Interrogatory responses
Answers to questions 288, 289, 291, 292, 297, 300
Files10
EOE-288_Final.pdf
PDF · 90 KB · 1 pageText searchable
Download EOE-288_Final.pdfRead the text of EOE-288_Final.pdf
EOE-289_Final.pdf
PDF · 142 KB · 2 pagesText searchable
Download EOE-289_Final.pdfRead the text of EOE-289_Final.pdf
EOE-291_Final.pdf
PDF · 117 KB · 2 pagesText searchable
Download EOE-291_Final.pdfRead the text of EOE-291_Final.pdf
EOE-291 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-291 Attachment 1 REDACTED.pdfRead the text of EOE-291 Attachment 1 REDACTED.pdf
EOE-291 Attachment 2 REDACTED.pdf
PDF · 758 KB · 2 pagesText read by machine from a scan; may contain errors, especially in numbers
Download EOE-291 Attachment 2 REDACTED.pdfScanned pages and text of EOE-291 Attachment 2 REDACTED.pdf
EOE-292_Final.pdf
PDF · 176 KB · 3 pagesText searchable
Download EOE-292_Final.pdfRead the text of EOE-292_Final.pdf
EOE-292 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-292 Attachment 1 REDACTED.pdfRead the text of EOE-292 Attachment 1 REDACTED.pdf
EOE-297_Final.pdf
PDF · 88 KB · 1 pageText searchable
Download EOE-297_Final.pdfRead the text of EOE-297_Final.pdf
EOE-300_Final.pdf
PDF · 178 KB · 3 pagesText searchable
Download EOE-300_Final.pdfRead the text of EOE-300_Final.pdf
EOE-300 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-300 Attachment 1 REDACTED.pdfRead the text of EOE-300 Attachment 1 REDACTED.pdf
Text of EOE-291 Attachment 1 REDACTED.pdf
Extracted from the file · 24 pages, 2 without text · 56,420 characters
Scanned pages and machine-read text of EOE-291 Attachment 2 REDACTED.pdf

The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachment 2 REDACTED Page 1 of 2 PRIMARY SERVICES SCHEDULE A =- Contractor Billing Rates - Labor Rates are all inclusive of wages, insurance, taxes, overhead, profit and shall be in effect for the term of this Agreement. EFFECTIVE DATE RANGE: March 1 ,2024 END: Aug 30, 2024 Title Straight Time Rate Travel/Standby Response Rate Emergency Response Working Rate (includes Holidays & Sundays) Travel per diem Lodging Travel per diem Meals General Foreman [redacted] Foreman [redacted] Lead Lineman [redacted] Lineman [redacted] 7th Step Apprentice [redacted] 6th Step Apprentice [redacted] 5th Step Apprentice [redacted] 4th Step Apprentice [redacted] 3rd Step Apprentice [redacted] 2nd Step Apprentice [redacted] 1st Step Apprentice [redacted] Heavy Equipment Operator [redacted] Material Man [redacted] Eq Oper/Field Mech A [redacted] Driver Groundman [redacted] Field Mechanic B [redacted] Field Mechanic C [redacted] Groundman - experienced [redacted] Groundman - 1st Step [redacted] Flagman [redacted] Safety [redacted] Administration [redacted] 
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-291 Attachment 2 REDACTED Page 2 of 2 EQUIPMENT RATES SCHEDULE A - Contractor Billing Rates - Equipment Rates are all inclusive of insurance, taxes, overhead, profit, maintenance and fuel and shall be in effect for the term of this Agreement. EFFECTIVE DATE RANGESTART: March 1 ,2024 END: Aug 30, 2024 Equipment Rate 1/2 ton pick-up truck 2 x 4 [redacted] 1/2 ton pick-up truck 4 x 4 [redacted] 10 Ton Trailer [redacted] 3/4 Ton Pick-up Truck - 4 wheel drive [redacted] 9 Ton 3x1 Trailer [redacted] Air Compressor [redacted] Air Compressor with Tools [redacted] ATV with pull behind trailer [redacted] Boom Truck [redacted] Bucket - Squirt Boom [redacted] Bucket Truck - 55 ML [redacted] Bucket Truck - 55MH [redacted] Bucket Truck - 65 ft [redacted] Bulldozer - Small [redacted] Compressor 850 CFM [redacted] Digger (Corner Mounted) [redacted] Digger Derrick [redacted] Dump Truck [redacted] Flatbed Truck [redacted] Lift Gate Material Truck [redacted] Material Trailer [redacted] Pole Trailer [redacted] Rack Truck - Large [redacted] Rock Drill with truck [redacted] Single Arbor Trailer [redacted] Utility Truck - 1 Ton [redacted] Wire Puller Tensioner [redacted] Wire Trailer [redacted]
Text of EOE-292_Final.pdf
Extracted from the file · 3 pages · 7,800 characters
Text of EOE-292 Attachment 1 REDACTED.pdf
Extracted from the file · 24 pages, 2 without text · 56,405 characters
Text of EOE-297_Final.pdf
Extracted from the file · 1 page · 1,068 characters
Text of EOE-300_Final.pdf
Extracted from the file · 3 pages · 9,650 characters
Text of EOE-300 Attachment 1 REDACTED.pdf
Extracted from the file · 24 pages, 2 without text · 56,398 characters
As listed on the current system
Question(s) Answered 288, 289, 291, 292, 297, 300 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026