STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
September 3, 2026
In reply, please refer to:
Docket No. 26-05-10
Vincent Pace, Esq.
Assistant General Counsel
Eversource Energy Service Company
P.O. Box 270
Hartford, CT 06141
Re: Docket No. 26-05-10 – Application of The Connecticut Light and Power Company
d/b/a Eversource Energy to Amend its Rate Schedules
Dear Attorney Pace:
Enclosed are interrogatories numbered RRU-21 through RRU-26 directed to
The Connecticut Light and Power Company d/b/a Eversource Energy (Company) and
refer to the Company’s request to amend its rate schedules.
The responses to these questions have been deemed necessary by the Public
Utilities Regulatory Authority (Authority) in connection with the above-referenced docket
and will become a part of the record in this proceeding. Please note that persons
responsible for responses must be available for cross-examination during a hearing, if
held, and must attest to the truth and accuracy of their responses.
Please submit the responses to the Authority’s Executive Secretary no later than
September 18, 2026, at 4:00 p.m. The Authority encourages the submission of
responses as soon as they are available rather than delaying until all answers are
completed. Please list each question and answer on the same sheet of paper
using a separate sheet for each interrogatory number, and sequentially number
the pages of each response (e.g., p. 1 of 5, etc.). At the top of each page, clearly
identify the Docket Number, the interrogatory number (including the prefix), the
name of the company and the person responsible for the response, and the date
of submission.
Similarly, each Late Filed Exhibit that may be submitted after hearing in this
docket shall be sequentially numbered and identified with the Docket Number, Late
Filed Exhibit Number, page number, the name of the company and the person
responsible for the exhibit, and the date of submission.
If a response to any of the requested information has already been filed in response
to another Parties’ interrogatory(ies) in this proceeding, please reference the interrogatory
which provides the information. It is the respondent’s responsibility to ensure that any
such information is on file with the Executive Secretary of the Authority.
ELECTRONIC SUBMISSION OF FILINGS
IMPORTANT NOTE: The Authority has indefinitely suspended the paper
copy filing requirement. Anyone filing material with the Authority should file only
an electronic copy through the PURA Web Filing System. Please refer to the
Electronic Filing webpage for more information, including on confidential
materials: Make An Electronic Filing
CONFIDENTIAL DOCUMENTS
No confidential material may be filed publicly through the web filing system.
Confidential material can be filed electronically by emailing the material to
[email removed] with a subject line labeled in all capital letters “CONFIDENTIAL
MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic
confidential information shall also contain a header “CONFIDENTIAL – NOT FOR
PUBLIC DISCLOSURE.” The motion for a protective order shall be filed electronically.
The Authority operates with the strong presumption that all documents filed with it
are public records subject to the right of public inspection and copying in accordance with
the Connecticut Freedom of Information Act, Conn. Gen. Stat. §1-200 et. seq. In those
exceptional circumstances where a participant believes that information it intends to file
is confidential under law, it may file a Motion for a Protective Order requesting an
exemption from public disclosure. The Motion must provide specific legal arguments with
reference to state or federal law describing with supporting facts why the information
should be kept confidential. A certified affidavit supplied by a competent witness in
support of the Motion must be appended to the Motion. The Authority will rule on the
Motion forthwith, and it will give further direction as necessary.
The current service list for this docket is available on the Authority's website
located at http://www.dpuc.state.ct.us/DPUCPublicList.NSF.
By the Direction of the Authority,
PUBLIC UTILITIES REGULATORY AUTHORITY
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Enclosure
cc:
Service List
DOCKET NO. 26-05-10
APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A
EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES
Interrogatories RRU-21 through RRU-26 are directed to The Connecticut Light and Power
Company (CL&P or Company) and refer to request to amend rate schedules (Application).
RRU-021 (CIVIC AND COMMUNITY RELATED ACTIVITIES) Application, Ex. CLP-RevReq-2,
Sch. G-2.9.
a. The schedule indicates that the amounts are rounded to thousands of dollars.
Confirm that is true.
b. Provide, in an unlocked Excel spreadsheet with formulas intact, the specific expense
amounts for the employee volunteer expense broken down by: (i) C schedule(s) and
line item and (ii) CL&P employees and (ii) parent and affiliate employees charging
this time to CL&P.
c. Describe the process used to determine the amounts of individual employee time,
including the computation of any overhead amounts applied to the employee time.
RRU-022 (PUBLIC AND CORPORATE RELATIONS EXPENSE) Application, Ex. CLP-RevReq2, Sch. G-2.10.
a. Is the Annual Report to Stockholders and the Annual Meeting that of the Company?
If not, for which entity or entities are these items?
b. Are these charges direct charges to the Company or are they a result of allocations?
If they are a result of allocations, provide the total cost for these items and show
each separate entity’s share of the total cost. Additionally, provide the basis for the
allocation of these costs.
c. Provide the amount of these costs that are included in the proposed revenue
requirement and the specific schedules with line numbers and amounts where any
such costs are reflected.
d. Provide detailed explanations for why these stockholders’ related expenses are
necessary for the provision of utility services.
RRU-023 (SERVICE CONTRACT CHARGES FROM ASSOCIATED COMPANIES) Application,
Ex. CLP-RevReq-2, Sch. G-2.16.
a. The total of the Operation Expenses and Maintenance (O&M) Expenses billed from
Eversource Energy Service Company (EESCO) to the Company totals
$221,702,000. Of this total, how much has been included in the test year O&M
Expense of $451,957,000 as shown on Schedule C-2.0?
b. Provide a breakdown of the total O&M expenses billed to the Company from EESCO
and included in the test year O&M expense by both account and by revenue
requirement schedule.
RRU-024 (VEHICLE EXPENSE) Application, Ex. CLP-RevReq-2, Sch. WP C-3.32.
a. Explain the ($2,598,000) and ($88,000) pro forma adjustments for Labor and
Outside Services expenses shown on lines 22and 32, respectively.
b. Explain how the Rate Year 1 Depreciation adjustment of $3,737,000 was calculated.
c. Explain the Other Vehicle expenses credit of $522,000 shown on Line 31.
d. In an unlocked Excel spreadsheet with formulas intact, provide the historical
amounts for each line item shown, excluding labor, for the years 2020 through 2025.
RRU-025 (MATERIALS AND SUPPLIES) Application, Ex. CLP-RevReq-2, Sch. WP C-3.21.
a. Confirm that the Rate Year 1 adjustment shown on this schedule is entirely due to
an inflation factor being applied to the test year amount. If that is not the case, fully
explain what the adjustment is for.
b. Provide annual historical amounts for the years 2020 through 2025.
c. Describe the items that are expensed in this account and contrast that with materials
and supplies that are capitalized.
RRU-026 (DEFERRED EXPENSES) Provide a complete list of expected expenses for which the
Company is seeking preliminary authorization for deferred accounting treatment.
As listed on the current system