Interrogatory responses

Answers to questions 350, 354, 360, 361, 362, 363

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-350 Page 1 of 1 Date Filed: October 09, 2026 Witness: Jessica B. Cain and Timothy W. McGrath Request from: Office of Education, Outreach, and Enforcement Question: (RECONNECTION) Provide an unlocked Excel spreadsheet containing the following information for the 2025 test year: a. The total number of same day reconnections offered to customers; b. The total number of same day reconnections completed; c. The total number of same day reconnections which were not completed; and d. For each same day reconnection that was not completed, identify the reason it was not completed. Response: The table below provides the reconnection information requested for customer-requested 1, sameday reconnections, including those offered after the Company’s 2:30pm daily cutoff time. 2025 Same Day Reconnection Information Number Percent a. The total number offered to customers 7,709 b. The total number completed 7,696 99.8% c. The total number not completed that day 13 0.2% d. Of the 13 not completed that calendar day: • One (1) was due a human performance error in selecting the next-day versus same-day reconnection. • Twelve (12) were created for customers after the daily cutoff time 2 (with the caveat that the reconnection could not be guaranteed). In these cases, resources were not available in the area to perform the reconnection work that evening, when emergency work, outages and medical restorations takes priority. This information doesn’t include medical-related reconnections, which are treated differently (higher priority) and follow a different process, as reflected in the Company’s response to EOE-346. Medical-related reconnections orders may also be referred to as ‘same-day’, but it’s different from the discretionary option for customers to choose a same-day reconnection. 1 After a number of the same-day reconnections were not completed that calendar day, the Company modified the daily same-day reconnection cutoff time from 2:30pm to noon to better ensure resource availability. 2

As listed on the current system

Question(s) Answered 350, 354, 360, 361, 362, 363 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)