Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Compliance Filing, Order No. No

Compliance filing

Filed by Eversource Energy

Part of

Annual Residential Renewable Energy Solutions Program Review and Rate Setting - Year 6

Type of filing
Compliance filing (Compliance Filing)
Date filed
August 3, 2026
Filed by
Eversource Energy
Files
17

As listed on the current system

Compliance Filings, 08/03/2026 [26-08-02] Order No.No 6 In 25-08-02 / Eversource Energy /

This filing on the current system (opens in a new tab)

Files17

August 3, 2026 Mr. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 26-08-02, Annual Residential Renewable Energy Solutions Program Review and Rate Setting – Year 5 – Compliance, Order No. 6 in Docket 25-08-02 Dear Mr. Gaudiosi, Pursuant to Order No. 6 of the Public Utilities Regulatory Authority’s (“PURA” or the “Authority”) December 17, 2025 Decision in Docket No. 25-08-02, The Connecticut Light and Power Company dba Eversource Energy and The United Illuminating Company (the “EDCs” or “Companies”) hereby provide this compliance filing. Specifically, Order No. 6 states: No later than August 1, 2022, and annually thereafter, the EDCs shall jointly file, in the annual Residential Tariff program review and rate setting proceeding the Excel workbooks outlined in Section III.[C].6.a. The EDCs shall each use the same Excel workbook, including the same format and the exact same data fields, as each other. The EDCs shall follow all other direction provided in Section III.[C].6.a. [No later than August 1, 2022, and annually thereafter, the EDCs shall jointly file, in the annual Residential Tariff program review and rate setting proceeding the Excel workbooks outlined in Section III.[C].6.a. The EDCs shall each use the same Excel workbook, including the same format and the exact same data fields, as each other. The EDCs shall follow all other direction provided in Section III.[C].6.a. [The Authority further directs the EDCs to include the following in each annual filing: (1) any supplemental field data as indicated in CAE-1 and CAE-14 in Docket No. 23-08-02 and included in the EDCs’ redacted filings; (2) a list of all existing data fields collected in the RRES application; (3) information on the application submission and approval date for each RRES project; (4) both solar PV costs, and other costs (e.g., costs of associated electrical upgrades); (5) the number and percentage of LIDR customers enrolled in the RRES Program, broken out by both LIDR tier and RRES tariff; (6) the number of add-on Netting systems enrolled in the Program which are unable to support the addition of a nonbypassable charge; (7) by each developer, the number and percentage of systems by type of housing (e.g., single family, 2-4 unit multifamily, or multifamily affordable housing); (8) by each developer, the number and percentage of total approved RRES applications which are eligible for the low-income or Distressed Municipality adder(s); (9) the housing type (e.g., single family, 2-4 unit multifamily, or multifamily affordable housing) and metering type (e.g., master-metered or individually metered) for each RRES project; and (10) whether each RRES project received assistance through Solar for All. See, UI Interrog. Resp. CAE-14, Att. 4 Public; Eversource Compliance, Aug. 22, 2023, Att. 1. Last, the Authority also directs the EDCs to include a summary of the Program data on the RRES Program websites. Notably, this data can be provided in any reasonable fashion (e.g., attached file, web link, embedded data), and may be relocated to the PURA Data Dashboard when the dashboard is expanded to include Clean Energy Program data.] The Companies believe that the Authority intended the EDCs file Excel workbooks outlined in Section III.C.6.a and accordingly submit the following Attachments in compliance with Order No. 6. UI will supplement the initial filing with their Attachments. Attachment 1 – Eversource CT RRES Raw Data (CONFIDENTIAL) Attachment 1 – Eversource CT RRES Raw Data (Redacted) Attachment 2 – Eversource CT RRES Averaged & Aggregated Data by Year Attachment 3 – Eversource CT RRES Averaged & Aggregated Data by Town Attachment 4 – Eversource CT RRES Averaged & Aggregated Data by Installer Attachment 5 – UI CT RRES Raw Data (CONFIDENTIAL) Attachment 5 – UI CT RRES Raw Data (Redacted) Attachment 6 – UI CT RRES Averaged & Aggregated Data by Year Attachment 7 – UI CT RRES Averaged & Aggregated Data by Town Attachment 8 – UI CT RRES Averaged & Aggregated Data by Installer Attachment 9 – Eversource and UI Application Data Dictionary These Attachments include Residential Renewable Energy Solutions (RRES) program data for projects that received an approval to Energize/Permission to Operate between January 1, 2022 and June 30, 2026. The number of Eversource systems enrolled in the Program which are unable to support the addition of a non-bypassable charge is currently zero (includes Netting projects on time of use rates with multiple RRES production meters of varying non-bypassable charge amounts). In the event of any questions, please do not hesitate to contact the undersigned. Respectfully submitted, The Connecticut Light and Power Company d/b/a Eversource Energy Vincent P. Pace Vincent P. Pace, Esq. Assistant General Counsel Eversource Energy P.O. Box 270 ___ The United Illuminating Company By: Alex Soter Alex Soter Counsel UIL Holdings Corporation As Agent for The United Hartford, CT 06141-0270 Email: [email removed] Illuminating Company 180 Marsh Hill Road Orange, CT 06477 Email: [email removed]