STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-06-17
PETITION FOR APPROVAL OF METHOD AND
MANNER OF CONSTRUCTION AND PERMISSION TO
ENERGIZE THE HADDAM SUBSTATION TO EAST
HADDAM JUNCTION REBUILD PROJECT (1772 AND
348 LINES)
AUGUST 5, 2026
PROPOSED FINAL DECISION
This proposed final decision is being distributed to the participants in this proceeding for comment.
The proposed decision is not final. The Authority will consider the participants’ arguments and exceptions
before reaching a final decision, which may differ from the proposed decision. Therefore, this proposed
decision does not establish any precedent and does not necessarily represent the Authority’s final
conclusion.
PROPOSED FINAL DECISION
I.
SUMMARY
On June 26, 2026, The Connecticut Light and Power Company d/b/a Eversource
Energy (Eversource or Company) submitted a petition (Petition) requesting that the Public
Utilities Regulatory Authority (Authority or PURA) approve the method and manner of
construction of, and provide permission to energize the 1772 and 348 transmission lines
for the Haddam Substation to East Haddam Junction Rebuild Project (Project), which
includes spans of the Connecticut River.1 The Authority approves the method and manner
of construction of the Project, and approves permission to energize following completion
of the Project.
II.
STANDARD OF REVIEW
The Company is required to provide the following in conformance with Conn.
Agencies Regs. §§ 16-11-137 and 16-11-139:
•
•
•
•
•
•
•
•
•
•
•
Local names of the points through which the line will pass and the towns
through which it will pass;
the length of the line;
electrical descriptions of the line including voltage, frequency, number of
phases, and number of conductors;
the general types of construction to be employed; the character of materials to
be employed;
a description of lightning protection;
titles of specifications and standards to which the construction will conform;
names of utilities and municipalities whose facilities are crossed or paralleled
by the line;
the dates of planned construction and energization;
drawings showing location, depth, and clearances of all known underground
circuits, tracks, and other underground facilities of other utilities and
municipalities;
maps showing the route of the line and locations of the circuits; and
copies of letters from each railroad, municipality or other utility affected, stating
that it has been notified of the details of the proposed line and that it offers no
objection to the method or manner of construction.
1 On March 5, 2026, the Connecticut Siting Council (CSC) approved the transmission project.
Petition,
p. 7; see CSC Petition No. 1690 The Connecticut Light and Power Company d/b/a Eversource Energy
petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the
Haddam Substation to East Haddam Junction Line Rebuild Project consisting of the replacement and
reconductoring of electric transmission line structures along approximately 1.5 miles of its existing 115kilovolt (kV) 1772 Line and 345-kV 348 Line shared right-of-way and associated Connecticut River Crossing
between Haddam Substation in Haddam and East Haddam Junction in East Haddam, Connecticut, and
related electric transmission line and substation improvements.
Docket No. 26-06-17
III.
Page 2
EVERSOURCE PETITION AND PROJECT DESCRIPTION
The purpose of the Project is to maintain system reliability by upgrading
approximately 1.5 miles of the 115-kilovolt (kV) 1772 Line and the 345-kV 348 Line.
Petition, p. 1. The Project will involve replacing existing aging, at-risk infrastructure,
including the aluminum conductor steel reinforced (ACSR) conductors, as well as shield
wire, optical ground wire (OPGW), and overstressed structures. Id. The transmission
line spans across and adjacent to the Connecticut River will also be replaced with
specialty aluminum encapsulated carboncore (AECC) conductor, which can be pulled at
higher tensions over long spans, thereby adhering to regulatory requirements for
conductor clearance above the river while reducing the structure heights at the river
crossing as much as possible. Id. On these same spans, the existing OPGW and shield
wire will be replaced with custom high-strength OPGW, which also is designed to be
pulled at higher tensions, consistent with the AECC conductor's tensions. On the
remaining spans, the existing conductor and OPGW/shield wire will be replaced with
Eversource standard aluminum conductor steel supported (ACSS) conductor and
standard OPGW. Id., pp. 1-2.
As a result of the reconductoring and new OPGW, a total of six structures will be
overstressed, including five double-circuit lattice steel towers and one single-circuit wood
H-frame. Petition, p. 2. These overstressed structures will be removed: the five doublecircuit lattice steel towers will be replaced with eight single-circuit steel structures (one of
the existing double-circuit lattice steel towers will not be replaced due to reconfiguration
of span lengths between the replacement structures) and the single-circuit three-pole
wood H-frame will be replaced with a single-circuit steel three-pole H-frame structure. Id.
The Project also will maintain reliability by addressing age-related deterioration of
the existing custom conductor (which is fraying) at the Connecticut River crossing.
Petition, p. 2. The existing double-circuit lattice steel towers at and near the river crossing
will need to be replaced due to stressed conditions from increased loading of the
proposed replacement conductor and OPGW. Id. The design of the Project will improve
system reliability by separating the two lines at and near the Connecticut River crossing
onto single-circuit structures, thereby eliminating the potential risk to reliability from a
double-circuit tower contingency failure. Id. After the replacement of the double-circuit
lattice towers with single-circuit structures, both the 1772 and 348 lines will be installed
on independent structures throughout their lengths. Id. The existing single-circuit wood
pool structure on the 1772 Line also will be overstressed by the new conductor and
OPGW will need to be replaced due to age-related deterioration. Id., pp. 2-3.
The Project will take place in the Towns of Haddam (Haddam) and East Haddam
(East Haddam). Petition p. 3. It will be constructed within Eversource’s existing right-ofway (ROW) or on Eversource-owned property, and extends east for approximately 1.5
miles from Haddam Substation, located at 1384 Saybrook Road in Haddam, across the
Connecticut River, to East Haddam Junction, which is located west of State Route 151 in
East Haddam. Id. p. 2.
Materials to be used in the construction of the transmission lines include:
Docket No. 26-06-17
Page 3
For 1772 Line:
•
•
•
•
Three single-circuit galvanized steel monopoles, one single-circuit steel 2-pole
structure in a delta configuration, and one single-circuit galvanized 3-pole steel Hframe structure;
Approximately 0.59 circuit miles of 1590-kcmil 54/19 strand ACSS conductor per
circuit and 0.83 circuit mile of specialty 2048-kcmil Evans AECC conductor;
Approximately 0.59 circuit miles of 0.646-inch-diameter fiber OPGW and 0.83
miles of custom high-strength 0.719-inch-diameter fiber OPGW; and
Ceramic insulators.
For 348 Line:
•
•
•
•
Three single-circuit galvanized steel monopoles and one single-circuit steel 2-pole
structure in a delta configuration;
Approximately 0.59 circuit miles of 1590-kcmil ACSS conductor, two conductors
per phase per circuit and 0.83 circuit mile of specialty 2048-kcmil Evans AECC
conductor;
Approximately 0.59 circuit miles of (2) 0.646-inch diameter fiber OPGW on each
circuit and 0.83 circuit miles of custom high strength 0.719-inch diameter fiber
OPGW; and
Ceramic insulators.
Petition, pp. 4-5.
The Project will not cross over or under, or affect in any different manner, circuits
and facilities of other utilities, railways, or municipalities not already crossed by the
existing transmission lines. Id., p. 5. The Project will not impact the facilities of other
utilities, railways, or municipalities, as it will not create any additional crossings over,
under, parallel or conflict with such facilities.2 Id., pp. 5-6.
The Company began construction with civil work in April 2026. Construction is
expected to be completed (exclusive of final restoration) by the end of December 2026.
The 1772 and 348 lines will be re-energized during and after construction. Id., p. 6.
IV.
AUTHORITY ANALYSIS
The Company provided the information required by Conn. Agencies Regs. §§ 1611-137 and 16-11-139. See, Petition, pp. 1-7, Exhibits A, B and C. All construction plans
comply in accordance with Part 2 of the 2023 Edition of the National Electrical Safety
Code as required by Conn. Agencies Regs. § 16-11-134. Id., p. 5.
2 The Project was reviewed for impact to the facilities of the following companies: Comcast and Frontier
Communications. Letters of no objection from those entities are attached in the Petition. Petition, Exhibit
B.
Docket No. 26-06-17
Page 4
The Authority reviewed the information and plans filed in the record pursuant to
General Statutes § 16-243 and Conn. Agencies Regs §§ 16-11-137 and 16-11-139. The
Authority finds that the Company satisfied the application requirements and grants
approval of construction at the locations cited above. The Authority also grants approval
to energize after completion of the Project.
V.
CONCLUSION AND ORDER
The Authority approves the method and manner of construction of the Project and
approves permission to energize following completion of the Project.
To comply with the order below, the Company shall file an electronic version of any
compliance through the Authority’s website at www.ct.gov/pura. Submissions filed in
compliance with the Authority’s orders must be identified by all three of the following:
Docket Number, Title, and Order Number.
1.
Not more than 30 days following completion of the Project, the Company shall file
as compliance the date on which construction was completed. The Authority will
not require a field inspection for this Project.
As listed on the current system