Interrogatory responses

Answers to questions 45, 54, 57, 60

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

Text of NECTA-057 Attachment 1.pdf

Extracted from the file · 39 pages · 452,743 characters

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 11 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | ALLEN AVE | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 6" raise sl 16" no existing clearance violation. shift up required to make space for new comm | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CENTENNIAL AVE | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 4" existing clearances met on pole. raise needed to fit new comm | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | ATTAWANHOOD TER | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 35/5Install: 35/2Replace due to overload on pole; Attach Secondary 52" from pole top; Replace Secondary Span Guy with 14M to P. 1333; Shift Service mid-span | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | NEPTUNE AVE | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise Secondary 56"; Shift Services mid-span | Y Non CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | HAMPSHIRE RD | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | TRANSFER | Transfer To New Pole | REPLACE | null | FTR TO REPLACE POLE WITH 40-1 PER EL REQUEST TRANSFER EXSTING POWER | FTR replace pole 40/1 | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | ELM ST | Danbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Install: 45/1Remove: 40/2Replace due to clearance issues; Cut and kick due to riser at pole/location of pole; Attach secondary 136" from pole top; Replace primary DG to ES set 1" TT anchor, LL=12', P=DE | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | DENVER TER | Danbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | DOUBLE POLE. | install down guy (nonbillable) raise sl 8" (billable) no existing NESC clearance violation. SL needs to be raised to fit new comm | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | FREMONT ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | PROSPECT AVE | Meriden | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 50/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | BALDWIN ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 12" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | CHAMBERLAIN HWY | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/2 due to insufficient room in comm space | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | DEERFIELD AVE | Middletown | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise sl 12" | Y
  2. Part 12 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | PARK ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 4" existing clearance 45" from sec to comms. comms needs extra shift up to fit new comm | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | PARK ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 16" existing clearance from comms to SL is 17" no existing NESC violation. SL needs to shift up to make space for new comm | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | GREEN RD | Manchester | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise streetlight 8" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | PARKER ST | Manchester | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 4" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | PARKER ST | Manchester | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary and streetlight 16" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | JOHNSON AVE | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | FTR TO REPLACE POLE WITH 45/2 DUE TO CLEARANCE OVER THE ROAD TRANSFER EXISTING POWER | raise secondary 16" and raise sl 12" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SURREY DR | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | JOHNSON AVE | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 12" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SPRUCE ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CYNROSE PL | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 28" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | W MAIN ST | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise sl 4" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | WOODSIDE ST | Burlington | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | dress drip loop | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | WESTSIDE BLVD | Burlington | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 35/2 due to clearance | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | STAFFORD RD | Burlington | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 35/2 due to clearance | Existing Attachment auto-added. | Y
  3. Part 13 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | E MAIN ST | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 60" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SUMMER ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/2 due to sec to comms clearance | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SUMMER PL | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 due to sec to comms clearance | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SPRING ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 due to comms to ground clearance | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | NEW HANOVER AVE | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 due to comms to ground clearance | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | ALCOVE ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 due to comms to ground clearance | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | SPRING ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise sl 24" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SUMMER ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 due to height difference | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | LANOUETTE ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 23" and raise sl 37" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | LANOUETTE ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/2 due to comms to ground clearance | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SOUTH ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/2 due to needing more spaceno existing NESC clearance violation. taller pole needed to fit new comm | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SOUTH ST | Bristol | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 5E due to needing more spaceno existing NESC clearance violation. taller pole needed to fit new comm | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | E MAIN ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 50/1 | Existing Attachment auto-added. | Y
  4. Part 14 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HALL AVE | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 30" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | S MAIN ST | Middletown | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 26" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | ENFIELD ST | Enfield | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 18" and raise xfmr 12" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | ENFIELD ST | Enfield | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 due to comms to ground clearance | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | HOLLISTER ST | Manchester | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/2 due to midspan clearanceno existing NESC clearance violation. more space is needed to fit new comm | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | OAKLAND HTS | Bethel | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 due to comm clearanceno pre-existing clearance issue. taller pole needed to fit new comm | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | OAKLAND HTS | Bethel | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 due to comm clearanceno pre-existing clearance issue. taller pole needed to fit new comm | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | SHERMAN AVE | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Transfer To New Pole | null | null | null | FTR replace pole 45/2 due to comms to ground clearance | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HICKS ST | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 17" raise SL 6" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SALTUS DR | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Install: 40/2Remove: 35/4Cut + Kick due to secondary risers; Replace due to load from comm attachment; Attach Secondary 82" from pole top; Transfer 50kVA XFMR, XFMR is fused, zap shield exists; Transfer (3) 3" Secondary Risers; Extend (3) 3" Secondary Risers 36" with 4" PVC Shield; Replace Primary Down Guy with 14M to existing anchor, LL-10' P-DE | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | MAIN ST | Old Saybrook | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | null | Install 14M Down Guy to new ES set 1" TT anchor, LL-8' P-DE | Y
  5. Part 15 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | ATLANTIC DR | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Abandon: 35/2Install: 40/1Replace due to pole overload; Attach sec 82" from pole top; Install 14M span guy to P.1521 backing secondary; Install 14M span guy to P.1534 backing primary; Transfer 25 kVA XFMR; Shft (2) SVC’s mid span | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | KNOLLWOOD DR | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Install: 45/1Abandon: 40/4Replace due to required facilities separation; Attach sec 136" from pole top; Replace prim tree guy with 14M down guy with new ES set 1"TT anchor LL=10', P=DE; Replace (2) C/O’s | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | KNOLLWOOD DR | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Install: 40/2Abandon: 35/5Replace due to 5' rule; Attach sec 82" from pole top; Replace prim down guy with 14M to new ES set 1"TT anchor LL=12', P=6' | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | NEPTUNE DR | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Install: 40/2Abandon: 35/4Replace due to 5' rule; Attach sec 82" from pole top; Replace prim down guy with 14M to new ES set 1"TT anchor L=15', P=10' | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | MAPLE AVE | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Abandon: 40/3Install: 45/1Replace due to cracks at pole base; Attach sec 136" from pole top; Replace stub guy with 18M to P.313-S; Transfer 25 kVA XFMR; Shft (1) SVC midspan | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | SEAGULL RD | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise secondary 16"; Shft (2) SVC’s mid span | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | OSPREY RD | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise secondary 11" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | OAKWOOD RD | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Extend 23'8" secondary riser with 4" PVC shield 12"; Re-sag secondary to P.2419 | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | OAKWOOD RD | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Install: 40/2Abandon: 35/5Replace due to required facilities seperation; Attach sec 82" from pole top; Cut & Kick; Transfer 50 kVA XFMR to new pole | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | 315-S | MAPLE AVE | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Abandon: 30/4Install: 35/2Replace due to change in P.324 to 45/1 and required 10' rule; Replace (2) primary DG with 14M to new ES 1" TT anchor set LL = 8', P = DE | Existing Attachment auto-added. | Y
  6. Part 16 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | MAPLE AVE | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Abandon: 40/3Install: 45/1Replace due to cracks at pole base; Replace stub guy with 14M backing primary to P.315-S; Attach sec 136" from pole top | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | MAPLE AVE | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise secondary 20" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | BOSTON POST RD | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES to set 45' class 1 pole (E5) / Remove 40' class 4 pole.Cut and kick pole for riser(s).Attach double tangent spacer cable brackets at 36".Attach Neut. at 130", attach Sec. DE at 136".Inst. cutouts & zap shield.Extend service riser conduit/cable for new pole height.Transfer xfrmr. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | ADAMS ST | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | LAUREL PARK | Enfield | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 due to comm spacingexisting clearances meet NESC but insufficient room to shift to make room for new comm | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | PIONEER CIR | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 18" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | WANGUM RD | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 35' class 2 pole (JO) / Abdn. 25' class 4 pole.Attach Sec. at 52" (slack span). | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | YOUNG RD | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Cut and kick for riser.Attach Sec. at 82".Replace Svc. riser for new pole height. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | INDIAN TRL | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach DE. Sec. at 82".Inst. (1) 14M non-ins. span guy at 82", run to pole 127 (attach 6" above Sec. at pole 127). | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HAMMOCK DOCK RD | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Extend Svc. Riser up to Svc. Level. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | OLD MAIL TRL | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach DE. Sec. at 82".Inst. (1) 14M non-ins. span guy at 82", run to pole 127 (attach 6" above Sec. at pole 127). | Existing Attachment auto-added. | Y
  7. Part 17 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | OLD MAIL TRL | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Inst. (1) anc. at a lead of 21 for DE'.Attach DE Sec. at 52".Attach other end of span guy at 40", ran from pole 470.Inst. (1) 14M non-ins. anc. guy at 52", attach to the 21' DE anc. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | ECKFORD AVE | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Extend Svc. Riser up to Svc. Level. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | HAMMOCK RD N | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. to set 45' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Sec. at 109".Transfer Xfrmr and cutout. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | HAMMOCK RD N | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. to set 45' class 1 pole (JO) / Abdn. 40' class 4 pole.Cut and kick for riser.Inst. 10" DE PISA at a lead of 16'.Inst. 18M ins. anc. guy at 46", attach to the 16' lead DE anc.Attach Sec./Sec. tap at 109".Inst. Arrester.Replace Svc. Riser for new pole height.Transfer cutout and street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Survey Overdue | NetSpeed LLC | Complete | LIBERTY ST | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 45' class 1 pole (JO) / Abdn. 35' class 4 pole.Cut and kick for riser.Inst. 10" bisector PISA at a lead of 22'.Inst. 18M ins. anc. guy at 5", attach to the 22' lead bisector anc.Attach Sec. at 109".Repl. Svc. Riser for new pole height.Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | FORBES ST | East Hartford | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 8" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CAMP ST | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 33" existing clearance between secondary and comms is 42" - no existing clearance violation shift needed to accommodate new attachment | Y Non CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | FOREST ST | East Hartford | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | TRANSFER | Transfer To New Pole | REPLACE | null | FTR TO REPLACE POLE WITH 45-1 DUE TO 5' RULE TRANSFER EXISITNG POWER | FTR replace pole 40/1 | Y Non CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | FOREST ST | East Hartford | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | null | null | REPLACE | null | FTR TO REPLACE POLE WITH 45-1 DUE TO 5' RULE TRANSFER EXISITNG POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | KOWAL DR | Cromwell | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Transfer To New Pole | null | null | null | FTR replace pole 40/2 | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | COOK AVE | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise sl 6" | Y
  8. Part 18 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | COOK AVE | Meriden | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | replace pole top with large corner raise sl 12" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | DANA DR | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 35/4Install: 40/2Replace due to new attachment & driveway clearance; Attach secondary 82" from pole top; Transfer 25C KVA XFMR; Fuse XFMR | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | WARD PL | Old Saybrook | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | FTR TO REPLACE EXISITNG ANCHOR WITH 1" TER AT B=355 L=12' | Due to new attachment causing loading issues, replace down guy with 14M to new FTR-set 1"TT anchor LL=15' , P=DE | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | COVE ST | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 30/5Install: 35/2Replace due to new attachment and increased loading; Attach secondary 18" from pole top; Replace 18M span guy to P.344; Replace down guy with 18M to new ES set 1"TT anchor LL=8' , P=DE | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | SHEFFIELD COVE RD | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | FTR TO REPLACE EXISITNG ANHOR WITH 1" TER L=18', B=227. FTR TREE TRIMMING REQUIRED (NON-BILLABLE) | Due to new attachment & increased loading, replace down guy with 14M to new FTR-set 1"TT anchor LL=9' , P=DE | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | MAIN ST | Old Saybrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 40/4Install: 45/1Replace due to clearances; Attach secondary 136" from pole top; Replace (1) 30K fuse; Replace primary span guy with 18M to P.1527; Install streetlight conduit | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | HAMMOCK RD | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Cut and kick for riser.Inst. 10" DE PISA with a lead of 12'.Inst. 18M ins. anc. guy at 22", attach to the 12' lead DE anc.Attach Sec. at 82".Repl (2) Svc. Riser for new pole height.Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CENTER RD | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Clean up drooping Sec. cables. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | SOUTH PKWY | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Clean up drooping Sec. cables. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | HAMMOCK RD | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 45' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Sec./Neut. At 109". | Existing Attachment auto-added. | Y
  9. Part 19 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | MIDDLE TPKE E | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 10" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | COOK ST | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 6" raise aerial cable 11" lower sl 2" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | MIDDLE TPKE E | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 19" and dress loop raise sl 6" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | MIDDLE TPKE E | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 28" | Y Non CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SHUNPIKE RD | Cromwell | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | TRANSFER | Transfer To New Pole | REPLACE | null | FTR TO REPLACE POLE WITH 45-1 PER EL REQUEST | FTR replace pole 45/2 | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | NEW STATE RD | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary, terminator and riser by 17" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HILLIARD ST | Manchester | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 10" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | C3360 | GREAT HILL RD | Seymour | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 10" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | ALLEN ST | Plymouth | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 28" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | W CENTER ST | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | 308-S | GLENWOOD RD | Clinton | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | LOWER COMM DROP FROM 15' TO 14'8" | Extend Svc. Riser up to Sec. level. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | GLENWOOD RD | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst. 35' class 2 pole (JO) / Abdn. 25' class 4 pole.Cut and kick for riser.Attach Sec. at 52".Customer to transfer/replace Svc. riser/meter. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | 319A | GLENWOOD RD | Clinton | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | LOWER COMM DROPS FROM 18'8" TO 18' & FROM 18' TO 17'8" | Clean up drooping Sec. cables. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | LIBERTY ST | Clinton | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | null | Clean up drooping Sec. cables. | Y
  10. Part 20 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | FAIRY DELL RD | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Extend Svc. Riser up to Sec. level. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | MAIN ST | East Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 40/4Install 45/1Replace due to comms request; Attach secondary 109" from pole top | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | LENOX ST | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 4" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HIGH ST | Clinton | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 20" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | BEACH ROAD EXT | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES to set 35' class 2 pole (JO) / Abandon 30' class 4 pole.Attach Sec. DE at 52". | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | BEACH ROAD EXT | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES to set 35' class 2 pole (JO) / Abandon 30' class 4 pole.Attach Sec. bracket & service at 52".Inst. cutouts and zap shields.Transfer xfrmr. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | WALNUT ST | Clinton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES to set 40' class 2 pole (JO) / Abandon 30' class 4 pole.Inst. (1) anc. at a lead of 10' for DE.Attach Sec. DE at 82", adjust midspan services.Inst. (1) 14M non-ins. anc. guy at 82, attach to 10' lead DE anc.. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SOUTH RD | Farmington | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 35/2 due to insufficient space on pole for new commno existing NESC violation present. taller pole needed for additional comm | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | ROBIN RD | Farmington | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 4" no existing NESC violation. comms need to shift up to fit new comm which in turn creates a need for SL need to be raised | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | GRISWOLD ST | Glastonbury | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | raise secondary 29" and sl 22" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | SUNSET RIDGE DR | East Hartford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CUSHMAN DR | Manchester | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | FTR TO PLACE 1" TER AT B=297 L=18' FTR TO ADD 10M DG AT 21'4" | raise SL 12" | Y

Text of NECTA-060_Final.pdf

Extracted from the file · 1 page · 1,114 characters

Text of NECTA-060 Attachment 1.pdf

Extracted from the file · 15 pages · 67,516 characters

As listed on the current system

Question(s) Answered 45, 54, 57, 60 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026

This filing on the current system (opens in a new tab)