Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Compliance with Order No. 13

Compliance Filing, Order No. 13

Filed by Avangrid

Part of

Annual Residential Renewable Energy Solutions Program Review and Rate Setting - Year 6

Type of filing
Compliance filing (Compliance Filing, Order No. 13)
Date filed
October 30, 2026
Filed by
Avangrid
Files
1

As listed on the current system

Compliance Filings, 10/30/2026 [26-08-02] Order No.13 / Avangrid / Compliance with Order No. 13

This filing on the current system (opens in a new tab)

Files1

October 30, 2026 Mr. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 26-08-02, Annual Residential Renewable Energy Tariff Program Review and Rate Setting – Year 6, Compliance with Order No. 13 of the Final Decision in Docket No. 25-08-02 Dear Mr. Gaudiosi, The United Illuminating Company (“UI” or the “Company”) hereby submits the following information to the Public Utilities Regulatory Authority (“PURA”) as compliance with Order No. 13 of the Final Decision in Docket 25-08-02 (“Decision”) dated December 17, 2025. Order No. 13 of the Decision states: Reference Year 2 Decision, Order No. 17, p. 36: No later than May 1, 2023, and quarterly thereafter for the remainder of the RRES Program, the EDCs shall submit information for the prior quarter (e.g., January 1, 2023 through March 31, 2023 for the May 1, 2023 filing) on the following items related to RRES Program applications: (1) the length of time from application to submission to tariff review approval; (2) the length of time from tariff review approval to interconnection contingent approval; (3) the length of time to receive the work order number needed to apply for permits from cities and towns; (4) the length of time to process payments when applicable; (5) the length of time for any applicable witness tests; (6) the number of days between when the utility is notified of a completed inspection to meter installation; and, [(7)] the length of time for final issuance of the permission to operate. The RRES APWG may recommend additions to this list in their final report filed on December 14, 2022. Such filings shall be submitted in the relevant RRES Program review docket (e.g., any updates related to Year 2 of the RRES Program shall be disclosed in this proceeding, Docket No. 22-08-02). In response to those directives, UI provides Table 1 (below), showing quarterly applications data for Residential Renewable Energy Solutions Program from July 1, 2026 through September 30, 2026. To deliver the most up-to-date and valid information, all data contained therein is based on energization application information available at the time of data retrieval. Using energized application ensures all milestone dates are available, which eliminates incomplete projects from skewing the data and identifies projects reaching the relevant milestones or Permission to Operate 180 Marsh Hill Road, Orange, CT 06477 www.uinet.com An equal opportunity employer status during the reporting period. This helps ensure that quarterly averages reported under Order No. 13 are based on complete, chronologically valid, energized application data. Quarterly reports may occasionally present slight deviations from previous reports. Request # 1 2 3 Regulatory Request The length of time from application submission to tariff review approval The length of time from tariff review approval to interconnection contingent approval The length of time to receive the work order number needed to apply for permits from cities and towns Average Number of Business Days 14.8 20.5 4.1 4 The length of time to process payments when applicable 42.0 5 The length of time for any applicable witness tests 10.9 6 The number of days between when the utility is notified of a completed inspection to meter installation The length of time for final issuance of the permission to operate 7.7 7 105.9 Table 1: Residential Renewable Energy Solutions Milestones - July 1, 2026 through September 30, 2026 I hereby certify service of this filing upon all parties and intervenors of record in this proceeding. Very truly yours, James Nitz Manager, Regulatory Services UIL Holdings Corporation As Agent for The United Illuminating Company 180 Marsh Hill Road, Orange, CT 06477 www.uinet.com An equal opportunity employer