Interrogatory responses
Answers to questions 288, 289, 291, 292, 297, 300
Files10
EOE-288_Final.pdf
PDF · 90 KB · 1 pageText searchable
Download EOE-288_Final.pdfRead the text of EOE-288_Final.pdf
EOE-289_Final.pdf
PDF · 142 KB · 2 pagesText searchable
Download EOE-289_Final.pdfRead the text of EOE-289_Final.pdf
EOE-291_Final.pdf
PDF · 117 KB · 2 pagesText searchable
Download EOE-291_Final.pdfRead the text of EOE-291_Final.pdf
EOE-291 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-291 Attachment 1 REDACTED.pdfRead the text of EOE-291 Attachment 1 REDACTED.pdf
EOE-291 Attachment 2 REDACTED.pdf
PDF · 758 KB · 2 pagesNo text in this file
EOE-292_Final.pdf
PDF · 176 KB · 3 pagesText searchable
Download EOE-292_Final.pdfRead the text of EOE-292_Final.pdf
EOE-292 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-292 Attachment 1 REDACTED.pdfRead the text of EOE-292 Attachment 1 REDACTED.pdf
EOE-297_Final.pdf
PDF · 88 KB · 1 pageText searchable
Download EOE-297_Final.pdfRead the text of EOE-297_Final.pdf
EOE-300_Final.pdf
PDF · 178 KB · 3 pagesText searchable
Download EOE-300_Final.pdfRead the text of EOE-300_Final.pdf
EOE-300 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-300 Attachment 1 REDACTED.pdfRead the text of EOE-300 Attachment 1 REDACTED.pdf
Page 5 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 5 of 24 applicable State of Connecticut rates listed in the most current publication of The Primedia Blue Book. 3.6. Standby Charges. Standby Charges for major equipment shall be included in actual costs only if Contractor mobilizes such equipment to the Site consistent with the Work Schedule, such equipment is maintained in operating condition, and the Owner's Representative directs Contractor not to use such major equipment as a result of any of the Standby Conditions detailed in Section 3 in PRICING SCHEDULE. Standby rates shall be billed as set forth in Appendix PS-5 – DIRECT, INCREMENTAL COST(S). 3.7. Materials. Time and material prices for any materials supplied by Contractor in accordance with Section 9.1(a) of this Agreement shall be based on the cost of such materials (determined in accordance with Section 3), plus the Mark-Up Percentage Fee for materials (as set forth in PRICING SCHEDULE - T&M attached to this Agreement). 3.8. Not-to-Exceed. If specified in a Work Release, Project Specific Agreement and/or any Change Order, unless Owner initiates a Change Order, Contractor's charges for all or a portion of Services using time and material pricing shall not exceed a maximum amount established by the Parties, and Owner shall not be liable for any charge in excess of such maximum. 3.9. Additional Fixed Rates. All time and material rates listed in this Pricing Schedule shall remain firm through the applicable period set forth in the PRICING SCHEDULE - T&M referenced in this Section 3. Thereafter, in the event Contractor desires to modify such rates for a subsequent rate period, or to add compensable Services not identified in the Pricing Schedule, Contractor shall submit a proposal to Owner containing fixed rates for a period of not less than twelve (12) months from the applicable effective date for: (a) compensable Services not identified in this Pricing Schedule; and/or (b) the period after the expiration of the last Term ("Last Rate Period") for the applicable Service identified in this Pricing Schedule. (c) The Parties shall negotiate each such proposal in good faith, and acceptance thereof shall be evidenced by an additional rate schedule for the applicable rate period signed by both Parties that shall be appended to, and automatically constitute a part of, this Pricing Schedule. 3.10. Notwithstanding anything to the contrary in the Contract Documents, Contractor shall bill the Owner Overtime and/or Double Time rates only after written authorization by the Owner's Representative, which may be granted or withheld in the EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 6 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 6 of 24 Owner's Representative's sole and exclusive discretion. Contractor shall not charge an extra or otherwise impose any premium for shift or night work. No payment will be made for holidays not worked. Daily time sheets with names of all Contractor's employees working on the Project and the paid hours worked by Contractor's employees will be required to be submitted to Owner for both labor and equipment used by Contractor for the relevant time periods. 3.11. Intentionally omitted 3.12. Contingency must be identified for a specific Scope of Work and at a defined price or pricing methodology. At Owner’s discretion “contingency can be quoted on a percentage basis. 3.13. Markup Percentage Fee. 3.13.1. The mark-ups (each a "Markup Percentage Fee") set forth in PRICING SCHEDULE - T&M attached to this Pricing Schedule shall apply to compensation based on a cost recovery basis. Unless the Parties establish a lower mark-up in a Work Release or Project Specific Agreement for cost-based pricing, the Markup Percentage Fee set forth in PRICING SCHEDULE - T&M shall apply to each Project. The Markup Percentage Fee shall be a single markup as set forth in PRICING SCHEDULE - T&M applied to the net direct cost (excluding taxes and reimbursable costs); provided that that neither Contractor, nor any Subcontractor (at any tier) shall be entitled to, or otherwise receive any Markup Percentage Fee with respect to equipment. To the extent that any charges by any Subcontractor(s) (including any Work performed by lower tier contractors) include any cost-based pricing, the aggregate markup charged to, and paid by, Owner shall be the Markup Percentage Fee set forth in PRICING SCHEDULE - T&M as applied to the original cost; accordingly, such Subcontractor(s) shall not markup such costs, and Contractor and such Subcontractor(s) shall address the sharing of that single, combined fee in the applicable subcontract(s). Notwithstanding anything to the contrary in this Pricing Schedule, Contractor shall not include or otherwise impose on Owner any handling charge and/or percentage mark-up for the premium portion of any service, procurement or other Work. The foregoing pricing limitations shall apply equally to any and all subcontracting undertaken, at any tier, by, and/or on behalf of, any Subcontractor. 3.13.2. Without limiting the generality of the foregoing, for Owner-authorized change order Work that is performed and billed on a T&M basis, the agreed upon Markup Percentage Fee for all labor is intended to cover Contractor's profit and all indirect costs associated with such Work. Items intended to be covered by the Markup Percentage Fee include: home office expenses, branch office and field office overhead expense of any kind; project management; EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 7 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 7 of 24 superintendents, general foremen; estimating, engineering; coordinating; expediting; purchasing; detailing; legal, accounting, data processing or other administrative expenses; shop drawings; Permits; auto insurance and umbrella insurance; warranty expense costs and all other costs identified on Appendix PS-3 COSTS INCLUDED WITHIN PRICING SCHEDULES . The Markup Percentage Fee also covers the cost for the use of small tools (tools and equipment (power or non-power) with an individual purchase cost of less than . 4. PRICING DURING CERTAIN WORK CONDITIONS 4.1. Intentionally omitted 4.2. Inclement Weather Work. Contractor shall be responsible for ensuring safe working conditions for its workers. If Contractor has agreed to perform any Inclement Weather Work using time and material rates, Owner will pay for such labor at the rates already in effect at the time; provided that: (a) Contractor will be paid for labor only for two (2) hours at Straight Time rates by Owner for line workers reporting for Work and, because of inclement weather conditions, are determined by agreement between the applicable Owner Representative and the Contractor Representative to be unable to work; or (b) if inclement weather interferes with Work after the workers have begun such Work as determined by agreement between the applicable Owner Representative and the Contractor Representative, Owner will pay, at Straight Time rates, for the greater of four (4) hours or the actual hours worked for both labor and associated equipment directly associated with such affected Work. 4.3. Trouble/Non-Storm Work. When the Contractor's employees are directed by an Owner Representative perform Trouble/Non-Storm Work during Normal Working Hours, Contractor shall bill the Straight Time rate. If Contractor's employees perform Trouble/Non-Storm Work that persist outside of Normal Working Hours, Contractor shall bill the Overtime rate for such portion of such Trouble/Non-Storm Work, except Contractor shall bill Double Time rates for any portion of Trouble/Non-Storm Work that occurs on Sundays and Holidays. For Trouble/Non-Storm Work, Owner shall pay Contractor for the greater of two (2) hours or actual time worked. Owner shall pay travel time to the applicable Site at the same rate as paid for the related Trouble/NonStorm Work time. Contractor shall use its best efforts to assign crews residing in the State in which the Trouble/Non-Storm Work will be performed before calling in crews from other States in order to minimize initial travel time. Trouble/Non-Storm Work shall not be priced using the firm fixed price methodology. Contractor shall submit time sheets for Trouble/Non-Storm Work to the Owner Representative for review and approval, which, once approved, shall constitute the Work Release for such Trouble/Non-Storm Work. Contractor shall invoice Owner upon completion of the Trouble/Non-Storm Work, unless such Trouble/Non-Storm Work assignment extends EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 8 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 8 of 24 beyond two weeks, in which case, Contractor may bill every two weeks; provided that Contractor has submitted, and the Owner Representative has approved, the time sheets that support any such invoice. "Normal Working Hours" shall be 6:00 a.m. to 6:00 p.m.; ten (10) hours per day for four (4) days a week; or eight (8) hours per day for five (5) days a week, as determined at Owner's discretion, Monday through Friday. 4.4. Emergency Response Work. (a) Owner shall compensate Contractor for Emergency Response Work assigned to Contractor based on Contractor’s applicable Emergency Response rates from the commencement of such Emergency Response Work at the Site through the termination of Emergency Response Work at the Site, excluding rest time during that period. Emergency Response rates for labor shall be rates equal to the Double Time Rates set forth in Appendix PS-6 PRICING SCHEDULE T&M. Unless otherwise approved by the applicable Owner Representative, employee work hours for Emergency Response Work shall be limited to sixteen (16) continuous hours with eight (8) hours of rest before returning to work. Contractor shall invoice Owner upon completion of Emergency Response Work, unless such Emergency Response Work assignment extends beyond two (2) weeks, in which case Contractor may invoice Owner every two (2) weeks. Contractor's invoices for Emergency Response Work shall be accompanied by time sheets and receipts for reimbursable expense items for the period covered that have been approved by the applicable Owner Representative. (b) Unless otherwise agreed in advance and in writing by Owner and Contractor, Owner will provide meals, lodging and all necessary supplies and materials (but not tools or safety equipment or clothing) for Contractor's personnel performing Emergency Response Work while they are at the Site or upon arrival to Owner-designated onboarding site. If it is more efficient for Contractor's personnel to obtain meals that are not Owner-provided, Owner shall, if the applicable Owner Representative has approved such alternative arrangement, reimburse Contractor with no markup for the reasonable cost of such meals, provided that Contractor submits itemized and signed receipts covering such expenses. (c) For purposes of this Paragraph 4.4, the following capitalized terms shall have the following definitions: 'Travel per diem: Lodging' is the per diem reimbursement for lodging applicable to Contractor's personnel, located outside of Owner's service territory in which Emergency Response Work is to be performed for the period that Contractor is compensated for such personnel at the Travel Time Rates for Labor. To calculate the ‘Travel per diem: Lodging’, the total number of hours (rounded to the nearest whole number) (including rest time) reasonably necessary for Contractor Resources to travel the distance each way between the Contractor EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 9 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 9 of 24 Resources deployment location of Contractor's personnel and the Site or onboarding site designated by Owner (if Contractor personnel are to travel to such onboarding site first) shall be divided by 24 and rounded to the nearest whole number. This whole number then shall be multiplied by the per diem rate of per person. 'Travel per diem: Meals' is the per diem reimbursement for meals applicable to Contractor's personnel located outside of Owner's service territory in which Emergency Response Work is to be performed for the period that Contractor is compensated for such personnel at the Travel Time Rates for Labor. To calculate the ‘Travel per diem: Meals’, the total number of hours (rounded to the nearest whole number) (including rest time) reasonably necessary for Contractor's personnel to travel the distance each way between the deployment location of Contractor's personnel and the Site or onboarding site designated by Owner (if Contractor personnel are to travel to such onboarding site first) shall be divided by 24 and rounded to the nearest whole number. This whole number then shall be multiplied by the per diem rate of per person. 'Travel Time Rates for Labor' are the rates applicable for travel time expended by Contractor's personnel located outside of Owner's service territory in which Emergency Response Work is to be performed, calculated based upon the following: (d) • Reasonable time necessary to travel the distance from the deployment location of Contractor's personnel to the Site or onboarding site designated by Owner, as applicable; and • Reasonable time necessary to travel the distance from the Emergency Response Work completion location to the deployment origin of Contractor's personnel. Travel Time Rates for Labor shall be as follows: (i) If at the time Owner requires Emergency Response Work, the responding Contractor personnel are located outside of Owner's service territory in which Emergency Response Work is to be performed (the "Normal Work Location"), Travel Time Rates for Labor for travel time for Contractor personnel to and from the Site or onboarding site designated by Owner shall be compensated at Overtime Rates, as specified in Appendix PS-6 PRICING SCHEDULE - T&M; or (ii) If at the time Owner requires Emergency Response Work, Contractor is performing Work at a Site located within Owner's service territory in which Emergency Response Work is to be performed (the "Normal Work Location"), travel to and from the Site or onboarding site EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 10 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 10 of 24 designated by Owner, as applicable, for Emergency Response Work shall be compensated at Straight Time, as specified in Appendix PS-6 PRICING SCHEDULE - T&M; provided, that if Owner requires travel outside of Normal Work Hours (as defined in Section 3 of the Pricing Schedule), to the extent travel distance from Contractor's facility is greater than travel to the Normal Work Location, Travel Time Rates for Labor shall be equal to Overtime Rates, as specified in Appendix PS-6 PRICING SCHEDULE - T&M. During Normal Working Hours, Owner may require Contractor to report to a show up location in anticipation of performing Emergency Response Work. Travel to and from the show up location shall be compensated as provided for above. Contractor will be paid its standard labor and equipment rates for the period of time that labor and equipment is held at the show up location. (e) Equipment Rates: Equipment Rates for Emergency Response Work shall be at the rates set forth in Appendix PS-6 PRICING SCHEDULE - T&M. All maintenance, fuel, delivery, and other charges associated with the equipment shall be included in the Emergency Response Rates for Equipment. If Owner provides any fuel, Contractor shall reimburse Owner for such fuel costs and at Owner’s option, Owner may either invoice Contractor for such fuel costs or the cost of such fuel may be deducted from Contractor’s invoice amount for Emergency Response Work. (f) Reimbursable Expenses: Unless otherwise agreed to in writing by Owner, all of Contractor’s reimbursable expenses shall be compensated by Owner paying the 'Travel per diem: Meals' and 'Travel per diem: Lodging' amounts calculated as provided above. Unless otherwise agreed to in writing by Owner, all of Contractor's reimbursable expenses are accounted for in the 'Travel per diem: Meals', 'Travel per diem: Lodging' and rates for Equipment set forth above, including Contractor's meals, lodging, fuel, tolls and other travel-related expenses incurred by Contractor during Emergency Response Work mobilization and de-mobilization. (g) If the Contractor requires lodging while performing Emergency Response Work and is located within the Owner’s service territory and Contractor is required to pay for lodging because the Owner did not pay, Contractor will be reimbursed at the 'Travel per Diem: Lodging' rate as listed above. Provided the Owner agrees in writing, when the Contractor requires a meal the Owner does not provide to the Contractor while performing Emergency Response Work and the Contractor is located within the Owner’s service territory, Owner will reimburse Contractor per meal, up to two meals per day or per day for more than two meals per day. In no event shall Owner reimburse Contractor EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 11 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 11 of 24 for any expenses relating to tobacco products, alcohol, laundry, personal hygiene products or other non-Emergency Response Work-related personal expenses. 5. MISCELLANEOUS 5.1. Reimbursable Costs. Contractor shall be entitled to reimbursement for the following costs associated with such Work: 5.1.1. Excess Travel. Unless otherwise specified in the applicable Work Release, Work performed on a firm fixed price basis or subject to a not-toexceed amount includes travel time from the show-up site to the job site of 30 minutes of travel time each way (for Fairfield County, Connecticut), or 15 minutes of travel time each way (for all other parts of Connecticut, Massachusetts and New Hampshire). If Contractor expects that actual travel time for such Work will exceed such durations, then Contractor may request reimbursement for excess travel time which, if approved, shall be included in the applicable Work Release or Change Order (using the hourly labor rates set forth in PRICING SCHEDULE - T&M, or such lesser rates as mutually agreed) and shall remain fixed for the duration of such Project. Unless so approved and included in the applicable Work Release or Change Order, Contractor shall not be entitled to reimbursement for such excess travel time. 5.1.2. Meals. Owner shall not be billed for Contractor's normal complement of employee's rooming costs or meals for any Work within Normal Working Hours. Under any of the following circumstances, Contractor will bill Owner for a fixed meal money allowance equal to per meal for Work performed by bargaining unit members using time and equipment and/or costplus pricing methodologies: (a) after nine and one-half (9 ½) hours from start of work on a scheduled eight (8) hour work day and every five (5) hours thereafter; (b) after twelve (12) hours from start of work on a scheduled ten (10) hour workday and every five (5) hours thereafter; or (c) after ten and one-half (10 ½) hours from show-up site arrival for scheduled/unscheduled Overtime Work and every five (5) hours thereafter. provided that (i) if, for any reason, Owner pays for, and/or provides the meals for any bargaining unit members, or (ii) the per diem under Section I, Paragraph 5.1.3 of this Pricing Schedule applies to any bargaining unit member, Contractor shall not bill Owner for the meal money allowances for the affected workers. EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 12 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 12 of 24 5.2. Constructability Review. Owner may use a constructability review process as a means of improving and/or updating the Project design prior to receiving a quote from Contractor. Contractor shall have the right to receive reimbursement for such constructability review labor for a single employee (up to the classification of general foreman) and one vehicle (pick-up truck), even if Owner does not award such work to Contractor (and/or any other contractor). Contractor invoices for constructability reviews should reference the Project name and number, Owner inquiry number, purchase order and Work Release established only for constructability reviews, appropriate "work order" from the Project, and the Owner Representative's name. 5.3. Other Reimbursable Costs. If Services for a Project are exclusively priced using the time and material methodology set forth in Section 3, Owner shall reimburse Contractor for the following costs without profit or mark-up whatsoever (unless specifically indicated below), as incurred in performing the Work on such Project, but only if and to the extent not already included in any other respect in another aspect of time and material pricing and/or not otherwise addressed elsewhere in the Contract Documents: (a) to the extent authorized in writing by the Owner Representative for a Project prior to incurrence, the actual cost of any manufacturer's representatives, service engineers, start-up engineers, instrument check and calibration technicians and other manufacturer’s special services; (b) net cost of correcting faulty materials furnished by Owner; (c) to the extent authorized in writing by the Owner Representative for a Project prior to incurrence, the net cost of testing services by Third Parties, unless necessary as a result of negligence on the part of Contractor and/or its Subcontractor; (d) net cost of Owner-requested field office facilities equipment for exclusive use by the Owner Representative for such Project; the actual rate charged by a Subcontractor on such Project for services rendered, plus the Markup Percentage Fee in Appendix PS-6 PRICING SCHEDULE - T&M; provided that flagging/police services are not subject to a subcontractor markup unless the Owner Representative for such Project specifically requests that Contractor directly retain such services, rather than just coordinate them with the flagging company or police department; (e) (f) net direct cost paid by Contractor to Third Parties as rent or similar occupancy cost for parking, show-up, laydown and/or storage area(s) acquired for such Project (plus the Markup Percentage Fee in Appendix PS-6 PRICING SCHEDULE - T&M); provided that notwithstanding anything in this Pricing Schedule or elsewhere in the Contract Documents, Contractor shall not be EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 13 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 13 of 24 entitled to recover and/or be reimbursed for (i) the internal costs of Contractor and/or any Subcontractor in locating, negotiating, acquiring, preparing and/or otherwise arranging such parking, show-up, laydown and/or storage area(s); and/or (ii) the costs associated with acquisition of a fee interest in any parking, show-up, laydown and/or storage area(s) and/or any other real property interest in the same that extends beyond the period required to perform the Work; (g) net cost paid by Contractor to a Governmental Authority as a filing fees and/or other charge as a condition to the issuance of a Contractor Permit required for such Project by such Governmental Authority; excluding, however, any such fee and/or charge required for construction equipment; and (h) to the extent authorized in writing by the Owner Representative for a Project prior to incurrence, the net cost for Contractor to verify, sign for, unload and accept vendor delivered materials to the storage/staging areas. Contractor's invoicing of reimbursable costs shall be supported by reasonably detailed documentation and such other verification as requested by Owner which, in the case of Subcontractor services (including materials and supplies), shall include signed time sheets, subcontractor invoices, and delivery receipts or other relevant documentation. Contractor shall use all reasonable efforts to mitigate the costs incurred in connection with all reimbursable costs and expenses, including, in the case of any reimbursable labor, using workers with the lowest rate appropriate for the Work. 5.4. Additional Requirements. With respect to Work using time and material and/or cost-plus pricing methodologies: (a) When material transport is requested by the Owner Representative for the applicable Project, Contractor shall invoice such transport charge using the hourly rate of the 5th step apprentice, or lowest job classification on the applicable Site, whichever is lower and Contractor shall only be permitted to invoice for a maximum of up to two (2) workers with respect to such material transport charge. (b) When Contractor performs flagging Services (pursuant and subject to the terms and conditions of Section 9.9(b) of this Agreement), Contractor shall invoice such flagging Services using the hourly rate of the 5th step apprentice, or lowest job classification on the applicable Site, whichever is lower. (c) If requested by Contractor in connection with the award of a Project, Contractor and the Owner Representative for such Project shall negotiate in good faith to establish in writing a reasonable guaranteed maximum for mobilization and demobilization prior to award of such Project; provided that if EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 14 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachement 1 REDACTED Page 14 of 24 Contractor does not incur any mobilization and/or demobilization charges, then Contractor shall not invoice Owner for such expense(s). Owner shall be entitled to deny, in which case Contractor shall not be reimbursed for, mobilization and demobilization costs for failure to secure such pre-approval. 6. STATE OF CT - CONTINUING CONTRACTOR REQUIREMENTS For Work in Connecticut, Contractor shall comply with the Continuing Contracting requirements of the State of Connecticut as in effect from time to time, including the following: 6.1 The hourly rate charged for equipment shall not exceed the calculated hourly rate for such equipment based on The Rental Rate Blue Book as published by EquipmentWatch. 6.2 The rates charged to Owner for Work on State of Connecticut highways shall not exceed rates charged to Owner for any other Work. 6.3 Contractor hereby grants the DOT in Connecticut and the Federal Highway Administration the right to audit all records of Contractor and its Subcontractors pertaining to highway relocation Work. Without limiting Contractor's obligations under this Agreement, Contractor shall maintain such records for at least (i) three (3) years after Final Acceptance of any Project that is fully or partially funded by the State of Connecticut, and (ii) five (5) years after Final Acceptance of any Project that has Federal participation. 6.4 Contractor shall prepare, sign and obtain the written approval from the applicable DOT inspector in Connecticut of all Con 40/41s within fifteen (15) days after the date Contractor performed the applicable Work. Without limiting the generality of the foregoing, unless otherwise directed by the applicable Owner Representative, all Work designated with an Owner activity code of HRU, HRO, HRD or HRL shall require such preparation, submission and approval of Con 40/41s. Copies of the most recent versions of Con 40 and 41 are attached (reference Appendices F-01 and F-02, respectively, to Exhibit E, of this Agreement), and Contractor shall use such versions or approved modifications thereof. 6.5 Contractor shall provide the DOT in Connecticut with the original signed Con 40/41 at the time of signing. 6.6 Contractor shall send one copy of the approved Con 40/41 to the following Person and/or such other Persons designated in writing by Owner: Eversource Energy Service Company P.O. Box 5017 Hartford, Connecticut 06102-5017 Attention: Accounts Payable EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20
Text of EOE-292_Final.pdf
Extracted from the file · 3 pages · 7,800 characters
Text of EOE-292 Attachment 1 REDACTED.pdf
Extracted from the file · 24 pages, 2 without text · 56,405 characters
Text of EOE-297_Final.pdf
Extracted from the file · 1 page · 1,068 characters
Text of EOE-300_Final.pdf
Extracted from the file · 3 pages · 9,650 characters
Text of EOE-300 Attachment 1 REDACTED.pdf
Extracted from the file · 24 pages, 2 without text · 56,398 characters
As listed on the current system
Question(s) Answered 288, 289, 291, 292, 297, 300 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026