Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 288, 289, 291, 292, 297, 300

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

Search terms highlighted
Eversource rate increase is on 5 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-291 Attachment 1 REDACTED.pdf

Extracted from the file · 24 pages, 2 without text · 56,420 characters

Scanned pages and machine-read text of EOE-291 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 2 of EOE-291 Attachment 2 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachment 2 REDACTED Page 1 of 2 PRIMARY SERVICES SCHEDULE A =- Contractor Billing Rates - Labor Rates are all inclusive of wages, insurance, taxes, overhead, profit and shall be in effect for the term of this Agreement. EFFECTIVE DATE RANGE
    : March 1 ,2024END: Aug 30, 2024
    TitleStraight Time RateTravel/Standby Response RateEmergency Response Working Rate (includes Holidays & Sundays)Travel per diem LodgingTravel per diem Meals
    General Foreman[redacted]
    Foreman[redacted]
    Lead Lineman[redacted]
    Lineman[redacted]
    7th Step Apprentice[redacted]
    6th Step Apprentice[redacted]
    5th Step Apprentice[redacted]
    4th Step Apprentice[redacted]
    3rd Step Apprentice[redacted]
    2nd Step Apprentice[redacted]
    1st Step Apprentice[redacted]
    Heavy Equipment Operator[redacted]
    Material Man[redacted]
    Eq Oper/Field Mech A[redacted]
    Driver Groundman[redacted]
    Field Mechanic B[redacted]
    Field Mechanic C[redacted]
    Groundman - experienced[redacted]
    Groundman - 1st Step[redacted]
    Flagman[redacted]
    Safety[redacted]
    Administration[redacted]
  2. Scan of page 2 of 2 of EOE-291 Attachment 2 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachment 2 REDACTED Page 2 of 2 EQUIPMENT RATES SCHEDULE A - Contractor Billing Rates - Equipment Rates are all inclusive of insurance, taxes, overhead, profit, maintenance and fuel and shall be in effect for the term of this Agreement. EFFECTIVE DATE RANGE
    START: March 1 ,2024END: Aug 30, 2024
    EquipmentRate
    1/2 ton pick-up truck 2 x 4[redacted]
    1/2 ton pick-up truck 4 x 4[redacted]
    10 Ton Trailer[redacted]
    3/4 Ton Pick-up Truck - 4 wheel drive[redacted]
    9 Ton 3x1 Trailer[redacted]
    Air Compressor[redacted]
    Air Compressor with Tools[redacted]
    ATV with pull behind trailer[redacted]
    Boom Truck[redacted]
    Bucket - Squirt Boom[redacted]
    Bucket Truck - 55 ML[redacted]
    Bucket Truck - 55MH[redacted]
    Bucket Truck - 65 ft[redacted]
    Bulldozer - Small[redacted]
    Compressor 850 CFM[redacted]
    Digger (Corner Mounted)[redacted]
    Digger Derrick[redacted]
    Dump Truck[redacted]
    Flatbed Truck[redacted]
    Lift Gate Material Truck[redacted]
    Material Trailer[redacted]
    Pole Trailer[redacted]
    Rack Truck - Large[redacted]
    Rock Drill with truck[redacted]
    Single Arbor Trailer[redacted]
    Utility Truck - 1 Ton[redacted]
    Wire Puller Tensioner[redacted]
    Wire Trailer[redacted]

Text of EOE-292_Final.pdf

Extracted from the file · 3 pages · 7,800 characters

Text of EOE-292 Attachment 1 REDACTED.pdf

Extracted from the file · 24 pages, 2 without text · 56,405 characters

Text of EOE-297_Final.pdf

Extracted from the file · 1 page · 1,068 characters

Words on different pagesRead the text of EOE-297_Final.pdf

Text of EOE-300_Final.pdf

Extracted from the file · 3 pages · 9,650 characters

Text of EOE-300 Attachment 1 REDACTED.pdf

Extracted from the file · 24 pages, 2 without text · 56,398 characters

As listed on the current system

Question(s) Answered 288, 289, 291, 292, 297, 300 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)