Compliance with Order No. 13
Filed by Avangrid
Part of
Annual Residential Renewable Energy Solutions Program Review and Rate Setting - Year 6
- Type of filing
- Compliance filing (Compliance Filing, Order No. 13)
- Date filed
- October 30, 2026
- Filed by
- Avangrid
- Files
- 1
As listed on the current system
Compliance Filings, 10/30/2026 [26-08-02] Order No.13 / Avangrid / Compliance with Order No. 13
Files1
2026-10-30 Order No. 13 Q3 2026 UI Cover Ltr 26-08-02.pdf
PDF · 396 KB · 2 pagesText searchable
Download 2026-10-30 Order No. 13 Q3 2026 UI Cover Ltr 26-08-02.pdfRead the text of 2026-10-30 Order No. 13 Q3 2026 UI Cover Ltr 26-08-02.pdf
October 30, 2026
Mr. Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, CT 06051
Re:
Docket No. 26-08-02, Annual Residential Renewable Energy Tariff Program Review
and Rate Setting – Year 6, Compliance with Order No. 13 of the Final Decision in
Docket No. 25-08-02
Dear Mr. Gaudiosi,
The United Illuminating Company (“UI” or the “Company”) hereby submits the following
information to the Public Utilities Regulatory Authority (“PURA”) as compliance with Order No.
13 of the Final Decision in Docket 25-08-02 (“Decision”) dated December 17, 2025.
Order No. 13 of the Decision states:
Reference Year 2 Decision, Order No. 17, p. 36: No later than May 1, 2023, and
quarterly thereafter for the remainder of the RRES Program, the EDCs shall submit
information for the prior quarter (e.g., January 1, 2023 through March 31, 2023
for the May 1, 2023 filing) on the following items related to RRES Program
applications: (1) the length of time from application to submission to tariff review
approval; (2) the length of time from tariff review approval to interconnection
contingent approval; (3) the length of time to receive the work order number needed
to apply for permits from cities and towns; (4) the length of time to process
payments when applicable; (5) the length of time for any applicable witness tests;
(6) the number of days between when the utility is notified of a completed inspection
to meter installation; and, [(7)] the length of time for final issuance of the
permission to operate. The RRES APWG may recommend additions to this list in
their final report filed on December 14, 2022. Such filings shall be submitted in the
relevant RRES Program review docket (e.g., any updates related to Year 2 of the
RRES Program shall be disclosed in this proceeding, Docket No. 22-08-02).
In response to those directives, UI provides Table 1 (below), showing quarterly applications data
for Residential Renewable Energy Solutions Program from July 1, 2026 through September 30,
2026. To deliver the most up-to-date and valid information, all data contained therein is based on
energization application information available at the time of data retrieval. Using energized
application ensures all milestone dates are available, which eliminates incomplete projects from
skewing the data and identifies projects reaching the relevant milestones or Permission to Operate
180 Marsh Hill Road, Orange, CT 06477
www.uinet.com
An equal opportunity employer
status during the reporting period. This helps ensure that quarterly averages reported under Order
No. 13 are based on complete, chronologically valid, energized application data. Quarterly reports
may occasionally present slight deviations from previous reports.
Request #
1
2
3
Regulatory Request
The length of time from application submission to tariff
review approval
The length of time from tariff review approval to
interconnection contingent approval
The length of time to receive the work order number
needed to apply for permits from cities and towns
Average Number of
Business Days
14.8
20.5
4.1
4
The length of time to process payments when applicable
42.0
5
The length of time for any applicable witness tests
10.9
6
The number of days between when the utility is notified of
a completed inspection to meter installation
The length of time for final issuance of the permission to
operate
7.7
7
105.9
Table 1: Residential Renewable Energy Solutions Milestones - July 1, 2026 through September 30, 2026
I hereby certify service of this filing upon all parties and intervenors of record in this proceeding.
Very truly yours,
James Nitz
Manager, Regulatory Services
UIL Holdings Corporation
As Agent for The United Illuminating Company
180 Marsh Hill Road, Orange, CT 06477
www.uinet.com
An equal opportunity employer