Interrogatory responses
Answers to questions 635, 636, 640
Filed by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Files3
OCC-635_Final.pdf
PDF · 98 KB · 1 pageText searchable
Download OCC-635_Final.pdfRead the text of OCC-635_Final.pdf
OCC-636_Final.pdf
PDF · 101 KB · 2 pagesText searchable
Download OCC-636_Final.pdfRead the text of OCC-636_Final.pdf
OCC-640_Final.pdf
PDF · 103 KB · 2 pagesText searchable
Download OCC-640_Final.pdfRead the text of OCC-640_Final.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-16 Date Issued September 10, 2026 OCC-635 Page 1 of 1 Date Filed: September 24, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K - Timesheet) Refer to Exhibit ACCT-2 (CLP-13A-16) (MN25K). The following pertains to invoice #3630R (p. 208-226): a. Per review of the work descriptions, p. 214, the last event noted ‘MTV sub crews released with no tasks performed’. Explain how the Company gained comfort over the total billable hours within the report given the release of the crew prior to the end time in box 7. b. Per review of the work descriptions, p. 215, the last event noted ‘Not completed: crews released from job by system dispatch’. Explain how the Company verified the total billable hours within the report given the release of the crew prior to the end time in box 7. Response: a. The comment from the crew was that the three cutout fuses were intentionally opened and left open, however, there were no indications (tags, bands, signs) present to show who had done it. After speaking with dispatch, it was determined that the MTV subcontractor in question was a different crew than the one annotating the timesheet. This crew had opened the fuses and subsequently left the jobsite without performing any additional work (tasks). b. The comment “crews released from job by system dispatch” is in reference to them being unable to complete the job at hand and being removed from the work assignment at 8 Rocco Dr, Wolcott, not them being released from storm duty.
As listed on the current system
Question(s) Answered 635, 636, 640 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/24/2026