Interrogatory responses
Answers to questions 288, 289, 291, 292, 297, 300
Files10
EOE-288_Final.pdf
PDF · 90 KB · 1 pageText searchable
Download EOE-288_Final.pdfRead the text of EOE-288_Final.pdf
EOE-289_Final.pdf
PDF · 142 KB · 2 pagesText searchable
Download EOE-289_Final.pdfRead the text of EOE-289_Final.pdf
EOE-291_Final.pdf
PDF · 117 KB · 2 pagesText searchable
Download EOE-291_Final.pdfRead the text of EOE-291_Final.pdf
EOE-291 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-291 Attachment 1 REDACTED.pdfRead the text of EOE-291 Attachment 1 REDACTED.pdf
EOE-291 Attachment 2 REDACTED.pdf
PDF · 758 KB · 2 pagesNo text in this file
EOE-292_Final.pdf
PDF · 176 KB · 3 pagesText searchable
Download EOE-292_Final.pdfRead the text of EOE-292_Final.pdf
EOE-292 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-292 Attachment 1 REDACTED.pdfRead the text of EOE-292 Attachment 1 REDACTED.pdf
EOE-297_Final.pdf
PDF · 88 KB · 1 pageText searchable
Download EOE-297_Final.pdfRead the text of EOE-297_Final.pdf
EOE-300_Final.pdf
PDF · 178 KB · 3 pagesText searchable
Download EOE-300_Final.pdfRead the text of EOE-300_Final.pdf
EOE-300 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-300 Attachment 1 REDACTED.pdfRead the text of EOE-300 Attachment 1 REDACTED.pdf
Page 1 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 1 of 24 EVERSOURCE ENERGY SERVICE COMPANY (“Owner”) EXHIBIT B - PRICING SCHEDULE The provisions of this Pricing Schedule shall control in the event of a conflict with any pricing provisions of any other Contract Documents; provided that the pricing and/or methodologies set forth in this Schedule shall not modify, reduce or otherwise affect in any manner whatsoever Contractor's obligation to perform the Work as described in the Contract Documents. This Pricing Schedule shall govern the pricing of all Work that is awarded on a firm fixed price, unit price, or time and material basis whether submitted by Contractor and/or any Subcontractors (including any and all other lower tier sub-Subcontractors) and establishes guidelines for the reimbursement of ordinary, necessary and reasonable business expenses incurred by Contractor. In Owner’s sole discretion for each project, Owner may identify specific line items or categories (e.g. mobilization, demobilization, weather, rock/ledge, soil removal) to be invoiced on any combination of firm fixed price, unit price, or time and material pricings 1. FIRM FIXED PRICE For Work performed on a firm fixed price basis, the Contractor agrees that such Work will be billed at the firm fixed price as set forth in Appendix PS-1 PRICING SCHEDULE - FIRM FIXED PRICE or in the applicable Work Release or Project-Specific Agreement. The firm fixed price is all inclusive and includes all applicable taxes, benefits, insurance, general administrative overheads, senior management charges, profit, and all direct and indirect costs set forth in Appendix PS-3 COSTS INCLUDED WITHIN PRICING SCHEDULES or in the applicable Scope of Work document. Costs as set forth in Appendix PS-4 NON REIMBURSABLE COSTS or the applicable Scope of Work are not billable. For Change Orders, Contractor will submit a properly itemized proposal covering the additional Work and/or the Work to be deleted in accordance with Article 15 of this Agreement. The pricing methodology for proposed change shall be determined by Owner. Unless otherwise set forth in the applicable Work Release, Project-Specific Agreement and/or Change Order, a Project priced on a firm fixed price basis shall be billed in full at Final Acceptance of such Project. Contingency must be identified for a specific Scope of Work and at a defined price or pricing methodology. At Owner’s discretion “contingency can be quoted on a percentage basis. 2. UNIT PRICE For Work performed on a unit price basis, the Contractor agrees that such Work will be billed at the units set forth in Appendix PS-2 PRICING SCHEDULE - UNIT PRICE or in the applicable Work Release or Project Specific Agreement. Such units will remain firm through the duration of this Agreement. All unit prices are all inclusive and include all applicable taxes, benefits, EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 2 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 2 of 24 insurance, general administrative overheads, senior management charges, profit, and all direct and indirect costs set forth in Appendix PS-3 COSTS INCLUDED WITHIN PRICING SCHEDULES or in the applicable Scope of Work. Costs as set forth in Appendix PS-4 NON REIMBURSABLE COSTS or the applicable Scope of Work are not billable. Unless specifically identified as a separate unit in the Work Release or the Project-Specific Agreement, costs associated with mobilization, site establishments and demobilization shall be included in the unit prices. 3. TIME AND MATERIAL For Work performed on a time and material basis, the Contractor agrees that such Work will be billed at the rates set forth in Appendix PS-6 PRICING SCHEDULE - T&M and shall be based on the following conditions: 3.1. All rates are all inclusive and include all applicable payroll taxes, benefits, insurance, general administrative overheads, senior management charges, profit, small tools, expendables, consumables and all direct and indirect costs set forth in Appendix PS-3 COSTS INCLUDED WITHIN PRICING SCHEDULES or the applicable Scope of Work document. Costs as set forth in Appendix PS-4 NON REIMBURSABLE COSTS or the applicable Scope of Work document are not billable. Only job titles as set forth in this Appendix PS-6 PRICING SCHEDULE - T&M shall be billable. If any Work involves job classifications or equipment not specifically set forth in the appendix such rates shall be submitted to Owner for approval prior to the start of Work and the job classifications or equipment will be added to Appendix PS-6. 3.2 Rates shown in Appendix PS-6 PRICING SCHEDULE – T&M will be in effect for the duration of the Agreement and effected dates shall be dictated by the Terms as listed in the Appendix PS-6 PRICING SCHEDULE – T&M. 3.3. Labor. If any Services using time and material prices, in whole or in part, involves labor not specifically addressed in the unit pricing established pursuant to Section 3 of this Pricing Schedule, the hourly labor rates set forth in PRICING SCHEDULE - T&M attached to this Agreement shall be used for pricing labor. Labor charges shall commence at the designated time for departure from, or commencement of Work at, the show-up site (which may be the job site) for the applicable Work; provided that if Contractor arrives late to the show-up site, such charges shall commence at the time that Contractor is prepared to leave the show-up site and/or commence such Work. Rate classifications are as follows: (a) "Straight Time" is defined as the first eight (8) hours of Work in a work day, or up to ten (10) hours of Work when working on a four 10/hour per day per work week typically beginning on a Monday (up to 10 hours per day, between the hours of 6am - 6pm), as determined by the Owner Representative for the affected Project. EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 3 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 3 of 24 (b) "Overtime" (time-and-one-half) is defined as time worked, scheduled or unscheduled, after the Straight Time hours. (c) "Double Time" applies to Sundays and Holidays when requested to Work by the Owner Representative for the affected Project, however, Holidays worked as Make-Up Days shall not be billed as Double Time but instead shall be billed as Straight Time; (d) “Standby Charges” for labor, applies to allowed charges on an hourly basis (if no unit price is provided in the Project-Specific Agreement or Work Release) under the following conditions (“Standby Conditions”): 1. Storm response at any other Owner Site 2. Emergent response at any other Owner Site 3. Owner-caused delay such as switching/ground changes or changes to Owner’s outage schedules 4. Owner-caused delay, e.g., government authorizations. During such Standby Conditions the Contractor shall take reasonable steps to mitigate the costs of such standby such as reassigning the work force to other Sites. For all Standby Conditions, Contractor shall provide advanced notice to the Owners Representative of any intention to bill for Standby Charges due to any of the Standby Conditions. In all cases, Owner-authorized time sheets shall be required; such Standby Charges shall not exceed eight (8) hours in a single workday; and Standby rates shall be billed as set forth in Appendix PS-5 – DIRECT, INCREMENTAL COST(S). Standby Charges will not be allowed in cases where Contractor abandons the Site to support a storm/emergent event on facilities other than for Owner. Standby Charges shall be limited to seven (7) calendar days. Any extension beyond seven (7) days requires advanced written approval of Owner. (e) Unless otherwise expressed in Section 4 of the PRICING SCHEDULE, in the Agreement Documents or based on advanced written approval by the Owners Representative for extreme circumstances, per diems are not allowed for Work performed on a T&M basis. provided that for Storm Work, the Overtime and Double Time rate classifications shall apply in accordance with Section 3 of this Pricing Schedule irrespective of hours worked by Contractor. Notwithstanding anything to the contrary in the Contract Documents, Contractor shall perform Work using Overtime and/or Double Time rates only after written authorization by the Owner Representative for the affected Project, which may be granted or withheld in such Owner Representative's sole discretion, or as required by Law, and in such authorized cases, applicable Overtime and Double Time rates shall be used for Contractor's non-exempt personnel. Double Time billing rates for Holidays EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 4 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 4 of 24 shall only apply to Holidays designated in this Agreement. Contractor shall not be reimbursed for Holidays beyond the hours actually worked by Contractor's personnel. No reimbursement will be made for Holidays not worked. Owner shall not be billed for Contractor's holidays. Contractor shall not be entitled to premium time quoted, estimated and/or otherwise anticipated, but not actually worked. The labor prices contained in PRICING SCHEDULE - T&M have been calculated consistent with the methodologies set forth in cost-plus pricing methodologies in Section 3 of this Pricing Schedule, and any labor rates not identified in PRICING SCHEDULE T&M shall be established consistent with such methodology. 3.4. Equipment. If any Services using time and material prices, in whole or in part, involves equipment not specifically addressed in the unit pricing established pursuant to Section 3 of this Pricing Schedule, the equipment rates set forth in PRICING SCHEDULE - T&M attached to this Agreement shall be used for pricing equipment. Hourly equipment rental rates shall be the applicable weekly rate divided by 40. Equipment rates shall be used only if Contractor mobilizes equipment to a Site, and such equipment is maintained in operating condition. Costs for labor associated with the operation of such equipment are not included in such equipment rates, and shall be determined in accordance with Section 3.3 of this Pricing Schedule. Equipment prices will apply without increase or other modification for use with Overtime and/or Double Time labor. The aggregate equipment charges for any single piece of Contractor-owned equipment used in all Work shall be limited to the fair market value of the piece of equipment when the first Work is priced involving usage of such piece of equipment. The equipment prices contained in PRICING SCHEDULE - T&M have been calculated consistent with the methodologies set forth in cost-plus pricing methodologies in Section 3 of this Pricing Schedule, and any equipment rates not identified in PRICING SCHEDULE - T&M (including rental equipment) shall be established consistent with such methodology; provided that fuel, insurance, depreciation, overhead, profit and all costs associated with the operation and maintenance of that equipment in good working order on the job have been (and will be) included in the equipment rates. 3.5. Major Equipment. Allowable costs may include appropriate amounts for Major Equipment (tools and equipment with an individual purchase cost of more than specifically needed and used for Work performed on a cost-plus basis. For Contractor-owned equipment, allowable "bare" equipment rates shall be the weekly rate listed in the most current publication of The Primedia Blue Book divided by 40 to arrive at a maximum allowable hourly rate to be applied to the actual hours of equipment usage. Notwithstanding anything to the contrary in this Pricing Schedule, for Contractor-owned equipment, the aggregate equipment charges for any single piece of equipment used for Work (however priced) shall be limited to the fair market value of the piece of equipment. If Contractor requires rental equipment, Contractor shall obtain the prior approval of the applicable Owner Representative before renting such equipment, and the allowable costs for such rented equipment shall not exceed the EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 5 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 5 of 24 applicable State of Connecticut rates listed in the most current publication of The Primedia Blue Book. 3.6. Standby Charges. Standby Charges for major equipment shall be included in actual costs only if Contractor mobilizes such equipment to the Site consistent with the Work Schedule, such equipment is maintained in operating condition, and the Owner's Representative directs Contractor not to use such major equipment as a result of any of the Standby Conditions detailed in Section 3 in PRICING SCHEDULE. Standby rates shall be billed as set forth in Appendix PS-5 – DIRECT, INCREMENTAL COST(S). 3.7. Materials. Time and material prices for any materials supplied by Contractor in accordance with Section 9.1(a) of this Agreement shall be based on the cost of such materials (determined in accordance with Section 3), plus the Mark-Up Percentage Fee for materials (as set forth in PRICING SCHEDULE - T&M attached to this Agreement). 3.8. Not-to-Exceed. If specified in a Work Release, Project Specific Agreement and/or any Change Order, unless Owner initiates a Change Order, Contractor's charges for all or a portion of Services using time and material pricing shall not exceed a maximum amount established by the Parties, and Owner shall not be liable for any charge in excess of such maximum. 3.9. Additional Fixed Rates. All time and material rates listed in this Pricing Schedule shall remain firm through the applicable period set forth in the PRICING SCHEDULE - T&M referenced in this Section 3. Thereafter, in the event Contractor desires to modify such rates for a subsequent rate period, or to add compensable Services not identified in the Pricing Schedule, Contractor shall submit a proposal to Owner containing fixed rates for a period of not less than twelve (12) months from the applicable effective date for: (a) compensable Services not identified in this Pricing Schedule; and/or (b) the period after the expiration of the last Term ("Last Rate Period") for the applicable Service identified in this Pricing Schedule. (c) The Parties shall negotiate each such proposal in good faith, and acceptance thereof shall be evidenced by an additional rate schedule for the applicable rate period signed by both Parties that shall be appended to, and automatically constitute a part of, this Pricing Schedule. 3.10. Notwithstanding anything to the contrary in the Contract Documents, Contractor shall bill the Owner Overtime and/or Double Time rates only after written authorization by the Owner's Representative, which may be granted or withheld in the EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 6 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 6 of 24 Owner's Representative's sole and exclusive discretion. Contractor shall not charge an extra or otherwise impose any premium for shift or night work. No payment will be made for holidays not worked. Daily time sheets with names of all Contractor's employees working on the Project and the paid hours worked by Contractor's employees will be required to be submitted to Owner for both labor and equipment used by Contractor for the relevant time periods. 3.11. Intentionally omitted 3.12. Contingency must be identified for a specific Scope of Work and at a defined price or pricing methodology. At Owner’s discretion “contingency can be quoted on a percentage basis. 3.13. Markup Percentage Fee. 3.13.1. The mark-ups (each a "Markup Percentage Fee") set forth in PRICING SCHEDULE - T&M attached to this Pricing Schedule shall apply to compensation based on a cost recovery basis. Unless the Parties establish a lower mark-up in a Work Release or Project Specific Agreement for cost-based pricing, the Markup Percentage Fee set forth in PRICING SCHEDULE - T&M shall apply to each Project. The Markup Percentage Fee shall be a single markup as set forth in PRICING SCHEDULE - T&M applied to the net direct cost (excluding taxes and reimbursable costs); provided that that neither Contractor, nor any Subcontractor (at any tier) shall be entitled to, or otherwise receive any Markup Percentage Fee with respect to equipment. To the extent that any charges by any Subcontractor(s) (including any Work performed by lower tier contractors) include any cost-based pricing, the aggregate markup charged to, and paid by, Owner shall be the Markup Percentage Fee set forth in PRICING SCHEDULE - T&M as applied to the original cost; accordingly, such Subcontractor(s) shall not markup such costs, and Contractor and such Subcontractor(s) shall address the sharing of that single, combined fee in the applicable subcontract(s). Notwithstanding anything to the contrary in this Pricing Schedule, Contractor shall not include or otherwise impose on Owner any handling charge and/or percentage mark-up for the premium portion of any service, procurement or other Work. The foregoing pricing limitations shall apply equally to any and all subcontracting undertaken, at any tier, by, and/or on behalf of, any Subcontractor. 3.13.2. Without limiting the generality of the foregoing, for Owner-authorized change order Work that is performed and billed on a T&M basis, the agreed upon Markup Percentage Fee for all labor is intended to cover Contractor's profit and all indirect costs associated with such Work. Items intended to be covered by the Markup Percentage Fee include: home office expenses, branch office and field office overhead expense of any kind; project management; EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 7 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 7 of 24 superintendents, general foremen; estimating, engineering; coordinating; expediting; purchasing; detailing; legal, accounting, data processing or other administrative expenses; shop drawings; Permits; auto insurance and umbrella insurance; warranty expense costs and all other costs identified on Appendix PS-3 COSTS INCLUDED WITHIN PRICING SCHEDULES . The Markup Percentage Fee also covers the cost for the use of small tools (tools and equipment (power or non-power) with an individual purchase cost of less than . 4. PRICING DURING CERTAIN WORK CONDITIONS 4.1. Intentionally omitted 4.2. Inclement Weather Work. Contractor shall be responsible for ensuring safe working conditions for its workers. If Contractor has agreed to perform any Inclement Weather Work using time and material rates, Owner will pay for such labor at the rates already in effect at the time; provided that: (a) Contractor will be paid for labor only for two (2) hours at Straight Time rates by Owner for line workers reporting for Work and, because of inclement weather conditions, are determined by agreement between the applicable Owner Representative and the Contractor Representative to be unable to work; or (b) if inclement weather interferes with Work after the workers have begun such Work as determined by agreement between the applicable Owner Representative and the Contractor Representative, Owner will pay, at Straight Time rates, for the greater of four (4) hours or the actual hours worked for both labor and associated equipment directly associated with such affected Work. 4.3. Trouble/Non-Storm Work. When the Contractor's employees are directed by an Owner Representative perform Trouble/Non-Storm Work during Normal Working Hours, Contractor shall bill the Straight Time rate. If Contractor's employees perform Trouble/Non-Storm Work that persist outside of Normal Working Hours, Contractor shall bill the Overtime rate for such portion of such Trouble/Non-Storm Work, except Contractor shall bill Double Time rates for any portion of Trouble/Non-Storm Work that occurs on Sundays and Holidays. For Trouble/Non-Storm Work, Owner shall pay Contractor for the greater of two (2) hours or actual time worked. Owner shall pay travel time to the applicable Site at the same rate as paid for the related Trouble/NonStorm Work time. Contractor shall use its best efforts to assign crews residing in the State in which the Trouble/Non-Storm Work will be performed before calling in crews from other States in order to minimize initial travel time. Trouble/Non-Storm Work shall not be priced using the firm fixed price methodology. Contractor shall submit time sheets for Trouble/Non-Storm Work to the Owner Representative for review and approval, which, once approved, shall constitute the Work Release for such Trouble/Non-Storm Work. Contractor shall invoice Owner upon completion of the Trouble/Non-Storm Work, unless such Trouble/Non-Storm Work assignment extends EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 8 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 8 of 24 beyond two weeks, in which case, Contractor may bill every two weeks; provided that Contractor has submitted, and the Owner Representative has approved, the time sheets that support any such invoice. "Normal Working Hours" shall be 6:00 a.m. to 6:00 p.m.; ten (10) hours per day for four (4) days a week; or eight (8) hours per day for five (5) days a week, as determined at Owner's discretion, Monday through Friday. 4.4. Emergency Response Work. (a) Owner shall compensate Contractor for Emergency Response Work assigned to Contractor based on Contractor’s applicable Emergency Response rates from the commencement of such Emergency Response Work at the Site through the termination of Emergency Response Work at the Site, excluding rest time during that period. Emergency Response rates for labor shall be rates equal to the Double Time Rates set forth in Appendix PS-6 PRICING SCHEDULE T&M. Unless otherwise approved by the applicable Owner Representative, employee work hours for Emergency Response Work shall be limited to sixteen (16) continuous hours with eight (8) hours of rest before returning to work. Contractor shall invoice Owner upon completion of Emergency Response Work, unless such Emergency Response Work assignment extends beyond two (2) weeks, in which case Contractor may invoice Owner every two (2) weeks. Contractor's invoices for Emergency Response Work shall be accompanied by time sheets and receipts for reimbursable expense items for the period covered that have been approved by the applicable Owner Representative. (b) Unless otherwise agreed in advance and in writing by Owner and Contractor, Owner will provide meals, lodging and all necessary supplies and materials (but not tools or safety equipment or clothing) for Contractor's personnel performing Emergency Response Work while they are at the Site or upon arrival to Owner-designated onboarding site. If it is more efficient for Contractor's personnel to obtain meals that are not Owner-provided, Owner shall, if the applicable Owner Representative has approved such alternative arrangement, reimburse Contractor with no markup for the reasonable cost of such meals, provided that Contractor submits itemized and signed receipts covering such expenses. (c) For purposes of this Paragraph 4.4, the following capitalized terms shall have the following definitions: 'Travel per diem: Lodging' is the per diem reimbursement for lodging applicable to Contractor's personnel, located outside of Owner's service territory in which Emergency Response Work is to be performed for the period that Contractor is compensated for such personnel at the Travel Time Rates for Labor. To calculate the ‘Travel per diem: Lodging’, the total number of hours (rounded to the nearest whole number) (including rest time) reasonably necessary for Contractor Resources to travel the distance each way between the Contractor EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 9 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 9 of 24 Resources deployment location of Contractor's personnel and the Site or onboarding site designated by Owner (if Contractor personnel are to travel to such onboarding site first) shall be divided by 24 and rounded to the nearest whole number. This whole number then shall be multiplied by the per diem rate of per person. 'Travel per diem: Meals' is the per diem reimbursement for meals applicable to Contractor's personnel located outside of Owner's service territory in which Emergency Response Work is to be performed for the period that Contractor is compensated for such personnel at the Travel Time Rates for Labor. To calculate the ‘Travel per diem: Meals’, the total number of hours (rounded to the nearest whole number) (including rest time) reasonably necessary for Contractor's personnel to travel the distance each way between the deployment location of Contractor's personnel and the Site or onboarding site designated by Owner (if Contractor personnel are to travel to such onboarding site first) shall be divided by 24 and rounded to the nearest whole number. This whole number then shall be multiplied by the per diem rate of per person. 'Travel Time Rates for Labor' are the rates applicable for travel time expended by Contractor's personnel located outside of Owner's service territory in which Emergency Response Work is to be performed, calculated based upon the following: (d) • Reasonable time necessary to travel the distance from the deployment location of Contractor's personnel to the Site or onboarding site designated by Owner, as applicable; and • Reasonable time necessary to travel the distance from the Emergency Response Work completion location to the deployment origin of Contractor's personnel. Travel Time Rates for Labor shall be as follows: (i) If at the time Owner requires Emergency Response Work, the responding Contractor personnel are located outside of Owner's service territory in which Emergency Response Work is to be performed (the "Normal Work Location"), Travel Time Rates for Labor for travel time for Contractor personnel to and from the Site or onboarding site designated by Owner shall be compensated at Overtime Rates, as specified in Appendix PS-6 PRICING SCHEDULE - T&M; or (ii) If at the time Owner requires Emergency Response Work, Contractor is performing Work at a Site located within Owner's service territory in which Emergency Response Work is to be performed (the "Normal Work Location"), travel to and from the Site or onboarding site EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 10 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 10 of 24 designated by Owner, as applicable, for Emergency Response Work shall be compensated at Straight Time, as specified in Appendix PS-6 PRICING SCHEDULE - T&M; provided, that if Owner requires travel outside of Normal Work Hours (as defined in Section 3 of the Pricing Schedule), to the extent travel distance from Contractor's facility is greater than travel to the Normal Work Location, Travel Time Rates for Labor shall be equal to Overtime Rates, as specified in Appendix PS-6 PRICING SCHEDULE - T&M. During Normal Working Hours, Owner may require Contractor to report to a show up location in anticipation of performing Emergency Response Work. Travel to and from the show up location shall be compensated as provided for above. Contractor will be paid its standard labor and equipment rates for the period of time that labor and equipment is held at the show up location. (e) Equipment Rates: Equipment Rates for Emergency Response Work shall be at the rates set forth in Appendix PS-6 PRICING SCHEDULE - T&M. All maintenance, fuel, delivery, and other charges associated with the equipment shall be included in the Emergency Response Rates for Equipment. If Owner provides any fuel, Contractor shall reimburse Owner for such fuel costs and at Owner’s option, Owner may either invoice Contractor for such fuel costs or the cost of such fuel may be deducted from Contractor’s invoice amount for Emergency Response Work. (f) Reimbursable Expenses: Unless otherwise agreed to in writing by Owner, all of Contractor’s reimbursable expenses shall be compensated by Owner paying the 'Travel per diem: Meals' and 'Travel per diem: Lodging' amounts calculated as provided above. Unless otherwise agreed to in writing by Owner, all of Contractor's reimbursable expenses are accounted for in the 'Travel per diem: Meals', 'Travel per diem: Lodging' and rates for Equipment set forth above, including Contractor's meals, lodging, fuel, tolls and other travel-related expenses incurred by Contractor during Emergency Response Work mobilization and de-mobilization. (g) If the Contractor requires lodging while performing Emergency Response Work and is located within the Owner’s service territory and Contractor is required to pay for lodging because the Owner did not pay, Contractor will be reimbursed at the 'Travel per Diem: Lodging' rate as listed above. Provided the Owner agrees in writing, when the Contractor requires a meal the Owner does not provide to the Contractor while performing Emergency Response Work and the Contractor is located within the Owner’s service territory, Owner will reimburse Contractor per meal, up to two meals per day or per day for more than two meals per day. In no event shall Owner reimburse Contractor EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20
Text of EOE-292_Final.pdf
Extracted from the file · 3 pages · 7,800 characters
Text of EOE-292 Attachment 1 REDACTED.pdf
Extracted from the file · 24 pages, 2 without text · 56,405 characters
Text of EOE-297_Final.pdf
Extracted from the file
Text of EOE-300_Final.pdf
Extracted from the file · 3 pages · 9,650 characters
Text of EOE-300 Attachment 1 REDACTED.pdf
Extracted from the file · 24 pages, 2 without text · 56,398 characters
As listed on the current system
Question(s) Answered 288, 289, 291, 292, 297, 300 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026