Interrogatory responses
Answers to questions 872
Filed by The Connecticut Light and Power Company1 file
Part of docket 26-05-10Files1
OCC-872_Final.pdf
PDF · 114 KB · 2 pagesText searchable
Download OCC-872_Final.pdfRead the text of OCC-872_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-22
Date Issued September 28, 2026
OCC-872
Page 1 of 2
Date Filed: October 16, 2026
Witness:
Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G.
Griffin
Request from: Office of Consumer Counsel
Question:
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-07)(MS24E), p. 117-121.
a. Box 12 on the timesheet indicates 9 hours worked on March 12, but boxes 24 and 25 show the
earliest work time starting at 8 am and the latest end time at 12:15 pm. Please explain this
discrepancy.
b. Boxes 24 and 25 contain overlapping work times, such that every member of the crew could
not have worked each of the times indicated. Please explain how the Company confirmed that
every member of the crew worked for 9 hours that day.
Response:
a. All contractor crews and non-Connecticut based Company employees working storm
restoration in Connecticut are typically lodged in hotel rooms. Prior to beginning their first
job of the day, the crews eat a meal, conduct safety briefings, perform U.S. Department of
Transportation mandated pre-trip inspections on their trucks, and restock their trucks as
necessary with material needed for their day. This takes time and the crews are methodical
because they do not want to get out into the field without the right equipment or materials. The
crews start the work shift by driving from their hotel rooms to the job site and depending on
the availability of hotel rooms, that can add an additional 30 minutes or more. The intervals
of time at the start of the work shift and between restoration “events” is an expected and
necessary part of the work shift, for which the crews are paid. Within a work shift, the crews
do not get paid differently for different types of work. Therefore, from a field perspective, the
start and stop time is the critical data point for the timesheet.
b. The referenced timesheets are not for a single crew. The size of a line crew is dependent upon
the work being performed. For a lot of jobs that have minimal damage, a single two-person
crew in one bucket, or possibly two bucket trucks, can accomplish the job. On other events
with extensive damage (broken poles, many spans of wire down, etc.), it can require several
two-person crews working as a team to make the repairs and re-energize the area. When the
Company onboards contractor crews, it is identified how many crews the contractor contingent
is bringing onboard. The Company employee dispatching the crews and the ERFC physically
in the field with the crews both confirm that all crews are properly engaged and working
throughout the duration of the storm.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-22
Date Issued September 28, 2026
OCC-872
Page 2 of 2
March 12 was the final day of the storm event. At the end of any event, restorations are down
to the last individual outages, and the Company is focused on returning the system to its steady
state, deploying available crews to the stack of single or small outage events and non-outage
events that have to be completed before the resources are demobilized. As crews are working
in the field, the Company is working through its systems to assess what’s left to do, in what
locations and which resources are needed before individual crews or groups of crews are
demobilized and sent away from the system.
The crews on the referenced timesheets started their time at 0600 and arrived at their first job
at 0800, finished work on certain identified events at 12:20 p.m. and then were in the field until
3 p.m. when they were demobilized. Because it was the very end of the restoration effort, the
multiple crews were functioning in a team, splitting up to cover multiple jobs throughout the
day coordinated through this group. All crews worked for nine hours, 6 a.m. till 3 p.m. and
properly billed the Company for that time. The listed OMS events are just the time that crews
were working on specific events tracked for completion. During other hours, these crews were
completing other tasks not recorded as “events” in the system and were present on the system
until demobilized.
As listed on the current system