Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 45, 54, 57, 60

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

Text of NECTA-057 Attachment 1.pdf

Extracted from the file · 39 pages · 452,743 characters

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 21 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | KENNEDY RD | Manchester | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 12" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | CUSHMAN DR | Manchester | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 12" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | PARKER ST | Manchester | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 12" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | BOSTON POST RD | Westbrook | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 50' class 1 pole (Sole) / Rmv. 45' class 2 pole.Inst. 10" DE PISA at a lead of 21'.Inst. 18M ins. Anc. Guy at 190", attach to 21' L DE anc.Attach bottom circuit at 100".Attach 1PH tap at 130".Attach Sec./Neut. Tap at 190".Replace (4) arresters.Transfer cutout and street. light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | BOSTON POST RD | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise Neut./Neut. Tap 24". | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | BOSTON POST RD | Westbrook | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 50' class 1 pole (Sole) / Rmv. 45' class 2 pole.Attach bottom circuit at 100".Attach 1PH tap at 130".Attach Sec./Sec. taps/Neut. Tap at 190".Replace arrester and cutout.Transfer flood light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | BOSTON POST RD | Westbrook | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise Sec./Neut. 10". Pull slack in Sec. to pole 440. Extend Sec. riser up to Sec. level. Inst. Zap shields.Raise Sec./Neut. 10". Pull slack in Sec. to pole 440. Extend Sec. riser up to Sec. level. Inst. Zap shields. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | BOSTON POST RD | Westbrook | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise Sec./Neut. 20". Raise street and flood lights 10". Inst. Zap shield. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | BOSTON POST RD | Westbrook | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise Sec./Neut. 13". Inst. Zap shield. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | CARTA LN | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Inst. 10" DE PISA at a lead of 5'.Inst. 18M non-ins. anc. guy at 52", attach to the 5' lead DE anc.Inst. 14M ins. span guy at 40", run to pole 209 (attach opposite of Pri. DE at pole 102).Attach Sec. at 52". | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | CARTA LN | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Cut and kick for riser.Inst. 10" DE PISA at a lead of 11'.Inst. 14M non-ins. anc. guy at 52", attach to the 11' lead DE anc.Attach Sec. at 52".Replace Sec. riser for new pole height. | Existing Attachment auto-added. | Y
  2. Part 22 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | ESSEX RD | Westbrook | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 40' class 2 pole (JO) / Abdn 35' class 4 pole.Pole in grass.Attach Sec. at 82".Inst. 16'L 10" PISA DE anchor at 352 degrees.Inst 18M ins. anc. guy at 82", attach to 16'L DE anc.Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | GLENN RD | East Hartford | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HOLLISTER DR | East Hartford | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 4" and dress loop | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | JEFFERSON LN | East Hartford | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | GRAHAM RD | East Hartford | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/1 | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | LEICHTNER DR | East Hartford | CONNECTICUT LIGHT&POWER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise SL 6" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | WILBUR CROSS PKWY | Meriden | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 6" existing clearances are met. shifting needed to make space for new comm | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | TOLLAND TPKE | Manchester | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise streetlight 17" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | TOLLAND TPKE | Manchester | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Street Light Bracket | null | null | null | raise streetlight 4" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | GRASSY PLAIN ST | Bethel | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | ES TO RAISE SEC & SL 18" | raise secondary and streetlight 18" no existing clearance violation. shift up needed to allow new comm | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | GRASSY PLAIN ST | Bethel | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | DOUBLE POLE | raise secondary and streetlight 10" no existing clearance violation. shift up needed to allow for new comms transfer | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | GRASSY PLAIN ST | Bethel | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | DOUBLE POLE - ES TO RAISE SEC TO 25'9 | raise secondary 12" no existing clearance violation. shift up need to allow transfer of new comm | Y
  3. Part 23 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | GRASSY PLAIN ST | Bethel | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 50/1 5E due to insufficient space on poleno existing clearance violation and cannot shift up. taller pole needed for new comm | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | LOCUST ST | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Street Light Bracket | null | null | null | raise sl 4" existing clearance between comms and sl is met. sl needs to be shifted up to make room for new comm | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | NEWFIELD ST | Middletown | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 45/2 due to comm spaceno nesc clearance issue. extra space needed in comm space | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | GrecoWolf Engineering | Complete | BLUE HILLS AVE | Bloomfield | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Neut. at 82".Replace ¼ mile arresters.Note: Pole replaced at phones request, due to comms clearances in midspan with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | GrecoWolf Engineering | Complete | BLUE HILLS AVE | Bloomfield | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 45' class 2 pole (JO) / Abdn. 40' class 4 pole.Cut & kick pole for Comms. riser.Attach Neut. at 109".Note: Pole replaced at phones request, due to comms clearances in midspan with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | NetSpeed LLC | Complete | CHESTNUT ST | Manchester | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES replace pole 40/2 due to insufficient spaceno existing NESC clearance issues. more space is needed to fit new comm | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | LAWN AVE | Middletown | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 27" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | NetSpeed LLC | Complete | HIGH ST | Middletown | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Shift Raise | null | null | null | raise secondary 26" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | NORTH AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst. 50' class 1 (T5) / Abdn 45' class 3.Pole behind sidewalk.Attach Sec. at 109".Inst. zap shields.Transfer cutouts, xfrmr bank & streetlight.Note: Pole replaced at phones request due to midspan clearance with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | NORTH AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst. 50' class 1 (T5) / Abdn 45' class 4.Attach Sec. at 109".Inst. (1) 14M ins. stub guy at 22", run to pole 20211-S, attach at existing location at pole 20211-S.Inst. zap shields.Transfer cutouts, xfrmr bank & streetlight.Note: Pole replaced at phones request due to midspan clearance with new attachment. | Existing Attachment auto-added. | Y
  4. Part 24 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | NORTH AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst. 45' class 2 / Abdn 40' class 4.Attach Sec./Sec. tap at 109".Note: Pole replaced at phones request due to midspan clearance with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | NORTH AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst, 50' class 1 (T5) / Abdn 45' class 4.Attach Sec. at 109".Inst. zap shield.Transfer cutout, xfrmr & streetlight.Note: Pole replaced at phones request due to midspan clearance with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 1 pole (JO) / Abdn. 40' pole.Cut & kick pole for comms. risers. Inst. (2) xarms & ridge pin at 7.5" for 3PH Pri. Attach Sec. at 109". Adjust SVC & xfer SVC. Inst. (1) 18M ins. anc. guy at 22", attach to new anc. Rmv. existing guy & 100% LTS anc. set in stone wall. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 2 pole (JO) / Abdn. 40' class 2 pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Attach Sec. & DE Sec. at 109". Xfer 50KVA xfmr w/ 6K cutout. Inst. zap shield. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 2 pole (JO) / Abdn. 35' pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Attach Sec. at 109". | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | GREEN ACRE LN | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 30' pole.Attach Sec. at 82". | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 1 pole (JO) / Abdn. 40' pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Inst. 1PH tap at 30". Xfer 40K cutout & 12KV arrester. Attach DE Neut. at 103".Attach Sec. at 109" & resag to pole 25739 & adjust SVC. Inst. (1) 18M ins. anc. guy at 22", attach to new anc. Rmv. existing guy & 100% LTS anc. Xfer street light & bracket. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 2 pole (JO) / Abdn. 40' class 2 pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Attach Sec. & DE Sec. at 109". Inst. SVC riser, replacing existing SVC riser. Break asphalt & cut & kick for riser replacement. Inst. (1) 18M non-ins. anc. guy at 109", attach to new DE sidewalk anc. Rmv. existing guy. Xfer 50KVA xfmr w/ 6K cutout. Inst. zap shield.Xfer SVC. | Existing Attachment auto-added. | Y
  5. Part 25 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 2 pole (JO) / Abdn. 35' class 4 pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri. Attach Sec. at 109" & adjust SVC & midspan SVC to pole 25742. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 1 pole (JO) / Abdn. 40' class 2 pole.Break asphalt, cut & kick, & hand-dig for pole replacement. Inst. xarm & ridge pin at 7.5" for 3PH Pri.Inst. 1PH tap at 30". Inst. 12KV arrester. Attach DE Neut. at 103". Attach Neut./Sec. & DE Sec. at 109". Inst. (1) 18M ins. anc. guy at 22", attach to new sidewalk anc. Inst. (1) 18M ins. span guy at 46", run to pole 25752 & inst. at 46". Xfer (1) SVC. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | POST RD E | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 45', Install: 45/1; Replace due to clearance issues; Attach neutral 109" from pole top; Replace (3) fuses; Install 18M primary down guy to new ES-set 1"TT anchor LL=8', P=DE | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Payments Received | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 2 pole (JO) / Abdn. 40' class 2 pole.Inst. xarm & ridge pin at 7.5" for 3PH Pri.Inst. 1PH tap at 30". Xfer 15K cutout & 12KV arrester. Attach DE Neut. at 103".Attach Sec. & DE Sec. at 109" & adjust SVC. Inst. SVC riser, replacing existing SVC riser. Cut & kick for riser replacement.Inst. (1) 14M ins. anc. guy at 46", attach to new anc. Xfer street light & bracket. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Payments Received | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 50' class 2 pole (JO) / Abdn. 40' class 3 pole.Inst. (2) xarms & ridge pin at 7.5" for med. cor. 3PH Pri.Attach Sec. at 136". Inst. SVC riser, replacing existing SVC riser. Cut & kick for riser replacement.Inst. (1) 14M ins. anc. guy at 22", attach to new anc. Rmv. existing guy. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Payments Received | Precision Valley Communications | Complete | HORSESHOE LN W | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 30' pole.Attach DE Sec. at 82". Inst. SVC riser, replacing existing SVC riser. Cut & kick for riser replacement.Inst. (1) 18M non-ins. anc. guy at 82", attach to new DE anc. Rmv. existing guy. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Payments Received | Precision Valley Communications | Complete | KEYSLER RD | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 35' class 5 pole.Attach DE 1PH Pri. at 5". Attach Sec. at 82" & adjust (2) SVCs. Inst. 14M ins. span guy at 22", run to pole 5825 & inst. at 12". Rmv. existing span guy. Xfer 50KVA xfmr w/ 6K cutout. Inst. zap shield. | Existing Attachment auto-added. | Y
  6. Part 26 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Payments Received | Precision Valley Communications | Complete | WAKEMAN PL | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 2 pole (JO) / Abdn. 40' class 2 pole.Attach lrg. cor. 1PH Pri at 5". Attach DDE Sec. at 109"Inst. SVC riser, replacing existing SVC riser. Cut & kick for riser replacement. Inst. (2) 18M non-ins. anc. guys at 109", attach (1) to each new DE anc. Rmv. (2) existing guys. Xfer 50KVA xfmr w/ 6K cutout. Inst. zap shield. Xfer SVC. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | POST RD E | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 50' class 1 pole (JO) / Abdn. 45' class 2 pole.Attach Neut. at 120" & Sec. at 136".Replace bypass switches (AWC preference for TR)..Transfer recloser & recloser control.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | DUDLEY RD | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Neut. at 82".Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | POST RD E | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Install: 50/1, Remove: 40/3; Replace due to comms need for additional clearances; Transfer 1200KVAR Capacitor Bank; Refer to DTR19.371 for cap bank installation details; Attach neutral 163" from pole top | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | POST RD E | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Install: 50/2, Remove: 40/2; Due to uplift from adjacent replacement; Transfer and fuse XFMR, install zap shield; Attach secondary 163" from pole top | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | POST RD E | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Install: 50/2, Remove: 40/3; Replace due to comms need for additional clearances; Cut & kick (primary riser); Refer to DTR12.251 for construction details; Stagger splices for maximum space under shield; Attach secondary 163" from pole top; Replace 18M span guy to P.30069 (P=DE at P.30069) | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | POST RD E | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Install: 50/2, Remove: 45/3; Replace due to comms need for additional clearances; Transfer and fuse XFMR, install zap shield; Attach secondary 163" from pole top, SVC exists midspan; Replace 14M primary span guy (backing messenger DE) to P.27171 | Existing Attachment auto-added. | Y
  7. Part 27 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | POST RD E | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Install: 50/2, Remove: 45/3; Replace due to comms need for additional clearances; Cut & kick (primary riser); Refer to DTR12.251 for construction details; Stagger splices for maximum space under shield; Splice through 1/0 QPX and attach tangent 163" from pole top, attach 1/0 TPX 147" from pole top | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Payments Received | Precision Valley Communications | Complete | HUNT CLUB LN | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Raise secondary 8" | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Payments Received | Precision Valley Communications | Complete | OLD ORCHARD RD | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 40/2Install: 45/2Replace due to FTR request; Attach secondary 109" from pole top | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 45/1 DUE TO COMM MIDSPAN CLEARANCE TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLC POLE WITH 45/1 DUE TO COMM CLEARANCE TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 45/1 C&K DUE TO 5' REPLACEMENT OF P.25788 TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | HEDGEROW LN | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 40-1 C&K DUE TO 5' RULE REPLACEMENT OF P.25788 TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 50/1 DUE TO COMM MIDSPAN CLEARANCE TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | COMPO RD S | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 45/2 DUE TO 5' RULE REPLACEMENT OF P.25788. TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Siena Engineering Group | Complete | C5187 | QUAKER FARMS RD | Oxford | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 1 pole (JO) / Abdn. 35' class 4 pole.Attach Neut./Sec. at 109".Transfer Xfrmr & cutout, inst. zap shield. | Existing Attachment auto-added. | Y
  8. Part 28 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | HAZEL ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 40/1' DUE TO MIDSPAN CLEARANCE ISSUES TRANSFER EXISTING POWERS | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | HARVARD ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ESTO REPLACE POLE WITH 40/1' DUE TO MIDSPAN CLEARANCE ISSUES TRANSFER EXISTING POWERS | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | CARLIN ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 40/1' DUE TO MIDSPAN CLEARANCE ISSUES TRANSFER EXISTING POWERS | null | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | HARVARD ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | EL TO REPLACE POLE WITH 40-1 TO AVOID P29934 REPLACEMENT TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | CREEPING HEMLOCK DR | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn 35' class 4 pole.Attach Sec. at 82".Inst. (1) 14M ins. span guy at 22", run to pole 18344 (attach at 12" above Sec. at pole 18344)Inst cutout and zap shield.Transfer Xrfmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | MAYFLOWER DR | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 30/5Install: 35/2Replace due to deflection caused by new attachment; Attach secondary 18" from pole top | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | SAUGATUCK AVE | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES to set 40' class 2 pole (JO) / Abdn 35' class 4.Pole in sidewalk, set new pole at least 18" behind curb face. Attach Sec. at 82".Inst. (1) 14M non-ins. span guy at 82", run to pole 26114 (attach at 6" above Sec. at pole 26114).Transfer streetlight.Notes:Pole replaced due to 5' step rule with adjacent billable replacement pole. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | SAUGATUCK AVE | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 45' class 1 pole (E5) / Abdn 40' class 4.Pole in sidewalk, set new pole at least 18" behind curb face. Inst. (2) anc.s at leads of 6' & 8' for corner bisector, place in proximity to existing anc. locations.Attach Sec. at 136".Inst. (1) 18M ins. anc. guy at 5", attach to the 8' lead bisector anc.Inst. (1) 18M non-ins. anc. guy at 136", attach to the 8' lead bisector anc.Transfer streetlight, cutout & xfrmr (inst. zap shield).Note: Pole replaced due to 5' step rule with adjacent billable replacement pole. | Existing Attachment auto-added. | Y
  9. Part 29 of 80

    CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | SAUGATUCK AVE | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 50' class 1 pole (JO) / Abdn 45' class 2Set new pole as close to stone retaining wall as feasible.Inst. (1) anc. at a lead of 8', place in proximity to existing power anc. location.Attach 3PH DE x-arm top bolt at 84", maintain slack span of Pri./Neut. cables to pole 27316.Attach (2) DE Neuts. at 134" (to poles 2749 & 27316). Attach Sec. DE at 136".Attach other end span guy at 136", ran from pole 26110.Inst. (1) 18M ins. anc. guy at 92", attach to the 8' lead DE anc.Inst. (1) 18M non-ins. anc. guy at 134", attach to the 8' lead DE anc.Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | SAUGATUCK AVE | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 45' class 1 pole (JO) / Abdn 40' class 4.Pole in grass strip, set new pole behind current location.Attach 1PH tap at 40".Attach Sec. DE at 107", attach Sec. tap at 109".Inst. (1) 14M non-ins. span guy at 107", run to pole 26111.Push brace bracket at 80".Transfer cutout & streetlight.Notes: Pole replaced due to 5' step rule with adjacent billable replacement pole. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | LOCUST LN | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 40' class 2 pole (JO) / Abdn 35' class 4.Inst. (1) anc. at a lead of 12' for DE.DDE Pri. & Neut., slack span all power cables to pole 25700.Inst. (1) 14M ins. anc guy at 22", attach to 12' lead DE anc..Attach Sec. at 82".Transfer cutout & xfrmr (zap shield already installed).Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | HILLSPOINT RD | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 2 pole (JO) / Abdn. 40' class 4 pole.Attach Sec. at 109".Transfer Xfrmr, inst. cutout & zap shield. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | HILLSPOINT RD | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 1 pole (JO) / Abdn. 40' class 4 pole.Attach 1PH tap at 30".Attach Sec. at 109". | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | SILWEN LN | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Inst. (2) anc.s at leads of 10' & 13' for bisector/corner & Pri. DE.Attach Sec. at 82".Inst. (1) 18M ins. anc. guy at 22", attach to 13'L DE anc.Inst. (1) 18M non-ins. anc. guy at 70", attach to 10'L bisector anc.Transfer xfrmr & cutout, zap shield already installed. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | WHITE OAK RD | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Replace primary pole top construction with A5 Large Corner; Replace primary down guy with 14M to existing anchor LL=14', P=41 | Y
  10. Part 30 of 80

    CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | WHITE OAK RD | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Replace primary pole top construction with A5 Large Corner; Replace primary down guy with 14M to existing anchor LL=11', P=29 | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | WHITE OAK RD | Norwalk | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | null | Replace primary down guy with 14M to existing anchor LL=10, P=DE | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | FILLOW ST | Norwalk | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | null | Raise secondary 29"; Raise streetlight 18"; Install streetlight conduit | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | SUNSET PASS | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 40/2Install: 40/1Replace due to defective pole tag, overload from new attachment; Attach secondary 82" from pole top; Transfer 25 KVA XFMR, XFMR is fused, zap shield exists; Replace primary down guy with 14M to existing anchor LL=6', P=19'; Service exists mid-span in field | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Payments Received | Precision Valley Communications | Complete | MOSS LEDGE RD | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 35/4Install: 40/2Cut+Kick due to secondary riser; Replace due to midspan clearness from the new attachment; Attach secondary 82'' from pole top; Transfer and extend 3'' Secondary riser with 4'' PVC to the secondary level; Replace (2) primary down guys with 14M to (2) new ES set 1'' TT anchors, LL1=11', LL2=13', P=DE | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | MYRTLE AVE | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 50-1 DUE TO COMM CLEARANCE ISSUES TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | MYRTLE AVE | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO RPLC W/ 50-1 C&K DUE TO CLRNC XFER EXIST PWR | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | IMPERIAL AVE | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 50/1 POLE DUE TO COMM MIDSPAN CLEARANCE TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | JESUP RD | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO RPLC W/ 45/1 DUE TO COMM CLRNC. XFER EXIST PWR. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | JESUP RD | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO RPLC W/ 45/2 DUE TO COMM CLRNC XFER EXIST PWR. | Existing Attachment auto-added. | Y

Text of NECTA-060_Final.pdf

Extracted from the file · 1 page · 1,114 characters

Text of NECTA-060 Attachment 1.pdf

Extracted from the file · 15 pages · 67,516 characters

As listed on the current system

Question(s) Answered 45, 54, 57, 60 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026

This filing on the current system (opens in a new tab)