Interrogatory responses
Answers to questions 45, 54, 57, 60
Files10
NECTA-045_Final.pdf
PDF · 87 KB · 1 pageText searchable
Download NECTA-045_Final.pdfRead the text of NECTA-045_Final.pdf
NECTA-045 Attachment 1 REDACTED.pdf
PDF · 200 KB · 2 pagesNo text in this file
NECTA-045 Attachment 2 REDACTED.pdf
PDF · 200 KB · 2 pagesNo text in this file
NECTA-045 Attachment 3 REDACTED.pdf
PDF · 201 KB · 2 pagesNo text in this file
NECTA-054_Final.pdf
PDF · 265 KB · 4 pagesText searchable
Download NECTA-054_Final.pdfRead the text of NECTA-054_Final.pdf
NECTA-057_Final.pdf
PDF · 114 KB · 1 pageText searchable
Download NECTA-057_Final.pdfRead the text of NECTA-057_Final.pdf
NECTA-057 Attachment 1.pdf
PDF · 1.5 MB · 39 pagesText searchable
Download NECTA-057 Attachment 1.pdfRead the text of NECTA-057 Attachment 1.pdf
NECTA-057 Attachment 1.xlsx
Excel · 191 KBText searchable
Download NECTA-057 Attachment 1.xlsxRead the text of NECTA-057 Attachment 1.xlsx
NECTA-060_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download NECTA-060_Final.pdfRead the text of NECTA-060_Final.pdf
NECTA-060 Attachment 1.pdf
PDF · 1.4 MB · 15 pagesText searchable
Download NECTA-060 Attachment 1.pdfRead the text of NECTA-060 Attachment 1.pdf
Text of NECTA-057 Attachment 1.pdf
Extracted from the file · 39 pages · 452,743 characters
This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.
Part 31 of 80
CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | IMPERIAL AVE | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 45-2 DUE TO THE REPLACEMENT OF P25594 TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | POST RD E | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO REPLACE POLE WITH 50-1 DUE TO 5' RULE C& K TRANSFER EXISTING POWER | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | POST RD E | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES TO RPLC W 50-1 C&K XFER EXIST PWR | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | BAYBERRY LN | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 40/2Install: 45/2Cut + Kick due to secondary riser; Replace due to mid-span clearances from new attachment; Attach Secondary 136" from pole top; Transfer 50KVA XFMR, XFMR is fused, install zap shield; Extend 3" Secondary Riser 12" with 4" PVC Shield | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | CROSS HWY | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 40/2Install: 45/1Replace due to mid-span clearances from new attachment; Attach Secondary 109" from pole top; Replace 18M Span Guy to P. 5669; Replace (2) 18M Primary Down Guy to existing anchor, LL-14' P-DE | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | STURGES HWY | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Remove: 35/4Install: 45/2Replace due to mid-span clearances from new attachment; Attach Secondary 109" from pole top; Transfer 15KVA XFMR, XFMR is fused, zap shield exists; Shift Service mid-span | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | GRUMMAN AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Svc. at 109".Transfer Xfrmr, cutouts & streetlight. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | E5 | NORTH ST | Morris | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 45' class 2 pole (JO) / Abdn. 35' pole.Cut and kick for power/Comm. risers.Attach DDE Sec./Neut. at 107" (North St).Attach DE Sec. tap at 109"Replace/Extend svc riser for new pole height.Transfer cutout & xfrmr (inst. zap shield). Note: Phone requesting replacement due to midspan clearance issues with new attachment. | null | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | E28 | ALAIN WHITE RD | Morris | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 35' pole.Attach Neut. at 82". Note: Phone requesting replacement due to midspan clearance issues with new attachment. | null | YPart 32 of 80
CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | FLAX HILL RD | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Inst 55' class 1 pole (E10) / Abdn 50' class 2 pole.ES set (1) anc. at a lead of 16' for AC DE (to West).Attach top bolt of FG x-arm at 84". Attach top bolt of bottom spacer cable bracket at 114".Attach 1PH tap at 146"Attach Sec./Neut. tap at 199". Attach AC DDE at 215" / 217".Inst. (2) 18M non-ins. anc. guy at 205" & 217", attach to the 16' lead DE anc.Inst. (2) 14M ins. span guys at 162" & 215", run both to pole 24604 (attach at existing locations at pole 24604).Transfer cutout, spare fuse holder & streetlightNote: Pole replaced at phones request, due to clearances to ground level. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | EAST AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 50' class 1 pole (JO) / Abdn. 45' class 2 pole.Attach Sec. at 136".Replace Pri. riser conduit/cable & extend to new pole height.Transfer 15K cutouts. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | EAST AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 50' class 1 pole (JO) / Abdn. 45' class 2 pole.Inst. (1) anc. (sidewalk style) at a lead of 8' for Pri. DE.Attach Sec. at 136".Inst. (1) 18M ins. anc. guy at 46", attach to 8'L DE anc.Transfer 15K cutout & street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | EAST AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 50' class 1 pole (JO) / Abdn. 45' pole.Replace 3PH 1/0 ACSR TW & 1/0 ACSR N to pole 12029.Attach Neut. & DDE Neut. at 130".Inst. (1) 18M non-ins. span guy at 136", run to pole 21282 & inst. at existing height.Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | EAST AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 55' class 1 pole (JO) / Abdn. 50' class 1 pole.Cut & kick at phones request.Replace vertical construction with x-arm.Attach Sec. at 157".Attach Neut. at 163". | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | BUCKINGHAM PL | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 35' class 2 pole (JO) / Abdn. 30' class 5 pole.Attach DE Sec. at 52". Inst. (1) 14M non-ins. anc. guy opposite DE Sec., attach to 8'L DE anc. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | SHERMAN CT | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 35' class 3 pole.Attach Sec. at 82" & pull slack in DDE Sec. to poles 27485 & 16188.Inst. (2) 18M ins. anc. guys at 22", attach (1) new DE anc. L8' & (1) to new DE anc. L11'.Inst. (2) 18M non-ins. anc. guys at 82", attach (1) new DE anc. L8' & (1) to new DE anc. L11'. | Existing Attachment auto-added. | YPart 33 of 80
CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | EAST AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 50' class 1 pole (JO) / Abdn. 45' class 3 pole.Attach DE Neut. & (2) DE Sec. at 136". Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | EAST AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 50' class 1 pole (JO) / Abdn. 45' class 2 pole. Attach Sec. at 136".Replace 600A bypass switches.Transfer 3PH recloser & control box.Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | WILLIAM ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 45' class 2 pole (JO) / Abdn 40' class 4.Pole in grass.Attach (2) 1PH taps at 42".Attach new Sec. & Sec./Neut. taps at 109".Attach other ins. end of span guy at 58", ran from pole 2987. Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | WILLIAM ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in grass.Attach Sec. DE at 82".Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | WILLIAM ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in sidewalk.Attach DE Sec. at 82".1/0 ACSR Neut. to be installed between poles 3257 & 2981 on non-reimb. WO 20881464 of this survey. Remove pole top Neut. hardware, #4 Neut. cable to be removed along William St on non-reimb. WO 20881464 of this survey.Remove guy/anc.Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | WILLIAM ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in sidewalk.Attach Sec. at 82".Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | WILLIAM ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 40' class 1 pole (JO) / Abdn 35' class 4.Pole in sidewalk.Attach Sec. at 82".Transfer streetlight,cutout & xfrmr (zap shield installed).Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | YPart 34 of 80
CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | WILLIAM ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Cut and kick for risers, pole in sidewalk.Inst. (1) anc. at a lead of 9' for corner bisector.Attach Sec. DE at 82".1/0 TPX to be installed between poles 2987, 2988 & 2989 on non-reimb. WO 20881464 of this survey.Inst. (1) 14M ins. span guy at 70", run ins. end to pole 2988.Inst. (1) 14M ins. anc. guy at 22", attach to the 9' lead bisector anc..Extend/Replace Svc. riser for new pole height.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | STRAWBERRY HILL AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 45' class 2 pole (JO) / Abdn 35' class 4.Pole in grass strip, not in sidewalk.Inst. (2) anc. at leads of 7' & 11' for corner bisector.Attach Sec. at 109".Inst. (1) 18M ins. anc. guy at 22", attach to the 11' lead bisector anc..Inst. (1) 18M non-ins. anc. guy at 109", attach to the 11' lead bisector anc..Transfer cutout & xfrmr (zap shield installed).Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | STRAWBERRY HILL AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 45' class 1 pole (JO) / Abdn 35' class 4 pole.Pole in grass, anc. in sidewalk.Inst. (1) sidewalk style anc. at a lead of 6' for corner bisector (set close to stonewall).Attach Sec./Neut. at 109".1/0 TPX to be installed and 1/0 Neut. & #2 TPX replaced for midspan Svc between poles 3255 & 3254 on non-reimb. WO 20881464 of this surveyInst. (1) 18M ins. sidewalk anc. guy at 22", attach to the 6' lead bisector anc.Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | STRAWBERRY HILL AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 45' class 2 pole (JO) / Abdn 35' class 4.Pole in grass strip, not in sidewalk.Inst. (1) anc. at a lead of 10' for corner bisector.Attach Sec. at 109".Inst. (1) 14M ins. anc. guy at 22", attach to the 10' lead bisector anc.Inst. zap shield.Transfer streetlight, cutout & xfrmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | STRAWBERRY HILL AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 45' class 2 pole (JO) / Abdn 35' class 4.Pole in grass.Attach Sec. at 109".Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | YPart 35 of 80
CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | STRAWBERRY HILL AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 45' class 2 pole (JO) / Abdn 40' class 2.Inst. (1) anc. at a lead of 14' for DE.Pole & anc. in grass.Attach Sec. at 109".Inst. (1) 14M ins. span guy at 97", run to pole 3261 (attach ins. end at existing location at pole 3261).Inst. (1) 18M non-ins. anc. guy at 97", attach to the 14' lead DE anc.Inst. zap shield.Transfer cutout & xfrmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | STRAWBERRY HILL AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 45' class 2 pole (JO) / Abdn 40' class 3.Pole in grass strip, not in sidewalk.Attach Sec. at 109".Transfer cutout & xfrmr (zap shield installed).Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | STRAWBERRY HILL AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Inst 45' class 2 pole (JO) / Abdn 35' class 4.Pole in grass strip, not in sidewalk.Inst. (1) anc. at a lead of 9' for corner bisector (Comm. use).Attach Sec. DE at 109".Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | MACINTOSH RD | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in grass strip, not in sidewalk.Inst. (1) anc. at a lead of 13' for corner bisector.Transfer 3 spool rack so bottom-most part of rack is at 82".Bring down x-arm Neut, attach at 6" above 3 spool rack.Inst. (1) 14M ins. anc. guy at 22", attach to the 13' lead bisector anc..Inst. 14M non-ins. span guy at 2" below bottom of 3 spool rack, run to pole 17235.Inst. cutout & zap shield.Transfer streetlight & xfmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment (5' step rule). | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | MACINTOSH RD | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 45' class 2 pole (JO) / Abdn 40' class 2.Pole in grass.Inst. (1) anc. at a lead of 16' for DE.Attach Neut./Sec. DDE at 97".Attach other end of span guy at 109", ran from pole 17234.Inst. (1) 14M ins. anc. guy at 22", attach to the 16' lead DE anc..Inst. (1) 14M non-ins. anc. guy at 109", attach to the 16' lead DE anc..Inst. cutout & zap shield.Transfer streetlight & xfmr.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | CHELENE RD | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 40' class 2 pole (JO) / Abdn 35' class 4.Pole in grass, behind sidewalk.Inst. (1) anc. at a lead of 9' for corner bisector.Attach Sec. at 82".Inst. (1) 14M ins. anc. guy at 22", attach to the 9' lead bisector anc..Transfer streetlight.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | YPart 36 of 80
CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready | Precision Valley Communications | Complete | SKY TOP RD | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Inst. (1) anc. at a lead of 12' for DE.Attach Sec. Des at 50"/52".Inst. (1) 14M ins. span guy at 40", run to pole 10561 (attach ins. end at 22" at pole 10561).Inst. (1) 14M non-ins. anc. guy at 52", attach to the 12' lead DE anc..Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready | Precision Valley Communications | Complete | SPRUCE DR | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Inst. (1) anc. at a lead of 12' for corner bisector.Attach Sec. at 82".Inst. (1) 14M ins. anc. guy at 22", attach to the 12' lead bisector anc..Trim near pole to perform work.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready | Precision Valley Communications | Complete | SYCAMORE DR | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Replace 14M primary down guy and install 14M secondary down guy to new ES-set 1"TT anchor LL=15', P=DE; Install 1"TT anchor for new FTR down guy LL=12' | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | BLUEWATER HL | Westport | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES Inst 40' class 2 pole (JO) / Abdn 35' class 4 pole.Cut and kick for power/Comm. risers.Inst. (1) anc. at a lead of 10' for DE (West).Inst. (1) anc. at a lead of 10' for DE (South).Attach Sec. at 80"/82".Inst. (1) 18M ins. anc. guy at 22", attach to the 10' lead DE (West) anc..Inst. (1) 18M ins. anc. guy at 24", attach to the 10' lead DE (West) anc..Replace Sec. riser for new pole height, replace UG Sec. to handhole 6373A near base of pole. Transfer street light.Note: Pole replaced due to Comm. midspan clearance with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | BAYNE ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 35' class 2 pole (JO) / Abdn. 30' class 4 pole.Cut & kick pole for service riser.Inst. (1) anc. at a lead of 8' for corner/bisector.Attach DDE Sec. at 52".Replace service riser conduit/cable & extend to new pole height.Inst. (1) 14M non-ins. anc. guy opposite Sec. DE, attach to 8'L bisector anc. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | RICHARDS AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 1 pole (JO) / Abdn. 40' class 2 pole.Attach Sec. at 109".Transfer Xfrmr, Cutout & (2) streetlights.Inst. Zap shield. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | CHEESE SPRING RD | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 35' class 2 pole (JO) / Abdn. 30' pole.Cut and kick for risers.Inst. (1) anc at a lead of 6' for DE.Attach DE Sec. at 52". Inst. (1) 18M non-ins. anc. guy at 52", attach to the 6' lead DE anc..Replace/extend svc riser for new pole height.Note: Pole replaced at phone’s request due to midspan clearance with new attachment. | Existing Attachment auto-added. | YPart 37 of 80
CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | BARBARA DR | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 2 pole (JO) / Abdn. 40' class 3 pole.Inst. (1) anc. at a lead of 8' for DE.Attach Sec./Neut. at 109".Inst. (1) 18M ins. anc. guy at 46", attach to 8' lead DE anc..Transfer cutout & street light.Note: Pole replaced at phones request, due to comms clearances in midspan with new attacher. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | BARBARA DR | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 45' class 1 pole (JO) / Abdn. 40' class 4 pole.Cut & kick for service riser.Attach 1PH DE 30".Attach Neut./Sec. & Neut./Sec. taps at 101".Attach DE Sec. at 109" (to pole 34165).Inst. (1) 14M ins. span. guy at 46", run to pole 31949 (attach at existing location at pole 31949).Extend service riser for new pole height.Transfer street light.Note: Pole replaced at phones request, due to comms clearances in midspan with new attacher. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | BARBARA DR | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Sec. at 82".Inst. (1) 14M ins. span. guy at 22", run to pole 3574 (attach 6" below Sec. DE at pole 7574).Transfer street light.Note: Pole replaced at phones request, due to comms clearances in midspan with new attacher. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | JOHNSON RD | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 35' class 4 pole.Attach Sec. at 82".Transfer street light.Note: Pole replaced at phones request, due to comms clearances in midspan with new attacher. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | NORWALK DANBURY RD | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 50' class 2 pole (E5) / Abdn 45' class 2 pole.Cut & kick for pri riser.Inst. (1) anc. at lead of 20' for Pri (unbalance) & span guy DE. Set anc. behind pole line/lines going to pole 22708, not inline with DEs.Attach Neut. at 163".Inst. (2) 14M ins. anc. guys at 15" & 16", attach both to the 20' lead DE anc..Inst. (1) 14M non-ins. anc. guy at 151", attach to the 20' lead DE anc..Inst. (1) 14M ins. span guy at 22â€, run to pole 22709-S, attach at existing location at pole 22709-S.Inst. (1) 14M non-ins. span guy at 151â€, run to pole 26811, run to pole 26811.Replace 3PH Pri. riser equipment, extend for new pole height. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | NORWALK DANBURY RD | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 45' class 2 pole (JO) / Abdn 40' class 3 pole.Cut & kick for service riser.Attach TPX at 101" & QPX at 109".Attach other end of span guy at 109", ran from pole 22709.Replace service. riser conduit/cable, extend for new pole height.Transfer xfrmr (inst. zap shield) & cutout. | Existing Attachment auto-added. | YPart 38 of 80
CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | NORWALK DANBURY RD | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise 3PH X-arm Pri. 71". Raise Sec. 43". Extend 3PH riser with 48†FG bracket up to Sec. Raise street light 44". Transfer cutouts & arresters. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | NORWALK DANBURY RD | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise 3PH X-arm Pri. 97". Raise 1PH tap Pri. 87". Raise Sec. & DE Neut. 64". Replace cutout & install arrester. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | NORWALK DANBURY RD | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise Sec. 18". | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Make-Ready Overdue | Precision Valley Communications | Complete | NEWTOWN AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Inst 50' class 1 pole (JO) / Abdn 45' class 1 pole.Pole in grass.Inst. (1) anc. at a lead of 13' for DE.Maintain slack span of Pri. wires to pole 10976.Attach under build x-arm top bolt at 76".Attach Sec. at 136".Inst. (1) 18M ins. anc. guy at 15", attach to the DE anc.Transfer street light. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | ARGENTINE WAY | Norwalk | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | null | Replace secondary down guy with 14M to new FTR-set 1"TT anchor LL=12', P=DE | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | FILLOW ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 45' class 1 pole (JO) / Abdn. 40/3 pole.Cut and kick due to other risers/underground facilities.Inst. (1) anc. at a lead of 6' for corner bisector (Fillow St).Inst. (1) anc. at a lead of 10' for DE, set behind pole line to pole 3089 (not closer to road).Attach 1PH tap at 42" & 3PH tap x-arm top bolt at 42". Attach Neut./Neut. taps at 103". Attach DE Sec. at 109". Inst. (1) 18M ins. anc. guy at 22", attach to the 6' lead bisector anc..Inst. (1) 18M non-ins. anc. guy at 109", attach to the 10' lead DE anc..Inst. (1) 14M ins. span guy at 50", run to pole 3089 (attach at existing location at pole 3089).Transfer streetlight.Notes: Pole replaced at phone’s request due to midspan clearance with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | FILLOW ST | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES set 45' class 1 pole (JO) / Abdn. 35' pole.Inst. (2) anc.s at leads of 22' & 18' for corner bisector.Attach Sec. DDE at 109". Inst. (1) 14M ins. anc. guy at 22", attach to the 22' lead bisector anc..Inst. (1) 14M non-ins. anc. guy at 103"", attach to the 22' lead bisector anc..Inst. cutout & zap shied.Transfer xfrmr & streetlightNotes: Pole replaced at phone’s request due to midspan clearance with new attachment. | Existing Attachment auto-added. | YPart 39 of 80
CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise bottom 3PH tap x-arm 12â€. Raise TPX/Neut. tap/Sec. tap 20†& bring TPX Sec. to roadside of pole. Remove QPX Sec. to pole 22728. Raise top AC (tangent) 30â€. Raise both of the bottom (2) DEs each 24". Raise streetlight 28â€. Inst. (2) 18M non-ins. anc. guys with (1) opposite bottom-most AC DE and other (1) 12" above that guy, replacing existing AC guying, attach to existing DE anc.. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise Neut./Sec. tap 22" Raise Sec. DE 22". Raise streetlight 12" | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Remove 2-25kVA xfrmrs and their cutouts of 3PH xfrmr bank & its cluster mount. For remaining 1-25kVA xfrmr, place above to be raised Sec.. (existing zap shield & cutout installed). Raise Sec./Sec. tap 12". Complete removal of QPX from pole 22729. Raise AC 12". Raise streetlight 12". | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | DOUBLE POLE | Raise Sec 22". Extend 3PH Pri. riser cable & conduit, rebuild terminator FG bracket for Sec. raise. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise Pri 48". Raise Xfrmr bank 32". Raise QPX/Neut. 29". Raise TPX DE 29". Raise streetlights 30". Transfer (1) streetlight & (2) area lights. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | DOUBLE POLE. | Raise top Pri to top of pole. Raise 3PH Pri tap 34". Raise Sec./Neut./Sec. tap 22â€. Extend Svc riser up to raise to Sec. level. Raise streetlight 22â€. Note: Cutouts at pole 9500, not 23323. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise Sec./Sec. tap 18". Pull slack in Sec. to pole 27217. Raise (1) streetlight & (1) area light 20". | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 50' class 2 (JO) / Abdn 45' class 3.Cut & kick pole for risers, pole in grass.Inst. (1) sidewalk style anc. at a lead of 10' for corner bisector.Attach Sec. at 136".Inst. (1) 18M ins. sidewalk anc. guy at 22", attach to the 10' lead sidewalk anc..Replace/Extend 3PH Pri. riser for new pole height.Transfer cutouts, (1) streetlight & (1) area light.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | YPart 40 of 80
CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst 50' class 2 (JO) / Abdn 45' class 2.Cut & kick pole for risers, pole in grass.Attach Sec. at 136".Replace/Extend 3PH Pri. riser for new pole height.Transfer cutouts, (1) streetlight & (1) area light.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | ES inst. 50' class 2 (JO) / Abdn 45' class 4.Cut & kick pole for risers, pole in grass.Inst. (1) anc. at a lead of 19' for DE.Attach 1PH tap at 48" (39'-0"), inst. w/(2) susp. ins., place 1PH tap cutout on top x-arm, omit FG bracket.Attach TPX DE from pole 23242 & TPX DE to pole 9717 at 126".Attach QPX DE from pole 23244 & QPX DE to pole 25522 at 134".Attach QPX DE tap to pole 9717 at 136".Inst. (1) 14M ins. anc. guy 64", attach to the 19' lead DE anc..Replace/Extend 3PH Pri. riser for new pole height, inst. (2) angle ins. to hold road phase and middle phase riser lead cables.Attach 3PH 48" FG equipment bracket at 90". Replace (4) cutouts 1-50K, 3-30K.Transfer (1) streetlight & (1) area light.Note: Pole replaced at phones request, due to clearances to ground level with new attachment. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Precision Valley Communications | Complete | CONNECTICUT AVE | Norwalk | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Shift Raise | null | null | null | Raise Sec./Sec. tap 24". Pull slack in Sec. to pole 23243 & in DE Sec. to pole 9506. Raise (1) streetlight & (2) area lights 36". | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | SLAB MEADOW RD | Morris | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | MAKE-READY | Other | null | null | null | Replace primary down guy with 14M to new 1"TT anchor LL=16', P=24' | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Make-Ready Overdue | Precision Valley Communications | Complete | THOMASTON RD | Morris | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | FTR TO PLACE 1" TER AT L=10 B=230 | Install secondary down guy with 14M to new FTR-set 1"TT anchor LL=9', P=DE; Shift service to pole; Attach #2 TPX onto the pole | Y CONNECTICUT LIGHT&POWER New or Replace Poles | Awaiting MR Payment | Precision Valley Communications | Complete | MORIARITY DR | Wilton | CONNECTICUT LIGHT&POWER/FRONTIER | CONNECTICUT LIGHT&POWER | null | null | REPLACE | null | Set 40' class 2 pole (JO) / Abdn. 30' class 4 pole.Cut & kick pole for service riser.Inst. (1) anc. at a lead of 12' for DE.Pull slack in DE Neut. to pole 20857, attach at 82"Inst. (1) 18M ins. anc. guy at 22", attach to 12' lead DE anc.Extend service riser for new pole height.Transfer cutout & Xfrmr (inst. zap shield).Note: Pole replaced at phones request, due to comms clearances in midspan. | Existing Attachment auto-added. | Y CONNECTICUT LIGHT&POWER Make-Ready Attachments | Awaiting MR Payment | Precision Valley Communications | Complete | 2343-S | FOX RD | Putnam | FRONTIER/CONNECTICUT LIGHT&POWER | FRONTIER | MAKE-READY | Other | null | null | null | Replace secondary down guy with 14M to new FTR-set 1"TT anchor LL=10' , P=DE | Y
Text of NECTA-060_Final.pdf
Extracted from the file · 1 page · 1,114 characters
Text of NECTA-060 Attachment 1.pdf
Extracted from the file · 15 pages · 67,516 characters
As listed on the current system
Question(s) Answered 45, 54, 57, 60 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026