To CL&P; UI, questions 22 thru 26
Filed by CAE
Part of
Annual Residential Renewable Energy Solutions Program Review and Rate Setting - Year 6
- Type of filing
- Interrogatory (Interrogatories)
- Date filed
- August 3, 2026
- Filed by
- CAE
- Files
- 1
As listed on the current system
Interrogs from CAE to CL&P;UI 22 thru 26-Issued 08/03/2026 [26-08-02]
Files1
26-08-02 Interrogatories Set 2.pdf
PDF · 163 KB · 5 pagesText searchable
Download 26-08-02 Interrogatories Set 2.pdfRead the text of 26-08-02 Interrogatories Set 2.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
August 3, 2026
In reply, please refer to:
Docket No. 26-08-02
Re: Docket No. 26-08-02 – Annual Residential Renewable Energy Solutions Program
Review and Rate Setting – Year 6
Enclosed are interrogatories numbered CAE-22 through CAE-26, directed
individually to the Connecticut Light and Power Company d/b/a Eversource Energy
(Eversource) and The United Illuminating Company (UI; together with Eversource, the
electric distribution companies or EDCs); CAE-27 through CAE-30, directed to UI; and
CAE-31 through CAE-32, directed to the Connecticut Green Bank.
The responses to these questions have been deemed necessary by the Public
Utilities Regulatory Authority (Authority) in connection with the above-referenced docket
and will become a part of the record in this proceeding. Please note that persons
responsible for responses must be available for cross-examination during a hearing, if
held, and must attest to the truth and accuracy of their responses.
Please submit the responses to the Authority’s Executive Secretary no later than
August 17, 2026, at 4:00 p.m. The Authority encourages the submission of responses
as soon as they are available rather than delaying until all answers are completed. Please
list each question and answer on the same sheet of paper using a separate sheet
for each interrogatory number, and sequentially number the pages of each
response (e.g., p. 1 of 5, etc.). At the top of each page, clearly identify the Docket
Number, the interrogatory number (including the prefix), the name of the company
and the person responsible for the response, and the date of submission.
Similarly, each Late Filed Exhibit that may be submitted after hearing in this
docket shall be sequentially numbered and identified with the Docket Number, Late
Filed Exhibit Number, page number, the name of the company and the person
responsible for the exhibit, and the date of submission.
If a response to any of the requested information has already been filed in response
to another Parties’ interrogatory(ies) in this proceeding, please reference the interrogatory
which provides the information. It is the respondent’s responsibility to ensure that any
such information is on file with the Executive Secretary of the Authority.
ELECTRONIC SUBMISSION OF FILINGS
IMPORTANT NOTE: The Authority has indefinitely suspended the paper
copy filing requirement. Anyone filing material with the Authority should file only
an electronic copy through the PURA Web Filing System. Please refer to the
Electronic Filing webpage for more information, including on confidential
materials: Make An Electronic Filing
CONFIDENTIAL DOCUMENTS
No confidential material may be filed publicly through the web filing system.
Confidential material can be filed electronically by emailing the material to
[email removed] with a subject line labeled in all capital letters “CONFIDENTIAL
MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic
confidential information shall also contain a header “CONFIDENTIAL – NOT FOR
PUBLIC DISCLOSURE.” The motion for a protective order shall be filed electronically.
The Authority operates with the strong presumption that all documents filed with it
are public records subject to the right of public inspection and copying in accordance with
the Connecticut Freedom of Information Act, Conn. Gen. Stat. §1-200 et. seq. In those
exceptional circumstances where a participant believes that information it intends to file
is confidential under law, it may file a Motion for a Protective Order requesting an
exemption from public disclosure. The Motion must provide specific legal arguments with
reference to state or federal law describing with supporting facts why the information
should be kept confidential. A certified affidavit supplied by a competent witness in
support of the Motion must be appended to the Motion. The Authority will rule on the
Motion forthwith, and it will give further direction as necessary.
The current service list for this docket is available on the Authority's website
located at http://www.dpuc.state.ct.us/DPUCPublicList.NSF.
By the Direction of the Authority,
PUBLIC UTILITIES REGULATORY AUTHORITY
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Enclosure
cc:
Service List
Docket No. 26-08-02
Annual Residential Renewable Energy Solutions Program Review and Rate Setting –
Year 6
Interrogatories CAE-22 through CAE-26 are directed individually to The
Connecticut Light and Power Company d/b/a Eversource Energy (Eversource) and
The United Illuminating Company (UI; together with Eversource, the electric
distribution companies or EDCs).
CAE-22
Eversource Comments, May 28, 2026, pp. 3-4; UI Comments, May 28, p.
3. Provide a recommended approach for determining the starting utility rate
for customers enrolled in a low-income discount rate.
CAE-23
Sunrun Inc, Tesla, IGS, Connecticut Solar & Storage Association,
GoodLeap, and Earthlight Technologies Comments, May 28, 2026, p. 14.
Confirm that PowerClerk can currently receive an uploaded, signed
customer disclosure form as part of RRES application, and that no customer
disclosure form information must be entered as part of the RRES Program
application.
CAE-24
Eversource Comments, May 28, 2026, pp. 7-8; UI Comments, May 28,
2026, pp. 4-5. The EDCS note that the RRES Program requires that the
eligible solar PV system be located on the eligible property; however, the
EDCs also suggest that PURA consider additional siting requirements to
focus MFAH eligibility to systems located on or at the property they serve.
Clarify whether MFAH systems have been approved or deployed that are
not located on the eligible property.
CAE-25
Id. Provide a list of multi-family affordable housing (MFAH) approved
through the RRES Program to date. For each MFAH project, provide the
year approved, size (kW AC), number of units served, MFAH tier, and
whether the siting requires a new service at a separate interconnection point
from the existing building load.
CAE-26
Id. Comment on the administrative feasibility, including cost and timeline,
to implement differentiated Buy-All compensation rates for 1 to 4-unit
properties and MFAH properties.
Interrogatories CAE-27 through CAE-30 are directed to UI.
CAE-27
Reference UI Interrog. Resp. CAE-8; Eversource Interrog. Resp. CAE-8.
Explain why UI was unable to estimate the cost or timeline for PowerClerk
changes (specifically, updating the customer disclosure form and adding
three new fields) without engaging a third-party PowerClerk system vendor.
Eversource states that the changes can be implemented in 1-2 months and
at no additional cost, as the changes fall within the scope of PowerClerk
maintenance. Discuss whether UI has an existing contract for PowerClerk
maintenance, and provide an estimate of the cost and timeline to implement
the changes discussed in Eversource’s response to Interrog. CAE-8.
CAE-28
Eversource Comments, May 28, 2026, p. 6.
a. Confirm that UI’s RRES Program metering diagrams and guidelines clearly
state the requirement that no load (except for parasitic load to operate the
coupled solar and storage system) may be connected behind the utility
production meter.
b. Does UI have evidence of customers who have installed system
configurations that do not comply with this requirement? If so, provide the
number of such customers and discuss the specific system configurations
involved.
CAE-29
Eversource Comments, May 28, 2026, pp. 6-7. Does UI agree that
customers generally should not be credited or charged for operating DERs
independent of the power system during outages? Explain why or why not.
CAE-30
Motion No. 24, May 5, 2026, Docket No. 25-08-02. Provide, in an unlocked
Excel spreadsheet, an anonymized list of DC-coupled solar and energy
storage RRES systems in UI’s territory that are the basis for this concern.
The spreadsheet should include, at a minimum, include: operational status
(i.e., operational vs in queue), size of PV system (kW), size of energy
storage (kW and kWh), and make and model of DC-coupled inverter.
Interrogatories CAE-31 through CAE-32 are directed to the Connecticut Green Bank
(CGB).
CAE-31
CGB Comments, May 28, 2026, p. 5. For each potential solution listed for
DC-coupled solar and storage, provide an estimate of the cost to
participants.
CAE-32
Id., p. 4. Discuss the prevalence of DC-coupled solar and storage systems
compared to AC-coupled systems, as well as any anticipated technological
changes or adoption trends in the future.