Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 351, 352, 355

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-07 Date Issued September 26, 2026 EOE-351 Page 1 of 1 Date Filed: October 09, 2026 Witness: Jessica Cain Request from: Office of Education, Outreach, and Enforcement Question: (RECONNECTION) Provide an unlocked Excel spreadsheet containing the following information for the 2025 test year: a. Total number of reconnections completed; b. Total number of reconnections appointments that were missed because of the Company; c. Average length of time between reconnection appointment scheduled and reconnection being fulfilled; d. The shortest length of wait time between reconnection appointment scheduled and reconnection being fulfilled; e. The longest length of wait time between reconnection appointment scheduled and reconnection being fulfilled; and i. Provide the rationale behind the wait time. Response: Please see the table below for the reconnection information requested. 2025 Reconnection Information Requested a. Total number of reconnections completed b. Total number appointments that were missed because of the Company c. Average length of time between reconnection appointment scheduled and reconnection being fulfilled d. The shortest length of wait time between reconnection appointment scheduled and reconnection being fulfilled e. The longest length of wait time between reconnection appointment scheduled and reconnection being fulfilled f. Provide the rationale behind the wait time Number 21,875 N/A 1 N/A N/A N/A N/A 1 To reconnect electric service the Company follows its Billing Rights for Connecticut Residential Customers, available at https://www.eversource.com/residential/account-billing/manage-bill/about-your-bill/billing-rights. Appointments are not made to reconnect service. The CL&P Terms and Conditions for Electric Service at Section 6E and Section 15 discuss the reconnection charge process. See CL&P Terms and Conditions for Electric Service available at: https://www.eversource.com/docs/default-source/rates-tariffs/delivery.pdf?sfvrsn=2

As listed on the current system

Question(s) Answered 351, 352, 355 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)