Interrogatory responses
Answers to questions 633
Filed by The Connecticut Light and Power Company1 file
Part of docket 26-05-10Files1
OCC-633_Final.pdf
PDF · 104 KB · 1 pageText searchable
Download OCC-633_Final.pdfRead the text of OCC-633_Final.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-633 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (MS24E) Please refer to the Response to Exhibit ACCT-2(CLP-5A-02)(MS24E) p. 115, which lists in the description of work communication line down. a. Did the Company reinstall/repair a communication line? b. If yes to a, did the Company recover this cost from the communications company? Response: a. The Company does not reinstall or repair any communications lines. A crew was dispatched due to the customer reporting low wires in their driveway. At the point they determined it was not Company equipment, the crew communicated the information back to the Company and was available for another assignment. b. N/A
As listed on the current system
Question(s) Answered 633 (The Connecticut Light and Power Company) Date Filed: 09/24/2026