Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 628, 639

Files3

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-628 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 53-63. The work associated with this invoice was performed on March 18-20, 2024. Please explain how the Company verified the work resulted from event MS24E. Response: Please refer to Exhibit ACCT-2 (CLP-5)(MS24E), Outside Line Contractors, at Line 37, Asplundh Construction Corp, in amount of $5,521. The charges on this invoice are related to post storm repairs after post storm patrols were completed. Repairs included replacing cross arms and vice tops. Please refer to OCC-628, Attachment 1, for the results of the patrol findings in the western region of the state that include the job locations associated with the Asplundh Construction Corp invoice.

As listed on the current system

Question(s) Answered 628, 639 (The Connecticut Light and Power Company) Date Filed: 09/24/2026

This filing on the current system (opens in a new tab)