Interrogatory responses

Answers to questions 582, 585, 586

Files5

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-586 Attachment 1 Page 1 of 1 $ Millions 2027 Asset Health 2031 Total 10,000 $ 15,000 $ 15,000 $ $ 500 $ 1,000 $ 1,000 $ 1,000 $ 1,500 $ 5,000 Asset Health Subtotal $ 500 $ 6,000 $ 11,000 $ 16,000 $ 16,500 $ 50,000 $ 3,100 $ 3,100 $ 3,100 $ 3,100 $ 3,100 $ 15,500 $ (8,000) $ (8,000) $ (16,000) Substation Communications-Incremental Emergent * EMERGENT EQUIPMENT FAILURES - SUBSTATION-L4 45,000 Adaptive Protection $ 800 $ 800 $ 800 $ 800 $ 800 $ 4,000 LTC Controls $ 2,350 $ 2,350 $ 2,350 $ 2,350 $ 2,350 $ 11,750 Microprocessor Relays $ 11,100 $ 11,100 $ 11,100 $ 11,100 $ 11,100 $ 55,500 Virtual Protection $ - $ 5,000 $ 3,000 $ 3,000 $ 3,000 $ 14,000 - DERMS Demonstration Reliability 2030 5,000 $ Communications Planning Analytics 2029 $ UG Network Automation-Incremental Grid Ops Technology 2028 SS AGING INFRASTRUCTURE-Incremental $ 500 $ 3,500 $ 5,000 $ 5,000 $ 14,000 Grid Ops Technology Subtotal $ $ 14,250 $ 19,750 $ 20,750 $ 22,250 $ 22,250 $ 99,250 Advanced Analytics Platform $ 1,000 $ 4,000 $ 3,000 $ 1,000 $ 1,000 $ 10,000 Advanced Forecasting Tools $ 5,000 $ 3,000 $ 3,000 $ - $ Circuit Planning Capabilities to manage planning models $ 4,000 $ Integration of Electric/Gas Planning Tools / Pilot $ 3,000 $ - Planning Analytics Subtotal $ 13,000 $ 10,000 $ 3,000 $ $ 3,200 $ 3,300 $ 3,390 $ SMART SWITCHES PROGRAM LINE SENSORS PROGRAM-Incremental $ - $ - $ 8,000 - $ - $ - $ 7,000 - $ - $ - $ 3,000 1,000 $ 1,000 $ 28,000 3,500 $ 3,600 $ 16,990 $ 2,500 $ 3,000 $ 28,040 $ 53,940 $ 56,637 $ 144,117 Reliability Subtotal $ 5,700 $ 6,300 $ 31,430 $ 57,440 $ 60,237 $ 161,107 $ 5,300 $ 5,460 $ 10,760 4,529 $ 73,809 $ 13,030 $ 110,120 $ 27,031 $ 127,578 $ 47,618 396,235 Capacity VOLTAGE AUTOMATION New Customer Shared Hosting & Advancement of Renewable Energy (SHARE) Total $ $ 36,550 $ 3,028 $ 48,178 $ * Incremental increase in proactive substation aging infrastructure investments are expected to yield a decrease in emergent equipment failure spending

Text of OCC-586 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 582, 585, 586 (The Connecticut Light and Power Company) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)