Interrogatories
To CL&P, questions 158 thru 170
Files1
26-05-10 - EOE Interrogatories Set 4.pdf
PDF · 276 KB · 9 pagesText searchable
Download 26-05-10 - EOE Interrogatories Set 4.pdfRead the text of 26-05-10 - EOE Interrogatories Set 4.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
OFFICE OF EDUCATION, OUTREACH, & ENFORCEMENT
September 3, 2026
Docket No. 26-05-10
Re: Docket No. 26-05-10 - Application of CL&P dba Eversource Energy to Amend its
Rate Schedules
Enclosed are interrogatories EOE-138 through EOE-170 directed to The
Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource,” or
“Company”). The responses to these questions have been deemed necessary by the
Public Utilities Regulatory Authority (Authority) Office of Education, Outreach, and
Enforcement (EOE) in connection with the above referenced docket and will become a
part of the record in this proceeding. Please note that persons responsible for responses
must be available for cross-examination during a hearing, if held, and must attest to the
truth and accuracy of their responses.
Please submit the responses to the Authority’s Executive Secretary no later than
4pm on September 17, 2026. If a response to any of the requested information has
already been filed in response to another interrogatory response in this proceeding,
please reference the interrogatory which provides the information. It is the respondent’s
responsibility to ensure that any such information is on file with the Executive Secretary
of the Authority.
EOE requests that all interrogatory responses be included in the same
document, rather than responses to each interrogatory being filed as individual
documents.
Anyone filing material with the Authority should file only an electronic copy through
the PURA Web Filing System. Please refer to Electronic Filing on the Authority’s website
for more information. Paper filings will be accepted only if a person is unable to file
electronically. The Authority reserves the right to request paper copies of certain
filings at a later date. No confidential material may be filed publicly through the web
filing system. Confidential material can be filed electronically by email using the following
directions: confidential material must be emailed directly to [email removed] in an
email with a subject line labeled in all capital letters “CONFIDENTIAL MATERIAL - NOT
FOR PUBLIC DISCLOSURE.” Each page of any electronic confidential information shall
also contain a header “CONFIDENTIAL – NOT FOR PUBLIC DISCLOSURE.” The
motion for a protective order shall be filed publicly.
The Authority operates with the strong presumption that all documents filed with it
are public records subject to the right of public inspection and copying in accordance with
the Connecticut Freedom of Information Act, Conn. Gen. Stat. § 1-200 et. seq. In those
10 Franklin Square, New Britain, CT 06051
An Equal Opportunity Employer
www.ct.gov/pura
exceptional circumstances where a participant believes that information it intends to file
is confidential under law, it may file a Motion for a Protective Order requesting an
exemption from public disclosure. The Motion must provide specific legal arguments with
reference to state or federal law describing with supporting facts why the information
should be kept confidential. A certified affidavit supplied by a competent witness in
support of the Motion, a proposed protective order and nondisclosure agreement must be
appended to the Motion. The Authority will rule on the Motion forthwith, and give further
direction as necessary. Contact the Authority’s Executive Secretary at [phone removed]
with questions regarding making a confidential filing.
The current service list for this docket is available on the Authority's website
located at www.dpuc.state.ct.us/DPUCservlist.html.
Sincerely,
By: /s/Britany Wyman
Brittany Wyman
Attorney
PUBLIC UTILITIES REGULATORY AUTHORITY
Office of Education, Outreach, and Enforcement
Enclosure
cc:
Service List
CERTIFICATE OF SERVICE
I hereby certify that on this day the foregoing document was filed with the Public Utilities
Regulatory Authority, and copies thereof were served upon each person designated on
the official service list in this proceeding in accordance with R.C.S.A. § 16-1-15.
Sincerely,
By: /s/Britany Wyman
Brittany Wyman
Attorney
PUBLIC UTILITIES REGULATORY AUTHORITY
Office of Education, Outreach and Enforcement
The following Interrogatories, designated as EOE-138 through EOE-170, are
directed to The Connecticut Light and Power Company d/b/a Eversource Energy
(“Eversource,” or “Company”).
EOE-138.
(VEGETATION MANAGEMENT PROGRAM) Discuss the makeup of the
Vegetation Management organization and provide a copy of the
organizational chart.
EOE-139.
(VEGETATION MANAGEMENT PROGRAM) Explain why the Company
relies on external vendors in lieu of hiring employees responsible for actual
tree trimming and tree removals.
EOE-140.
(VEGETATION MANAGEMENT PROGRAM REDESIGN) Refer to Exhibit
CLP-VMP-1. Respond to the following:
a. Explain how the Company’s historical vegetation management program
(VMP) has impacted the Company’s vegetation-related storm staffing
levels outlined within its Event Level Matrix (ELM).
b. Explain how the Company’s proposed redesign to the VMP is expected
to impact the Company’s vegetation-related storm staffing levels
outlined within its ELM.
EOE-141.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-VMP-1,
pp. 16, 25-26. Identify the total amount of capitalizable Enhanced Tree
Trimming (ETT) costs per year since 2018 through present split between
(1) enhanced tree removals (“ETR”); (2) customer-focused ETT work; and
(3) CTDOT work pursuant to the CTDOT vegetation standard. Additionally,
identify the capitalization period (i.e., amortization period) for each type of
work.
EOE-142.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-VMP-1,
pp. 18-24. The Company identified seven types of components associated
with CL&P’s historical VMP. Please identify the historical cost breakdown
between these seven components from 2018 through present.
EOE-143.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-VMP-1,
p. 32. Respond to the following:
a. Does the Company track each instance where there are “limitations
imposed during the scheduled maintenance trim”?
b. If response to subsection ‘a’ is yes, provide a current listing of these
limitations.
c. If response to subsection ‘a’ is yes, provide details regarding the
historical (i.e., 2018-present) instances where the referenced vegetation
caused outages or damage to the Company’s infrastructure.
d. For each occurrence identified within subsection ‘c’, identify if the
Company attempted to recover damages from the property owner. If
damages were not pursued, explain why.
EOE-144.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-VMP-1,
pp. 28, 36. Respond to the following:
a. Identify the total test year cost for the Company’s execution of the
ground-based LiDAR evaluation. Additionally, identify the total LiDAR
evaluation costs that are included in the rate year and, if applicable,
explain why the costs are expected to recur.
b. Explain the nature of the $950,000 LiDAR costs included on p. 36 and
provide supporting calculations or other related documentation.
EOE-145.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-VMP-1,
p. 39. The Company referenced the VMP Request For Proposal (RFP)
process that is underway and is expected to be finalized in November 2026.
a. Provide a complete copy of the RFP request;
b. Explain where in the process the Company currently is;
c. Discuss how the Company notified potential bidders; and
d. Provide copies of all proposals submitted by vendors.
EOE-146.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-VMP-1,
p. 45. The Company identified certain recommended changes to customer
notifications that resulted from Docket No. 12-01-10. Identify the total
estimated cost reductions to the VMP if the Authority were to approve the
Company's request to provide notices in alignment with § 16-234.
EOE-147.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-VMP-1,
pp. 46-47. The Company discussed "hazard and risk trees." Respond to
the following:
a. Explain where the referenced "hazard and risk trees" are located (i.e.,
on rights of way or on private property).
b. Identify if there are circumstances where the Company could provide an
arborist report to the property owner of "hazard and risk trees” assigning
responsibility for, or defer, the costs of vegetation removal. Identify if the
Company has allocated or collected any damaged infrastructure costs
associated with "hazard and risk trees" to the customers.
EOE-148.
(Reliability) Refer to Exhibit CLP-ELP-1, p. 47. Please explain how the
Company calculates Customers Experiencing Multiple Interruption (CEMI).
EOE-149.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-ELP-1,
p. 64. Please explain how the Company calculates Storm-CEMI.
EOE-150.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-ELP-1,
p. 64. Please provide a list of the 100 highest Storm-CEMI from 2018
through 2025, individually.
EOE-151.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-ELP-1,
p. 67. Please provide the cost benefit analyses the Company performed for
determining reliability projects for the 2025 test year.
EOE-152.
(VEGETATION MANAGEMENT PROGRAM) Refer to Exhibit CLP-VMP-1,
p. 19. Please provide the Company’s Scheduled Maintenance Trimming
(SMT) program’s scheduled circuits from January 1, 2022, through
December 31, 2026. Include in the response an unlocked excel
spreadsheet, for each year containing the following information:
a. Planned routes with start and end addresses;
b. Start and end date of work performed;
c. Contractor who performed the work; and
d. Emergent work with a description of the work performed and the date
the work was performed.
EOE-153.
(VEGETATION MANAGEMENT PROGRAM) For each year, from 2018
through 2025, please provide a list of external vegetation management
contractors the Company has employed.
EOE-154.
(VEGETATION MANAGEMENT PROGRAM) For each of the vendors the
Company has provided in response to the above Interrogatory, EOE-153,
please provide the applicable contract for the time period in which the
contractor performed work.
EOE-155.
(VEGETATION MANAGEMENT PROGRAM) For each year from 2018
through 2025, please provide the Company’s total expenditure on vine
control, in an unlocked excel spreadsheet, broken down by:
a. Year;
b. Cost per mile for each of the Company’s programs (SMT, ETT, etc.);
c. Total cost allocated to each contractor.
EOE-156.
(PBMRP CAPITAL SUPPORT MECHANISM) Refer to Exhibit CLP-ELP-1,
pp. 101-103. Provide a working, unlocked Excel spreadsheet that would
serve as a representative tool used to calculate the Company’s incremental
revenue requirements resulting from the proposed capital support
mechanism (F-Factor) for each year of the MRP. As part of the submission,
discuss the calculations and separately identify and explain all critical
assumptions, using cited information from the Company’s rate case
submission where relevant (e.g., depreciation rate from the Company’s
depreciation study). In support of the request, please use the Company’s
proposed 5-Year Targeted System Performance (TSP) Plan within the
spreadsheet’s initial inputs and apply an initial assumption that the
Company incurred actual plant-in-service additions of 5% more than the
proposed annual TSP funding. Additionally, please configure the
spreadsheet to allow for the weighted average carrying costs (WACC) to be
individually adjusted for both ROE and Cost of Debt.
EOE-157.
(RECEIVABLES/UNCOLLECTIBLES) Refer to Response to EOE-061,
Att.1 Redacted. The Memo referenced a Reserve Calculation Report (p.
2). Provide a working copy of the report as of December 31, 2025.
EOE-158.
(ANNUAL REVENUE REQUIREMENTS) Refer to Response to EOE-064.
The Company provided the authorized annual revenue requirements,
excluding the authorized revenues associated with the Electric System
Improvements (ESI) charges. Please supplement the response to include
the authorized revenues associated with ESI.
EOE-159.
(PROCUREMENT PROCEDURES) Refer to Response to EOE-046. The
Company’s response identified the requirements for purchases greater than
$50,000 (i.e., competitive bids, sole source justifications, or documented
exceptions) and included a note that states “[t]he requirement to document
the exception was introduced in August of 2025.” Explain why the
documented exception process was only introduced in August of 2025 and
discuss what standard(s) existed prior to the new requirement.
EOE-160.
(PROCUREMENT-DOCUMENTED EXCEPTION) Refer to Response to
EOE-046. Provide a detailed listing of all “Documented Exceptions” to the
Procurement Policy and Procurement Manual as referenced on p. 4.
EOE-161.
(PROCUREMENT-MINIMUM PROPOSALS) Refer to Response to EOE046. The Company’s response references the Procurement manual as
requiring three bidders for transactions exceeding $50,000 but stated that
“there is no strict mandate that a minimum number of completed proposals
must be received.” Discuss the Company’s process for when fewer than
three bids are received and identify if the Company monitors these
situations. As part of the response, please provide a detailed listing of all
competitive bids assessments where the Company received fewer than
three proposals.
EOE-162.
(APPROVAL LEVELS) Refer to Response to EOE-050. Explain how the
Company monitors adherence to the Company’s Delegation of Authority
(DOA) policy to ensure that multiple purchase orders or contracts are not
used in lieu of obtaining higher levels of approvals.
EOE-163.
(APPROVAL LEVELS) Refer to Responses to EOE-050 and EOE-054.
Identify why the following vendor example was subject to multiple purchase
order (PO) numbers where each of the PO values were below the
procurement agent’s approval limits. As part of the response, please
provide any correspondence or other documentation demonstrating
approval by an individual with the correct authority level:
PONUM
VENDOR NAME
13315849
13312300
13310146
13309415
SUMMIT HANDLING SYSTEMS INC
SUMMIT HANDLING SYSTEMS INC
SUMMIT HANDLING SYSTEMS INC
SUMMIT HANDLING SYSTEMS INC
PO
VALUE
$99,864
$99,864
$99,864
$99,864
APPROVAL
DATE
2/5/2025
1/24/2025
1/15/2025
1/15/2025
EOE-164.
(MILESTONE PAYMENTS) Refer to Response to EOE-56. The Company’s
response stated that the “Company does not generally support milestone
payments prior to work being performed or costs being incurred by the
Company’s vendor…” Provide a listing of all procurements that included
milestone payments, along with the rationale for why the payments were
permitted. As part of the response, please identify the vendor, the
contractual amount, and the payment amount that would be at risk.
EOE-165.
(COMPETITIVE BID ASSESSMENTS) Refer to Response to EOE-051,
Att.1. The Company’s response identified that “supporting procurement
records are maintained at the Purchase Order or Contract level rather than
the Supplier level.” Please supplement EOE-051, Att.1 with a detailed
listing of the applicable purchase order or contract numbers and identify
whether the POs or contracts were subject to a competitive bid or sole
source approval.
EOE-166.
(COMPETITIVE BID ASSESSMENTS) Respond to the following:
a. Explain how the Company ensures that each purchase order or contract
is subject to a competitive bid assessment, sole source justification, or
an approved exception. As part of the response, please discuss whether
there are any systemic controls, including the use of Ariba, that ensure
adherence to these requirements and, if applicable, provide an example
of the referenced controls.
b. Explain how the Company ensures adherence to the Company’s
competitive bid requirements for situations where multiple purchase
orders or contracts could be used in lieu of the referenced controls
discussed in subsection a.
EOE-167.
(COMPETITIVE BID ASSESSMENTS) Refer to Response to EOE-054.
Identify why the following vendor example was subject to multiple purchase
order (PO) numbers where each of the PO values were below the
competitive bid threshold (i.e., $50,000). As part of the response, please
provide any correspondence or other documentation demonstrating that a
competitive bid has occurred.
PONUM
VENDOR NAME
13242176
13245536
13133137
11150160
HARTFORD ELEVATOR LLC
HARTFORD ELEVATOR LLC
HARTFORD ELEVATOR LLC
HARTFORD ELEVATOR LLC
EOE-168.
PO
VALUE
$49,750
$49,900
$49,900
$49,900
APPROVAL
DATE
5/17/2024
5/31/2024
5/11/2023
12/9/2021
(COMPETITIVE BID ASSESSMENTS) Refer to Response to EOE-051,
Att.1. Explain why the Company’s attachment could include multiple
vendors with an annual spend of more than $50,000 that were both exempt
from competitive bid requirements and sole source justifications. As part
of the response, specifically comment on the following examples:
a. Chris Witham Construction Services LLC;
b. Emcor Services;
c. Extra Duty Solutions; and
d. S-1 Mechanical LLC
EOE-169.
(VENDOR SPEND) Refer to Response to EOE-051, Att.1. For each of the
following vendor examples, explain what specific O&M services were
performed by the vendor during 2025. As part of the response, please
provide supporting invoices or other documentation.
a. Alden Systems Inc: $482,379.08;
b. Creative Surveying LLC: $446,773.96;
c. FirstEnergy Service Company: $1,575,775.19
EOE-170.
(VENDOR SPEND) Refer to Response to EOE-051, Att.1. For each of the
following vendor examples, explain how it was possible for both the 2025
O&M and 2025 storm costs to have reported the same amounts. As part of
the response, please provide supporting invoices or other documentation.
a. Atlantic Power Constructors, LLC: $433,860.66;
b. Jalbear Brothers Inc.: $578,124.65;
c. Quanta Infrastructure Solutions Group: $323,805.30.
As listed on the current system
Interrogs from PURA/EOE to CL&P 158 thru 170-Issued 09/03/2026 [26-05-10]