50KVA XFMR, XFMR is fused, install zap shield; Extend 3" Secondary Riser 12" with 4" PVC Shield Existing Attachment auto-added. Y null Remove: 40/2Install: 45/1Replace due to mid-span clearances from new attachment; Attach Secondary 109" from pole top; Replace 18M Span Guy to P. 5669; Replace (2) 18M Primary Down Guy to existing anchor, LL-14' PDE Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1696565 1696565 1696565 1696565 $9,900.00 $9,900.00 $9,900.00 $9,900.00 $150.00 $150.00 $150.00 $150.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $442,182.72 Awaiting MR Payment $442,182.72 Awaiting MR Payment $442,182.72 Awaiting MR Payment $442,182.72 Awaiting MR Payment Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications 5/23/2024 5/23/2024 5/23/2024 5/23/2024 7/30/2024 7/30/2024 7/30/2024 7/30/2024 1727380 1727380 1727380 1727380 Complete Complete Complete Complete 4270915 4271548 4255487 4257058 25594 21095 8757 27220 IMPERIAL AVE JESUP RD JESUP RD IMPERIAL AVE CONNECTICUT LIGHT&POWER New or Replace Poles 1696565 $9,900.00 $150.00 $10,000.00 $442,182.72 Awaiting MR Payment Precision Valley Communications 5/23/2024 7/30/2024 1727380 Complete 4255820 28273 POST RD E Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER New or Replace Poles 1696565 $9,900.00 $150.00 $10,000.00 $442,182.72 Awaiting MR Payment Precision Valley Communications 5/23/2024 7/30/2024 1727380 Complete 4257032 28274 POST RD E Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1700050 1700050 $9,900.00 $9,900.00 $150.00 $150.00 $9,750.00 $9,750.00 $94,233.83 Awaiting MR Payment $94,233.83 Awaiting MR Payment Precision Valley Communications Precision Valley Communications 5/28/2024 5/28/2024 7/31/2024 7/31/2024 1727939 1727939 Complete Complete 4282948 4860231 33333 26833 BAYBERRY LN CROSS HWY Westport Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.13985443 -73.35837555 41.14041138 -73.35980225 41.14007187 -73.35900116 41.1400032 -73.35836029 41.16809082 -73.32828522 41.17253113 -73.32230377 null null null null null null null null null null null null REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1700050 $9,900.00 $150.00 $9,750.00 $94,233.83 Awaiting MR Payment Precision Valley Communications 5/28/2024 7/31/2024 1727939 Complete 4271687 30606 STURGES HWY Westport CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.16775894 -73.31885529 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1615418 $9,775.00 $150.00 $9,625.00 $5,551.49 Awaiting MR Payment Precision Valley Communications 12/1/2023 1/2/2024 1633641 Complete 4257897 20110 GRUMMAN AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.14390945 -73.39875031 null null REPLACE null Remove: 35/4Install: 45/2Replace due to mid-span clearances from new attachment; Attach Secondary 109" from pole top; Transfer 15KVA XFMR, XFMR is fused, zap shield exists; Shift Service mid-span Set 45' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Svc. at 109".Transfer Xfrmr, cutouts & streetlight. Existing Attachment auto-added. Y null ES set 45' class 2 pole (JO) / Abdn. 35' pole.Cut and kick for power/Comm. risers.Attach DDE Sec./Neut. at 107" (North St).Attach DE Sec. tap at 109"Replace/Extend svc riser for new pole height.Transfer cutout & xfrmr (inst. zap shield). Note: Phone requesting replacement due to midspan clearance issues with new attachment. null Y null Set 40' class 2 pole (JO) / Abdn. 35' pole.Attach Neut. at 82". Note: Phone requesting replacement due to midspan clearance issues with new attachment. null Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1640638 1640638 $9,775.00 $9,775.00 $150.00 $150.00 $9,625.00 $9,625.00 $12,314.27 $12,314.27 $1,532.74 $1,532.74 Make-Ready Overdue Make-Ready Overdue Precision Valley Communications Precision Valley Communications 1/25/2024 1/25/2024 2/26/2024 2/26/2024 1657254 1657254 Complete Complete 4587220 4595632 E5 E28 NORTH ST ALAIN WHITE RD Morris Morris CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.68525314 -73.19981384 41.6933136 -73.20038605 null null null null REPLACE REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1670994 $9,775.00 $150.00 $9,625.00 $38,834.19 Awaiting MR Payment Precision Valley Communications 4/5/2024 6/26/2024 1712094 Complete 4235270 46039 FLAX HILL RD Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.09176636 -73.43935394 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1675669 $9,775.00 $150.00 $9,625.00 $103,096.23 Make-Ready Overdue Precision Valley Communications 4/11/2024 6/26/2024 1711790 Complete 4242012 26094 EAST AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11629105 null null REPLACE null ES Inst 55' class 1 pole (E10) / Abdn 50' class 2 pole.ES set (1) anc. at a lead of 16' for AC DE (to West).Attach top bolt of FG x-arm at 84". Attach top bolt of bottom spacer cable bracket at 114".Attach 1PH tap at 146"Attach Sec./Neut. tap at 199". Attach AC DDE at 215" / 217".Inst. (2) 18M non-ins. anc. guy at 205" & 217", attach to the 16' lead DE anc.Inst. (2) 14M ins. span guys at 162" & 215", run both to pole 24604 (attach at existing locations at pole 24604).Transfer cutout, spare fuse holder & streetlightNote: Pole replaced at phones request, due to clearances to ground level. Set 50' class 1 pole (JO) / Abdn. 45' class 2 pole.Attach Sec. at 136".Replace Pri. riser conduit/cable & extend to new pole height.Transfer 15K cutouts. null Set 50' class 1 pole (JO) / Abdn. 45' class 2 pole.Inst. (1) anc. (sidewalk style) at a lead of 8' for Pri. DE.Attach Sec. at 136".Inst. (1) 18M ins. anc. guy at 46", attach to 8'L DE anc.Transfer 15K cutout & street light. CONNECTICUT LIGHT&POWER New or Replace Poles 1675669 $9,775.00 $150.00 $9,625.00 $103,096.23 Make-Ready Overdue Precision Valley Communications 4/11/2024 6/26/2024 1711790 Complete 4856773 34259 EAST AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER -73.4078064 41.11611176 -73.40776062 null null REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1675669 $9,775.00 $150.00 $9,625.00 $103,096.23 Make-Ready Overdue Precision Valley Communications 4/11/2024 6/26/2024 1711790 Complete 4247622 34257 EAST AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11673737 -73.40794373 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1675669 $9,775.00 $150.00 $9,625.00 $103,096.23 Make-Ready Overdue Precision Valley Communications 4/11/2024 6/26/2024 1711790 Complete 4251693 34262 EAST AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11587143 -73.40766907 null null REPLACE null Set 50' class 1 pole (JO) / Abdn. 45' pole.Replace 3PH 1/0 ACSR TW & 1/0 ACSR N to pole 12029.Attach Neut. & DDE Neut. at 130".Inst. (1) 18M nonins. span guy at 136", run to pole 21282 & inst. at existing height.Transfer street light. Set 55' class 1 pole (JO) / Abdn. 50' class 1 pole.Cut & kick at phones request.Replace vertical construction with x-arm.Attach Sec. at 157".Attach Neut. at 163".
  6. Page 15 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 15 of 39 Category ConversationID CONNECTICUT LIGHT&POWER New or Replace Poles 1675669 CONNECTICUT LIGHT&POWER New or Replace Poles 1675669 Frontier Application Fees $9,775.00 $9,775.00 CL&P Application Fees $150.00 $150.00 CL&P Survery Fees $9,625.00 $9,625.00 Make-Ready Estimate Amount $103,096.23 $103,096.23 True-Up Cost ConversationCurrentStatus PermittingCompany ApplicationSubmitted SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo StreetAddress Town OwnerName Custodian Latitude Longitude AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason Make-Ready Overdue Precision Valley Communications 4/11/2024 6/26/2024 1711790 Complete 4247591 30282 BUCKINGHAM PL Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.1163826 -73.40367889 null null REPLACE null PoleComment Set 35' class 2 pole (JO) / Abdn. 30' class 5 pole.Attach DE Sec. at 52". Inst. (1) 14M non-ins. anc. guy opposite DE Sec., attach to 8'L DE anc. null Set 40' class 2 pole (JO) / Abdn. 35' class 3 pole.Attach Sec. at 82" & pull slack in DDE Sec. to poles 27485 & 16188.Inst. (2) 18M ins. anc. guys at 22", attach (1) new DE anc. L8' & (1) to new DE anc. L11'.Inst. (2) 18M nonins. anc. guys at 82", attach (1) new DE anc. L8' & (1) to new DE anc. L11'. Make-Ready Overdue Precision Valley Communications 4/11/2024 6/26/2024 1711790 Complete 4242049 16187 SHERMAN CT Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11686325 -73.40583038 null null REPLACE PowerSurveyAttachmentComment Billable Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles 1675669 $9,775.00 $150.00 $9,625.00 $103,096.23 Make-Ready Overdue Precision Valley Communications 4/11/2024 6/26/2024 1711790 Complete 4247238 34263 EAST AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11557007 -73.4076004 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1675669 $9,775.00 $150.00 $9,625.00 $103,096.23 Make-Ready Overdue Precision Valley Communications 4/11/2024 6/26/2024 1711790 Complete 4241331 34266 EAST AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.11474991 -73.40756989 null null REPLACE null Set 50' class 1 pole (JO) / Abdn. 45' class 3 pole.Attach DE Neut. & (2) DE Sec. at 136". Transfer street light. Set 50' class 1 pole (JO) / Abdn. 45' class 2 pole. Attach Sec. at 136".Replace 600A bypass switches.Transfer 3PH recloser & control box.Transfer street light. Existing Attachment auto-added. Y null ES inst 45' class 2 pole (JO) / Abdn 40' class 4.Pole in grass.Attach (2) 1PH taps at 42".Attach new Sec. & Sec./Neut. taps at 109".Attach other ins. end of span guy at 58", ran from pole 2987. Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in grass.Attach Sec. DE at 82".Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in sidewalk.Attach DE Sec. at 82".1/0 ACSR Neut. to be installed between poles 3257 & 2981 on non-reimb. WO 20881464 of this survey. Remove pole top Neut. hardware, #4 Neut. cable to be removed along William St on nonreimb. WO 20881464 of this survey.Remove guy/anc.Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in sidewalk.Attach Sec. at 82".Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 40' class 1 pole (JO) / Abdn 35' class 4.Pole in sidewalk.Attach Sec. at 82".Transfer streetlight,cutout & xfrmr (zap shield installed).Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Cut and kick for risers, pole in sidewalk.Inst. (1) anc. at a lead of 9' for corner bisector.Attach Sec. DE at 82".1/0 TPX to be installed between poles 2987, 2988 & 2989 on nonreimb. WO 20881464 of this survey.Inst. (1) 14M ins. span guy at 70", run ins. end to pole 2988.Inst. (1) 14M ins. anc. guy at 22", attach to the 9' lead bisector anc..Extend/Replace Svc. riser for new pole height.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null Inst 45' class 2 pole (JO) / Abdn 35' class 4.Pole in grass strip, not in sidewalk.Inst. (2) anc. at leads of 7' & 11' for corner bisector.Attach Sec. at 109".Inst. (1) 18M ins. anc. guy at 22", attach to the 11' lead bisector anc..Inst. (1) 18M non-ins. anc. guy at 109", attach to the 11' lead bisector anc..Transfer cutout & xfrmr (zap shield installed).Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null Inst 45' class 1 pole (JO) / Abdn 35' class 4 pole.Pole in grass, anc. in sidewalk.Inst. (1) sidewalk style anc. at a lead of 6' for corner bisector (set close to stonewall).Attach Sec./Neut. at 109".1/0 TPX to be installed and 1/0 Neut. & #2 TPX replaced for midspan Svc between poles 3255 & 3254 on non-reimb. WO 20881464 of this surveyInst. (1) 18M ins. sidewalk anc. guy at 22", attach to the 6' lead bisector anc.Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 45' class 2 pole (JO) / Abdn 35' class 4.Pole in grass strip, not in sidewalk.Inst. (1) anc. at a lead of 10' for corner bisector.Attach Sec. at 109".Inst. (1) 14M ins. anc. guy at 22", attach to the 10' lead bisector anc.Inst. zap shield.Transfer streetlight, cutout & xfrmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1676174 1676174 1676174 1676174 1676174 1676174 1676174 1676174 1676174 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $195,634.86 $195,634.86 $195,634.86 $195,634.86 $195,634.86 $195,634.86 $195,634.86 $195,634.86 $195,634.86 Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 1711983 1711983 1711983 1711983 1711983 1711983 1711983 1711983 1711983 Complete Complete Complete Complete Complete Complete Complete Complete Complete 4244409 4241322 4244067 4255238 4243867 4250994 4243464 4240645 4244023 2988 2989 2981 2982 2983 2987 3253 3255 3256 WILLIAM ST WILLIAM ST WILLIAM ST WILLIAM ST WILLIAM ST WILLIAM ST STRAWBERRY HILL AVE STRAWBERRY HILL AVE STRAWBERRY HILL AVE Norwalk Norwalk Norwalk Norwalk Norwalk Norwalk Norwalk Norwalk Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.11441422 -73.39539337 41.11457443 -73.39484406 41.11389542 -73.39789581 41.11391068 -73.39759064 41.11392212 -73.39700317 41.11412048 -73.39569855 41.11232376 -73.39847565 41.11312485 -73.39862823 41.11341476 -73.39854431 null null null null null null null null null null null null null null null null null null REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE
  7. Page 16 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 16 of 39 Category CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles ConversationID 1676174 1676174 1676174 1676174 1676174 1676174 1676174 1698859 1698859 1700733 1706093 Frontier Application Fees $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 $9,775.00 CL&P Application Fees $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 CL&P Survery Fees $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $9,625.00 $9,625.00 $9,625.00 $9,875.00 Make-Ready Estimate Amount $195,634.86 $195,634.86 $195,634.86 $195,634.86 $195,634.86 $195,634.86 $195,634.86 $8,386.26 $8,386.26 $2,674.36 $7,621.77 True-Up Cost ConversationCurrentStatus Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Make-Ready Make-Ready Make-Ready Awaiting MR Payment PermittingCompany Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications ApplicationSubmitted 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 5/23/2024 5/23/2024 5/28/2024 6/17/2024 SurveyStart 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 7/30/2024 7/30/2024 7/31/2024 8/1/2024 PowerSurvey 1711983 1711983 1711983 1711983 1711983 1711983 1711983 1727384 1727384 1727914 1728455 PowerSurveyStatus Complete Complete Complete Complete Complete Complete Complete Complete Complete Complete Complete PoleID 4244388 4244408 4241341 4856397 4243062 4246543 4243801 4251861 4255649 4262970 4241576 PoleNo 3258 3260 3262 3244 17234 17235 8991 10562 391 7552 6373 StreetAddress STRAWBERRY HILL AVE STRAWBERRY HILL AVE STRAWBERRY HILL AVE STRAWBERRY HILL AVE MACINTOSH RD MACINTOSH RD CHELENE RD SKY TOP RD SPRUCE DR SYCAMORE DR BLUEWATER HL Town Norwalk Norwalk Norwalk Norwalk Norwalk Norwalk Norwalk Westport Westport Westport Westport OwnerName CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER Custodian CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Latitude Longitude 41.11420441 -73.39815521 41.11440277 -73.39805603 41.11489105 -73.39780426 41.11022568 -73.39829254 41.11325073 -73.39957428 41.11375427 -73.39958954 41.1128006 41.1379776 41.13857651 -73.40090179 -73.35134888 -73.3527298 41.15632248 -73.31406403 41.11014938 -73.34988403 AttachmentWorkType null null null null null null null null null MAKE-READY null AttachmentMRAction null null null null null null null null null Other null PoleWorkType REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE null REPLACE PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable null Inst 45' class 2 pole (JO) / Abdn 35' class 4.Pole in grass.Attach Sec. at 109".Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 45' class 2 pole (JO) / Abdn 40' class 2.Inst. (1) anc. at a lead of 14' for DE.Pole & anc. in grass.Attach Sec. at 109".Inst. (1) 14M ins. span guy at 97", run to pole 3261 (attach ins. end at existing location at pole 3261).Inst. (1) 18M non-ins. anc. guy at 97", attach to the 14' lead DE anc.Inst. zap shield.Transfer cutout & xfrmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 45' class 2 pole (JO) / Abdn 40' class 3.Pole in grass strip, not in sidewalk.Attach Sec. at 109".Transfer cutout & xfrmr (zap shield installed).Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES Inst 45' class 2 pole (JO) / Abdn 35' class 4.Pole in grass strip, not in sidewalk.Inst. (1) anc. at a lead of 9' for corner bisector (Comm. use).Attach Sec. DE at 109".Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES Inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in grass strip, not in sidewalk.Inst. (1) anc. at a lead of 13' for corner bisector.Transfer 3 spool rack so bottom-most part of rack is at 82".Bring down x-arm Neut, attach at 6" above 3 spool rack.Inst. (1) 14M ins. anc. guy at 22", attach to the 13' lead bisector anc..Inst. 14M non-ins. span guy at 2" below bottom of 3 spool rack, run to pole 17235.Inst. cutout & zap shield.Transfer streetlight & xfmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment (5' step rule). Existing Attachment auto-added. Y null ES inst 45' class 2 pole (JO) / Abdn 40' class 2.Pole in grass.Inst. (1) anc. at a lead of 16' for DE.Attach Neut./Sec. DDE at 97".Attach other end of span guy at 109", ran from pole 17234.Inst. (1) 14M ins. anc. guy at 22", attach to the 16' lead DE anc..Inst. (1) 14M nonins. anc. guy at 109", attach to the 16' lead DE anc..Inst. cutout & zap shield.Transfer streetlight & xfmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in grass, behind sidewalk.Inst. (1) anc. at a lead of 9' for corner bisector.Attach Sec. at 82".Inst. (1) 14M ins. anc. guy at 22", attach to the 9' lead bisector anc..Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Inst. (1) anc. at a lead of 12' for DE.Attach Sec. Des at 50"/52".Inst. (1) 14M ins. span guy at 40", run to pole 10561 (attach ins. end at 22" at pole 10561).Inst. (1) 14M nonins. anc. guy at 52", attach to the 12' lead DE anc..Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Inst. (1) anc. at a lead of 12' for corner bisector.Attach Sec. at 82".Inst. (1) 14M ins. anc. guy at 22", attach to the 12' lead bisector anc..Trim near pole to perform work.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null null Replace 14M primary down guy and install 14M secondary down guy to new ES-set 1"TT anchor LL=15', P=DE; Install 1"TT anchor for new FTR down guy LL=12' Y null ES Inst 40' class 2 pole (JO) / Abdn 35' class 4 pole.Cut and kick for power/Comm. risers.Inst. (1) anc. at a lead of 10' for DE (West).Inst. (1) anc. at a lead of 10' for DE (South).Attach Sec. at 80"/82".Inst. (1) 18M ins. anc. guy at 22", attach to the 10' lead DE (West) anc..Inst. (1) 18M ins. anc. guy at 24", attach to the 10' lead DE (West) anc..Replace Sec. riser for new pole height, replace UG Sec. to handhole 6373A near base of pole. Transfer street light.Note: Pole replaced due to Comm. midspan clearance with new attachment. Existing Attachment auto-added. Y
  8. Page 17 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 17 of 39 Category ConversationID Frontier Application Fees CL&P Application Fees CL&P Survery Fees Make-Ready Estimate Amount CONNECTICUT LIGHT&POWER New or Replace Poles 1625388 $9,650.00 $150.00 $9,500.00 $3,617.20 CONNECTICUT LIGHT&POWER New or Replace Poles 1631137 $9,650.00 $150.00 $9,500.00 $159,227.21 CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1648555 1675706 1675706 $9,650.00 $9,650.00 $9,650.00 $150.00 $150.00 $150.00 $9,500.00 $9,500.00 $9,500.00 True-Up Cost -$2,143.60 $6,559.03 ConversationCurrentStatus SurveyStart PowerSurvey PowerSurveyStatus PoleID PoleNo StreetAddress Town OwnerName Custodian Latitude Longitude AttachmentWorkType AttachmentMRAction PoleWorkType PoleWorkReason PoleComment 4859463 14236 BAYNE ST Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.15570068 -73.41729736 null null REPLACE null Make-Ready Overdue Precision Valley Communications 1/3/2024 2/1/2024 1646960 Complete 4239714 32370 RICHARDS AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.10253143 -73.45147705 null null REPLACE null null ES set 35' class 2 pole (JO) / Abdn. 30' pole.Cut and kick for risers.Inst. (1) anc at a lead of 6' for DE.Attach DE Sec. at 52". Inst. (1) 18M non-ins. anc. guy at 52", attach to the 6' lead DE anc..Replace/extend svc riser for new pole height.Note: Pole replaced at phone’s request due to midspan clearance with new attachment. Existing Attachment auto-added. Y null Set 45' class 2 pole (JO) / Abdn. 40' class 3 pole.Inst. (1) anc. at a lead of 8' for DE.Attach Sec./Neut. at 109".Inst. (1) 18M ins. anc. guy at 46", attach to 8' lead DE anc..Transfer cutout & street light.Note: Pole replaced at phones request, due to comms clearances in midspan with new attacher. Existing Attachment auto-added. Y null Set 45' class 1 pole (JO) / Abdn. 40' class 4 pole.Cut & kick for service riser.Attach 1PH DE 30".Attach Neut./Sec. & Neut./Sec. taps at 101".Attach DE Sec. at 109" (to pole 34165).Inst. (1) 14M ins. span. guy at 46", run to pole 31949 (attach at existing location at pole 31949).Extend service riser for new pole height.Transfer street light.Note: Pole replaced at phones request, due to comms clearances in midspan with new attacher. Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y Y Awaiting MR Payment Precision Valley Communications Precision Valley Communications Precision Valley Communications 2/8/2024 4/11/2024 4/11/2024 3/7/2024 6/26/2024 6/26/2024 1662261 1711955 1711955 Complete Complete Complete 4274585 4245830 4257365 7787 31951 31948 CHEESE SPRING RD BARBARA DR BARBARA DR Wilton Norwalk Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.20140457 -73.45485687 41.11833954 -73.39879608 41.11893845 -73.39884186 null null null null null null REPLACE REPLACE REPLACE $9,500.00 $23,116.96 Awaiting MR Payment Precision Valley Communications 4/11/2024 6/26/2024 1711955 Complete 4244127 5032 BARBARA DR Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12084961 -73.39897919 null null REPLACE null CONNECTICUT LIGHT&POWER New or Replace Poles 1675706 $9,650.00 $150.00 $9,500.00 $23,116.96 Awaiting MR Payment Precision Valley Communications 4/11/2024 6/26/2024 1711955 Complete 4243573 5550 JOHNSON RD Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.12016296 -73.39749146 null null REPLACE null null Inst 50' class 2 pole (E5) / Abdn 45' class 2 pole.Cut & kick for pri riser.Inst. (1) anc. at lead of 20' for Pri (unbalance) & span guy DE. Set anc. behind pole line/lines going to pole 22708, not inline with DEs.Attach Neut. at 163".Inst. (2) 14M ins. anc. guys at 15" & 16", attach both to the 20' lead DE anc..Inst. (1) 14M non-ins. anc. guy at 151", attach to the 20' lead DE anc..Inst. (1) 14M ins. span guy at 22”, run to pole 22709-S, attach at existing location at pole 22709-S.Inst. (1) 14M non-ins. span guy at 151”, run to pole 26811, run to pole 26811.Replace 3PH Pri. riser equipment, extend for new pole height. $91,613.29 Y Complete $150.00 $9,250.00 Existing Attachment auto-added. 1646909 $9,650.00 $150.00 Y 2/1/2024 1675706 $9,525.00 Existing Attachment auto-added. 12/19/2023 CONNECTICUT LIGHT&POWER New or Replace Poles 1595606 Billable Precision Valley Communications Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Sec. at 82".Inst. (1) 14M ins. span. guy at 22", run to pole 3574 (attach 6" below Sec. DE at pole 7574).Transfer street light.Note: Pole replaced at phones request, due to comms clearances in midspan with new attacher. Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Sec. at 82".Transfer street light.Note: Pole replaced at phones request, due to comms clearances in midspan with new attacher. CONNECTICUT LIGHT&POWER New or Replace Poles PowerSurveyAttachmentComment Make-Ready Overdue Awaiting MR Payment $23,116.96 ApplicationSubmitted Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Cut & kick pole for service riser.Inst. (1) anc. at a lead of 8' for corner/bisector.Attach DDE Sec. at 52".Replace service riser conduit/cable & extend to new pole height.Inst. (1) 14M non-ins. anc. guy opposite Sec. DE, attach to 8'L bisector anc. Set 45' class 1 pole (JO) / Abdn. 40' class 2 pole.Attach Sec. at 109".Transfer Xfrmr, Cutout & (2) streetlights.Inst. Zap shield. Make-Ready Overdue $23,116.96 PermittingCompany Make-Ready Overdue Precision Valley Communications 11/8/2023 11/27/2023 1620749 Complete 4285891 22709 NORWALK DANBURY RD Wilton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.18106079 -73.41637421 null null REPLACE CONNECTICUT LIGHT&POWER New or Replace Poles 1595606 $9,525.00 $150.00 $9,250.00 $91,613.29 Make-Ready Overdue Precision Valley Communications 11/8/2023 11/27/2023 1620749 Complete 4265396 26811 NORWALK DANBURY RD Wilton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.18074036 -73.41619873 null null REPLACE null Inst 45' class 2 pole (JO) / Abdn 40' class 3 pole.Cut & kick for service riser.Attach TPX at 101" & QPX at 109".Attach other end of span guy at 109", ran from pole 22709.Replace service. riser conduit/cable, extend for new pole height.Transfer xfrmr (inst. zap shield) & cutout. CONNECTICUT LIGHT&POWER Make-Ready Attachments 1595606 $9,525.00 $150.00 $9,250.00 $91,613.29 Make-Ready Overdue Precision Valley Communications 11/8/2023 11/27/2023 1620749 Complete 4267094 22754 NORWALK DANBURY RD Wilton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.16743851 -73.41698456 MAKE-READY Shift Raise null null null Existing Attachment auto-added. Raise 3PH X-arm Pri. 71". Raise Sec. 43". Extend 3PH riser with 48”FG bracket up to Sec. Raise street light 44". Transfer cutouts & arresters. Y Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1595606 $9,525.00 $150.00 $9,250.00 $91,613.29 Make-Ready Overdue Precision Valley Communications 11/8/2023 11/27/2023 1620749 Complete 4282914 22755 NORWALK DANBURY RD Wilton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.16719055 -73.417099 MAKE-READY Shift Raise null null null Raise 3PH X-arm Pri. 97". Raise 1PH tap Pri. 87". Raise Sec. & DE Neut. 64". Replace cutout & install arrester. CONNECTICUT LIGHT&POWER Make-Ready Attachments 1595606 $9,525.00 $150.00 $9,250.00 $91,613.29 Make-Ready Overdue Precision Valley Communications 11/8/2023 11/27/2023 1620749 Complete 4859981 22757 NORWALK DANBURY RD Wilton CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.16661072 -73.41738129 MAKE-READY Shift Raise null null null Raise Sec. 18". Y null Inst 50' class 1 pole (JO) / Abdn 45' class 1 pole.Pole in grass.Inst. (1) anc. at a lead of 13' for DE.Maintain slack span of Pri. wires to pole 10976.Attach under build x-arm top bolt at 76".Attach Sec. at 136".Inst. (1) 18M ins. anc. guy at 15", attach to the DE anc.Transfer street light. Existing Attachment auto-added. Y null Replace secondary down guy with 14M to new FTR-set 1"TT anchor LL=12', P=DE Y CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER Make-Ready Attachments 1617178 1633454 $9,525.00 $9,525.00 $150.00 $150.00 $9,375.00 $9,375.00 $15,235.50 $7,776.25 $8,686.06 Make-Ready Overdue Make-Ready Overdue Precision Valley Communications Precision Valley Communications 11/30/2023 1/3/2024 1/2/2024 2/19/2024 1633628 1653995 Complete Complete 4259452 4858985 20158 8220 NEWTOWN AVE ARGENTINE WAY Norwalk CONNECTICUT LIGHT&POWER/FRONTIER Norwalk FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER FRONTIER 41.13460448 -73.40065452 41.14744186 -73.4471817 null MAKE-READY null Other REPLACE null null
  9. Page 18 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 18 of 39 Category CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles ConversationID 1631436 1631436 Frontier Application Fees $9,525.00 $9,525.00 CL&P Application Fees $150.00 $150.00 CL&P Survery Fees $9,375.00 $9,375.00 Make-Ready Estimate Amount $128,059.28 $128,059.28 True-Up Cost ConversationCurrentStatus Awaiting MR Payment Awaiting MR Payment PermittingCompany Precision Valley Communications Precision Valley Communications ApplicationSubmitted 1/3/2024 1/3/2024 SurveyStart 2/1/2024 2/1/2024 PowerSurvey 1646962 1646962 PowerSurveyStatus Complete Complete PoleID 4245045 4247661 PoleNo 3087 5697 StreetAddress FILLOW ST FILLOW ST Town Norwalk Norwalk OwnerName CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER Custodian CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Latitude Longitude 41.11817169 -73.43856812 41.11768341 -73.4380188 AttachmentWorkType null null AttachmentMRAction null null PoleWorkType REPLACE REPLACE PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable null ES set 45' class 1 pole (JO) / Abdn. 40/3 pole.Cut and kick due to other risers/underground facilities.Inst. (1) anc. at a lead of 6' for corner bisector (Fillow St).Inst. (1) anc. at a lead of 10' for DE, set behind pole line to pole 3089 (not closer to road).Attach 1PH tap at 42" & 3PH tap x-arm top bolt at 42". Attach Neut./Neut. taps at 103". Attach DE Sec. at 109". Inst. (1) 18M ins. anc. guy at 22", attach to the 6' lead bisector anc..Inst. (1) 18M nonins. anc. guy at 109", attach to the 10' lead DE anc..Inst. (1) 14M ins. span guy at 50", run to pole 3089 (attach at existing location at pole 3089).Transfer streetlight.Notes: Pole replaced at phone’s request due to midspan clearance with new attachment. Existing Attachment auto-added. Y null ES set 45' class 1 pole (JO) / Abdn. 35' pole.Inst. (2) anc.s at leads of 22' & 18' for corner bisector.Attach Sec. DDE at 109". Inst. (1) 14M ins. anc. guy at 22", attach to the 22' lead bisector anc..Inst. (1) 14M non-ins. anc. guy at 103"", attach to the 22' lead bisector anc..Inst. cutout & zap shied.Transfer xfrmr & streetlightNotes: Pole replaced at phone’s request due to midspan clearance with new attachment. Existing Attachment auto-added. Y Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1635233 $9,525.00 $150.00 $9,125.00 $101,380.37 Awaiting MR Payment Precision Valley Communications 1/8/2024 2/26/2024 1657161 Complete 4246299 22729 CONNECTICUT AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.09938431 -73.44206238 MAKE-READY Shift Raise null null null Raise bottom 3PH tap x-arm 12”. Raise TPX/Neut. tap/Sec. tap 20”& bring TPX Sec. to roadside of pole. Remove QPX Sec. to pole 22728. Raise top AC (tangent) 30”. Raise both of the bottom (2) DEs each 24". Raise streetlight 28”. Inst. (2) 18M non-ins. anc. guys with (1) opposite bottom-most AC DE and other (1) 12" above that guy, replacing existing AC guying, attach to existing DE anc.. CONNECTICUT LIGHT&POWER Make-Ready Attachments 1635233 $9,525.00 $150.00 $9,125.00 $101,380.37 Awaiting MR Payment Precision Valley Communications 1/8/2024 2/26/2024 1657161 Complete 4238950 22726 CONNECTICUT AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.09873962 -73.44300079 MAKE-READY Shift Raise null null null Raise Neut./Sec. tap 22" Raise Sec. DE 22". Raise streetlight 12" Y null Remove 2-25kVA xfrmrs and their cutouts of 3PH xfrmr bank & its cluster mount. For remaining 1-25kVA xfrmr, place above to be raised Sec.. (existing zap shield & cutout installed). Raise Sec./Sec. tap 12". Complete removal of QPX from pole 22729. Raise AC 12". Raise streetlight 12". Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1635233 $9,525.00 $150.00 $9,125.00 $101,380.37 Awaiting MR Payment Precision Valley Communications 1/8/2024 2/26/2024 1657161 Complete 4241816 22728 CONNECTICUT AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.09912872 -73.44242859 MAKE-READY Shift Raise null null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1635233 $9,525.00 $150.00 $9,125.00 $101,380.37 Awaiting MR Payment Precision Valley Communications 1/8/2024 2/26/2024 1657161 Complete 4238714 29550 CONNECTICUT AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.09882736 -73.44285584 MAKE-READY Shift Raise null null DOUBLE POLE CONNECTICUT LIGHT&POWER Make-Ready Attachments 1635233 $9,525.00 $150.00 $9,125.00 $101,380.37 Awaiting MR Payment Precision Valley Communications 1/8/2024 2/26/2024 1657161 Complete 4245988 23324 CONNECTICUT AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.09851837 -73.44330597 MAKE-READY Shift Raise null null null Raise Sec 22". Extend 3PH Pri. riser cable & conduit, rebuild terminator FG bracket for Sec. raise. Raise Pri 48". Raise Xfrmr bank 32". Raise QPX/Neut. 29". Raise TPX DE 29". Raise streetlights 30". Transfer (1) streetlight & (2) area lights. DOUBLE POLE. Raise top Pri to top of pole. Raise 3PH Pri tap 34". Raise Sec./Neut./Sec. tap 22”. Extend Svc riser up to raise to Sec. level. Raise streetlight 22”. Note: Cutouts at pole 9500, not 23323. Y null null Raise Sec./Sec. tap 18". Pull slack in Sec. to pole 27217. Raise (1) streetlight & (1) area light 20". Y null ES inst 50' class 2 (JO) / Abdn 45' class 3.Cut & kick pole for risers, pole in grass.Inst. (1) sidewalk style anc. at a lead of 10' for corner bisector.Attach Sec. at 136".Inst. (1) 18M ins. sidewalk anc. guy at 22", attach to the 10' lead sidewalk anc..Replace/Extend 3PH Pri. riser for new pole height.Transfer cutouts, (1) streetlight & (1) area light.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 50' class 2 (JO) / Abdn 45' class 3.Cut & kick pole for risers, pole in grass.Inst. (1) sidewalk style anc. at a lead of 10' for corner bisector.Attach Sec. at 136".Inst. (1) 18M ins. sidewalk anc. guy at 22", attach to the 10' lead sidewalk anc..Replace/Extend 3PH Pri. riser for new pole height.Transfer cutouts, (1) streetlight & (1) area light.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 50' class 2 (JO) / Abdn 45' class 2.Cut & kick pole for risers, pole in grass.Attach Sec. at 136".Replace/Extend 3PH Pri. riser for new pole height.Transfer cutouts, (1) streetlight & (1) area light.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst 50' class 2 (JO) / Abdn 45' class 2.Cut & kick pole for risers, pole in grass.Attach Sec. at 136".Replace/Extend 3PH Pri. riser for new pole height.Transfer cutouts, (1) streetlight & (1) area light.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER Make-Ready Attachments CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1635233 1635233 1635233 1635233 1635233 1635233 $9,525.00 $9,525.00 $9,525.00 $9,525.00 $9,525.00 $9,525.00 $150.00 $150.00 $150.00 $150.00 $150.00 $150.00 $9,125.00 $9,125.00 $9,125.00 $9,125.00 $9,125.00 $9,125.00 $101,380.37 $101,380.37 $101,380.37 $101,380.37 $101,380.37 $101,380.37 Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Awaiting MR Payment Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications Precision Valley Communications 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 1657161 1657161 1657161 1657161 1657161 1657161 Complete Complete Complete Complete Complete Complete 4245649 4240540 4234446 4234446 4855738 4855738 23323 23239 23240 23240 23241 23241 CONNECTICUT AVE CONNECTICUT AVE CONNECTICUT AVE CONNECTICUT AVE CONNECTICUT AVE CONNECTICUT AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER Norwalk Norwalk Norwalk Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.09826279 -73.44368744 41.09627151 -73.44682312 41.09642792 -73.44655609 41.09642792 -73.44655609 41.09665298 -73.44618988 41.09665298 -73.44618988 MAKE-READY MAKE-READY null null null null Shift Raise Shift Raise null null null null null null REPLACE REPLACE REPLACE REPLACE null Y Y
  10. Page 19 of 39

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-057 Attachment 1 Page 19 of 39 Category CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles ConversationID 1635233 1635233 Frontier Application Fees $9,525.00 $9,525.00 CL&P Application Fees $150.00 $150.00 CL&P Survery Fees $9,125.00 $9,125.00 Make-Ready Estimate Amount $101,380.37 $101,380.37 True-Up Cost ConversationCurrentStatus Awaiting MR Payment Awaiting MR Payment PermittingCompany Precision Valley Communications Precision Valley Communications ApplicationSubmitted 1/8/2024 1/8/2024 SurveyStart 2/26/2024 2/26/2024 PowerSurvey 1657161 1657161 PowerSurveyStatus Complete Complete PoleID 4855761 4855761 PoleNo 23243 23243 StreetAddress CONNECTICUT AVE CONNECTICUT AVE Town Norwalk Norwalk OwnerName CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER Custodian CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER Latitude Longitude 41.09705353 -73.44554138 41.09705353 -73.44554138 AttachmentWorkType null null AttachmentMRAction null null PoleWorkType REPLACE REPLACE PoleWorkReason PoleComment PowerSurveyAttachmentComment Billable null ES inst. 50' class 2 (JO) / Abdn 45' class 4.Cut & kick pole for risers, pole in grass.Inst. (1) anc. at a lead of 19' for DE.Attach 1PH tap at 48" (39'-0"), inst. w/(2) susp. ins., place 1PH tap cutout on top x-arm, omit FG bracket.Attach TPX DE from pole 23242 & TPX DE to pole 9717 at 126".Attach QPX DE from pole 23244 & QPX DE to pole 25522 at 134".Attach QPX DE tap to pole 9717 at 136".Inst. (1) 14M ins. anc. guy 64", attach to the 19' lead DE anc..Replace/Extend 3PH Pri. riser for new pole height, inst. (2) angle ins. to hold road phase and middle phase riser lead cables.Attach 3PH 48" FG equipment bracket at 90". Replace (4) cutouts 1-50K, 3-30K.Transfer (1) streetlight & (1) area light.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null ES inst. 50' class 2 (JO) / Abdn 45' class 4.Cut & kick pole for risers, pole in grass.Inst. (1) anc. at a lead of 19' for DE.Attach 1PH tap at 48" (39'-0"), inst. w/(2) susp. ins., place 1PH tap cutout on top x-arm, omit FG bracket.Attach TPX DE from pole 23242 & TPX DE to pole 9717 at 126".Attach QPX DE from pole 23244 & QPX DE to pole 25522 at 134".Attach QPX DE tap to pole 9717 at 136".Inst. (1) 14M ins. anc. guy 64", attach to the 19' lead DE anc..Replace/Extend 3PH Pri. riser for new pole height, inst. (2) angle ins. to hold road phase and middle phase riser lead cables.Attach 3PH 48" FG equipment bracket at 90". Replace (4) cutouts 1-50K, 3-30K.Transfer (1) streetlight & (1) area light.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. Existing Attachment auto-added. Y null Raise Sec./Sec. tap 24". Pull slack in Sec. to pole 23243 & in DE Sec. to pole 9506. Raise (1) streetlight & (2) area lights 36". Y CONNECTICUT LIGHT&POWER Make-Ready Attachments 1635233 $9,525.00 $150.00 $9,125.00 $101,380.37 Awaiting MR Payment Precision Valley Communications 1/8/2024 2/26/2024 1657161 Complete 4235091 23244 CONNECTICUT AVE Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.0973587 -73.44508362 MAKE-READY Shift Raise null null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1641313 $9,525.00 $150.00 $9,375.00 $7,271.25 Make-Ready Overdue Precision Valley Communications 1/25/2024 2/15/2024 1652986 Complete 4598702 3048 SLAB MEADOW RD Morris CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.69200897 -73.16360474 MAKE-READY Other null null CONNECTICUT LIGHT&POWER Make-Ready Attachments 1641334 $9,525.00 $150.00 $9,375.00 $16,069.00 Make-Ready Overdue Precision Valley Communications 1/25/2024 2/20/2024 1654156 Complete 4595050 301 THOMASTON RD Morris FRONTIER/CONNECTICUT LIGHT&POWER FRONTIER -73.17003632 MAKE-READY Other null null Replace primary down guy with 14M to new 1"TT anchor LL=16', P=24' Install secondary down guy with 14M to new FTR-set 1"TT anchor LL=9', P=DE; Shift service to pole; Attach #2 TPX onto the FTR TO PLACE 1" TER AT L=10 B=230 pole null Set 40' class 2 pole (JO) / Abdn. 30' class 4 pole.Cut & kick pole for service riser.Inst. (1) anc. at a lead of 12' for DE.Pull slack in DE Neut. to pole 20857, attach at 82"Inst. (1) 18M ins. anc. guy at 22", attach to 12' lead DE anc.Extend service riser for new pole height.Transfer cutout & Xfrmr (inst. zap shield).Note: Pole replaced at phones request, due to comms clearances in midspan. CONNECTICUT LIGHT&POWER New or Replace Poles 1647355 $9,525.00 $150.00 $9,375.00 $6,479.86 Awaiting MR Payment Precision Valley Communications 2/7/2024 3/7/2024 1662323 Complete 4274394 20803 MORIARITY DR Wilton CONNECTICUT LIGHT&POWER/FRONTIER FRONTIER 41.91870499 -71.86236572 MAKE-READY Other null null CONNECTICUT LIGHT&POWER 41.92139435 -71.87353516 null null REPLACE null null Remove: 30/4Install: 40/2Replace due to clearances at pole & over road; Attach secondary 82" from pole top; Replace secondary down guy with 14M to new ES-set 1"TT anchor LL=10', P=DE null ES Inst. 55' class 1 (E15) / Abdn 50' class 2.Attach top bolt of FG x-arm at 90".Attach bolt of 1PH tap at 113".Attach top bolt of bottom spacer cable bracket at 146".Attach Sec./Sec. tap at 228".Attach aerial cable at 244".Inst. (1) 78" FG ins. at 130", transfer existing tree guy to other end of FG ins..Transfer cutout, spare fuse holder & streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. CONNECTICUT LIGHT&POWER Make-Ready Attachments 1661718 $9,525.00 $150.00 $9,500.00 $3,994.49 Awaiting MR Payment Precision Valley Communications 3/12/2024 4/29/2024 1681647 Complete 4801704 2343-S FOX RD Putnam FRONTIER/CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER New or Replace Poles 1661718 $9,525.00 $150.00 $9,500.00 $3,994.49 Awaiting MR Payment Precision Valley Communications 3/12/2024 4/29/2024 1681647 Complete 4784742 1801 LIBERTY HWY Putnam CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles CONNECTICUT LIGHT&POWER New or Replace Poles 1671007 1675694 1675694 $9,525.00 $9,525.00 $9,525.00 $150.00 $150.00 $150.00 $9,375.00 $9,375.00 $9,375.00 $74,408.35 $4,224.88 $4,224.88 Awaiting MR Payment Make-Ready Overdue Make-Ready Overdue Precision Valley Communications Precision Valley Communications Precision Valley Communications 4/5/2024 4/11/2024 4/11/2024 6/26/2024 6/26/2024 6/26/2024 1712098 1711944 1711944 Complete Complete Complete 4855509 4856854 4245380 46032 28363 3229 FLAX HILL RD JACKSON DR GEORGE AVE Norwalk Norwalk Norwalk CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER/FRONTIER CONNECTICUT LIGHT&POWER 41.6838913 null CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER CONNECTICUT LIGHT&POWER 41.17853546 -73.46016693 41.09170914 -73.43808746 41.11733246 -73.40344238 41.11569977 -73.39953613 null null null null null null null null REPLACE REPLACE REPLACE REPLACE Y Y Existing Attachment auto-added. Y Replace secondary down guy with 14M to new FTR-set 1"TT anchor LL=10' , P=DE Y Existing Attachment auto-added. Y Existing Attachment auto-added. Y null Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Inst. (1) anc. at a lead of 11' for corner bisector.Attach Sec. at 82".Inst. (1) 14M ins. anc. guy at 22", attach to the 11' lead bisector anc..Inst. (1) 14M ins. span guy at 24", run to pole 10570 (attach at 18' from ground at pole 10570).Inst. cutout & zap shield.Transfer Xfrmr & street light.Note: Pole replaced at phones request, due to comms clearances in midspan for new attacher. Existing Attachment auto-added. Y null Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Sec. at 82".Note: Pole replaced at phones request, due to comms clearances in midspan for new attacher. Existing Attachment auto-added. Y

Text of NECTA-057 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of NECTA-060_Final.pdf

Extracted from the file · 1 page · 1,114 characters

Text of NECTA-060 Attachment 1.pdf

Extracted from the file · 15 pages · 67,516 characters

As listed on the current system

Question(s) Answered 45, 54, 57, 60 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026

This filing on the current system (opens in a new tab)