STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
DOCKET NO. 26-06-17
PETITION FOR APPROVAL OF METHOD AND MANNER OF CONSTRUCTION AND
PERMISSION TO ENERGIZE THE HADDAM SUBSTATION TO EAST HADDAM
JUNCTION REBUILD PROJECT (1772 AND 348 LINES)
NOTICE OF PROCEEDING
On June 26, 2026, The Connecticut Light and Power Company d/b/a Eversource
Energy (Company) submitted a petition (Petition) requesting that the Public Utilities
Regulatory Authority (Authority or PURA) approve the method and manner of construction
and provide permission to energize the 1772 and 348 transmission lines for the Haddam
Substation to East Haddam Junction Rebuild Project (Project). See General Statutes §
16-243 and Conn. Agencies Regs. §§ 16-11-137 and 16-11-139.
The purpose of the Project is to maintain system reliability by upgrading
approximately 1.5 miles of the 115-kilovolt (kV) 1772 Line and the 345-kV 348 Line.
Petition, p. 1. The Project, which will be constructed within Eversource’s existing right-ofway or on Eversource-owned property, extends east from the Haddam Substation,
located at 1384 Saybrook Road in the Town of Haddam, across the Connecticut River, to
East Haddam Junction, which is located west of State Route 151 in the Town of East
Haddam. Petition, p. 2. In response, the Authority is conducting this uncontested
proceeding pursuant to Conn. Agencies Regs. § 16-1-134, et seq. to address the issues
raised in the Petition.
Additional
information
is
available
at
the
Authority's
website,
https://portal.ct.gov/pura, regarding the procedural practices of the Authority. All of the
filings in this docket are available on the Authority’s website under the “Docket
Information” link. Persons may register to receive e-mail notifications when documents
are filed or issued in this docket. For assistance with any Authority online service, contact
the PURA case coordinator assigned to this docket, Laura Lupoli, who can be reached
via email at [email removed].
PANEL OF COMMISSIONERS AND PRESIDING OFFICER
In accordance with General Statutes § 16-2(c), the chairperson assigns this
proceeding to a panel of all appointed and qualifying commissioners—presently,
Chairman Wiehl, Vice-Chairman Arconti, and Commissioners Beecher, Smith, and
Cheeseman. The panel designates Commissioner Smith as the presiding officer.
PARTICIPANTS TO THE PROCEEDING
The Authority has designated Eversource, the Office of Consumer Counsel (OCC),
and the Commissioner of the Department of Energy and Environmental Protection
(DEEP) as participants in this proceeding. Conn. Agencies Regs. § 16-1-15 requires
Docket No. 26-06-17
Page 2
participants to serve a copy of each filed document to every person or entity on the service
list, which is available on the Authority’s website at http://www.ct.gov/pura.
ATTORNEYS
Attorneys not admitted to practice law before the Connecticut Superior Court must
comply with Connecticut’s pro hac vice procedures in order to participate in any
administrative proceeding before the Authority.
REQUEST FOR PARTICIPANT STATUS
Other persons seeking participant status in this proceeding must file a motion in
accordance with General Statutes § 16-19pp no later than July 31, 2026, before 4:00
p.m., Eastern time. Each person seeking participant status may designate up to two
persons for inclusion on the service list. Others who wish to receive e-mail notifications,
but do not seek official status in the matter, may register on the PURA website for an email notification account at http://www.dpuc.state.ct.us/DPUCPublicList.NSF. Persons
seeking participant status have the option to do so by completing and filing the Motion for
Intervenor/Participant Status form as a motion in this docket.
APPLICATION FOR STAKEHOLDER GROUP COMPENSATION
The Authority’s Stakeholder Group Compensation Program makes funds available
to groups representing the interests of residential utility customers residing in an
environmental justice community, residential utility customers receiving protection as
hardship cases, or small business customers. To apply for stakeholder group
compensation, an eligible stakeholder group must file a Notice of Intent to Apply for
Stakeholder Group Compensation (Notice of Intent) and an Application for Stakeholder
Group Compensation (Application) by July 31, 2026. Additional information about the
Stakeholder Group Compensation Program, including required forms, can be found at
https://portal.ct.gov/pura/public-participation/stakeholder-group-compensation-program.
The Notice of Intent must be filed as correspondence in both this docket and in
Docket No. 23-09-34. By filing a Notice of Intent in Docket No. 23-09-34, applicants will
automatically be designated as participants in Docket No. 23-09-34. The Notice of Intent
must be filed before or contemporaneously with the Application. The Application must be
filed as a motion in Docket No. 23-09-34. The Application must be accompanied by a
Stakeholder Group Compensation Itemized Budget.
Applicants must also comply with the procedures in this Notice of Proceeding to
request participant status in this docket. A motion for participant status may be filed in
this docket simultaneously with the Notice of Intent. The Motion for Intervenor/Participant
Status form may be used to request participant status in this docket.
MOTIONS
Any person seeking a procedural change or other Authority approval must file a
motion with the Authority. Motions must be served on the service list for this proceeding.
Motions for extension of time shall be filed in advance of the prescribed deadline and
should provide sufficient time for the Authority to consider timely objections and to rule on
Docket No. 26-06-17
Page 3
the motion. Objections and responses to all other motions are due no later than seven
(7) calendar days following Authority receipt.
ELECTRONIC SUBMISSION OF FILINGS
Unless otherwise specified, the Authority requires electronic submission of all
filings, including applications and motions, using the Authority’s online filing system (links
and instructions at https://portal.ct.gov/pura). Persons filing electronically or wishing to
be listed as a contact must first create an account through the Authority’s website under
Docket Services (Make a Filing). Unless otherwise specified, filings are to be submitted
no later than 4:00 p.m. on the due date.
INFORMATION PROTECTED FROM PUBLIC DISCLOSURE
The Authority operates with the strong presumption that all documents filed with it
are public records subject to the right of public inspection and copying in accordance with
the Connecticut Freedom of Information Act, General Statutes § 1-200 et seq. In those
exceptional circumstances where a party or intervenor believes that information is exempt
from public disclosure under law, a motion for a protective order may be filed. The motion
must provide specific facts and legal arguments, with reference to state or federal law,
explaining why the information should not be filed publicly. A certified affidavit supplied
by a competent witness in support of the motion must be appended to the motion. Until
otherwise directed by the Authority, all prospective protected material must be
submitted electronically by email to [email removed] contemporaneously
with the filing of a motion. The email’s subject line and each page of any attached
documents shall state in all capital letters “PROTECTED MATERIAL - NOT FOR
PUBLIC DISCLOSURE.” The associated motion for a protective order shall be filed
publicly.
EX PARTE COMMUNICATION PROHIBITED
This uncontested proceeding is not subject to the legal restrictions on ex parte
communications applicable to contested proceedings. Nonetheless, for this matter, the
Commissioners will not engage in (and request that all participants refrain from engaging
in) ex parte communications. Accordingly, communications with the commissioners or
PURA staff should (1) occur only during a noticed public hearing or meeting or (2) be
submitted in writing through the public case management system, with service to all other
parties and intervenors. Communication with the PURA case coordinator regarding
scheduling or administrative matters is permitted.
REQUESTS FOR ACCOMMODATION
The Authority, which is within DEEP for administrative purposes only, is committed
to complying with the requirements of the Americans with Disabilities Act (ADA). If you
are seeking a communication aid or service, have limited proficiency in English, wish to
file an ADA or Title VI discrimination complaint or require some other accommodation,
including equipment to facilitate virtual participation, please contact the DEEP Office of
Diversity and Equity at [phone removed] or via email at [email removed].
Any person needing an accommodation for hearing impairment may call the State of
Connecticut relay number, 7-1-1.
In order to facilitate efforts to provide an
Docket No. 26-06-17
Page 4
accommodation, please request all accommodations as soon as possible following notice
of any agency hearing, meeting, program, or event.
Dated at New Britain, Connecticut, this 17th day of July, 2026.
By direction of the Presiding Officer,
Jeffrey R. Gaudiosi, Esq.