Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 45, 60

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy21 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files21

Text of EOE-060 Attachment 13.pdf

Extracted from the file · 2 pages · 4,641 characters

Text of EOE-060 Attachment 12.pdf

Extracted from the file · 3 pages · 7,241 characters

Text of EOE-060 Attachment 11.pdf

Extracted from the file · 9 pages · 20,240 characters

Text of EOE-060 Attachment 10.pdf

Extracted from the file · 2 pages · 5,855 characters

Text of EOE-060 Attachment 9.pdf

Extracted from the file · 2 pages · 3,951 characters

Text of EOE-060 Attachment 8.pdf

Extracted from the file · 3 pages · 5,695 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-060 Attachment 7 Page 1 of 3 JOURNAL ENTRY APPROVAL I. Purpose and Scope Journal entries record accounting transactions in the Company’s financial records. This policy applies to journal entries recorded in the PowerPlan, Oracle, and OneStream accounting and reporting systems. Journal entries must be appropriately prepared and approved in order to reflect an accurate presentation of the Company’s financial position and results of operations during the applicable accounting period. This accounting policy addresses controls associated with the approval of manual journal entries. This policy does not address system generated journal entries that are automatically created and posted to the Company’s financial records. II. Policy Access to record journal entries in the general ledger systems is limited through the use of security protocols to ensure only authorized individuals can prepare and approve journal entries. Managers are responsible for the proper preparation and approval of journal entries originating in their departments. Journal entry approval authorization and limits are determined by the Department Manager, but approval authorization should only be granted to supervisory or senior level individuals or above. All delegates must be qualified to approve the applicable journal entries and have knowledge of the underlying transactions (including the history, purpose and typical amount of the entry) and the applicable technical accounting requirements and applicable accounts. The Department Manager should authorize appropriate dollar limits for approvals based on each approver’s qualifications. In all circumstances, the Department Manager remains accountable for the appropriateness and accuracy of the journal entries. When approving journal entries, the authorized approver must have obtained reasonable assurance that the entry is proper, adequate supporting detail is maintained, and the accounting code block is appropriate. In addition, adequate segregation of duties needs to exist to ensure proper internal controls. To achieve this segregation, the preparer of the journal entry and the approver of the journal entry cannot be the same individual. The soft or hard copy of the journal entry is the official company record and must be retained in accordance with company record retention requirements. Appropriate approvals and electronic signatures of the preparer and approver are required on the soft or hard copy of the journal entry.
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-060 Attachment 7 Page 2 of 3 Each Department Manager responsible for processing journal entries is required to maintain accessible documentation in his or her area, indicating to whom approval authorization has been delegated, including that individual’s level and dollar amount authorized to approve. See Appendix A for a sample Journal Entry Approval Delegation Form which shows the information required to be maintained in the responsible Manager’s department. While the Manager is not required to use this specific format for documentation, all of the information and approvals contained in this form must be included in the documentation. The Department Manager is responsible for discussing and clearing the designated approvers and associated dollar limits with his/her own management and this authorization must be included in the documentation. The approval authorization documentation should be updated when there are personnel changes or when there are changes in the nature or volume of activity. The Department Manager remains responsible for the appropriateness and accuracy of journal entries in all circumstances in which approval authority has been delegated. Revision History 0 Combined post-merger policy issuance 12/14/12 1 2 3 Revision to reflect implementation of FSSP Revised for Eversource name Revised for soft copy retention and OneStream 12/18/14 01/07/19 02/24/23
  3. Page 3

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-060 Attachment 7 Page 3 of 3 Appendix A Eversource Sample Journal Entry Approval Delegation Form To Be Completed by Managers of All Departments with Journal Entry Responsibilities: Group Name: _____________________________________ The following individuals have approval authority: Employee Name Position Approval Limit Comments: ___________________________________________________________ _____________________________________________________________________ Manager Approval: Name: ________________________ Signature: ________________________ Date: ________________________ Director or VP Authorization: Name: ________________________ Signature: ________________________ Date: ________________________

Text of EOE-060 Attachment 6.pdf

Extracted from the file · 3 pages · 6,774 characters

Text of EOE-060 Attachment 5.pdf

Extracted from the file · 2 pages · 4,531 characters

Text of EOE-060 Attachment 4.pdf

Extracted from the file · 2 pages · 3,669 characters

Text of EOE-060 Attachment 3.pdf

Extracted from the file · 6 pages · 16,249 characters

Text of EOE-060 Attachment 2.pdf

Extracted from the file · 4 pages · 11,766 characters

Text of EOE-060 Attachment 1f.pdf

Extracted from the file · 1 page · 780 characters

Text of EOE-060 Attachment 1e.pdf

Extracted from the file · 12 pages · 8,108 characters

Text of EOE-060 Attachment 1d.pdf

Extracted from the file · 3 pages · 3,207 characters

Text of EOE-060 Attachment 1c.pdf

Extracted from the file · 5 pages · 7,956 characters

Text of EOE-060 Attachment 1b.pdf

Extracted from the file · 5 pages · 5,670 characters

Text of EOE-060 Attachment 1a.pdf

Extracted from the file · 16 pages · 34,194 characters

As listed on the current system

Question(s) Answered 45, 60 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026

This filing on the current system (opens in a new tab)