Ruling: Other
Filed by PURA
Part of
Annual Residential Renewable Energy Solutions Program Review and Rate Setting - Year 6
- Type of filing
- Ruling (Ruling on Motion No. 008)
- Date filed
- October 28, 2026
- Filed by
- PURA
- Files
- 1
As listed on the current system
Ruling to Motion No.: 008 - 10/28/2026 (PURA) - Type Ruling = Other [26-08-02]
Files1
260802-102826.pdf
PDF · 590 KB · 51 pagesText searchable
Download 260802-102826.pdfRead the text of 260802-102826.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-08-02
ANNUAL RESIDENTIAL RENEWABLE ENERGY
SOLUTIONS PROGRAM REVIEW AND RATE
SETTING – YEAR 6
October 28, 2026
By the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Janice A. Beecher
Holly H. Cheeseman
Everett Smith, III
DECISION
TABLE OF CONTENTS
I.
INTRODUCTION ..........................................................................................................1
A. SUMMARY ................................................................................................................1
B. BACKGROUND OF THE PROCEEDING ..........................................................................1
C. CONDUCT OF THE PROCEEDING ................................................................................2
D. PARTICIPANTS ..........................................................................................................3
II. LEGAL AUTHORITY ....................................................................................................3
III. PROGRAM OBJECTIVES ...........................................................................................3
IV. AUTHORITY ANALYSIS..............................................................................................4
A. PROGRAM OVERVIEW ...............................................................................................4
B. RATE SETTING..........................................................................................................6
1. General Methodology ....................................................................................6
2. Stakeholder Comments ................................................................................7
3. Rate Setting Calculations .............................................................................8
4. Summary – 2027 Compensation Rates.......................................................8
C. PROPOSED APPLICATION FEES .................................................................................9
1. Interconnection Fee Adder .........................................................................10
D. CONTRACTOR COMPLIANCE ....................................................................................12
1. Standardized Terminology and Changes to CDF ....................................15
2. Customer’s Annual Electricity Usage .......................................................16
3. Utility Escalation Rate .................................................................................16
4. PV Degradation Rate ...................................................................................17
5. Estimated Year One Net Savings ..............................................................18
6. Estimated Multi-Year Net Savings .............................................................18
7. Starting Average Utility Rate ......................................................................19
8. Timing of CDF Presentation to Customers ..............................................22
9. Implementation Timing ...............................................................................24
E. DC-COUPLED SOLAR AND STORAGE SYSTEMS .......................................................25
F. MFAH ELIGIBILITY REQUIREMENTS ........................................................................29
G. PROPOSED PROGRAM DOCUMENT CHANGES ..........................................................31
V. CONCLUSION AND ORDERS ..................................................................................31
A. CONCLUSION ..........................................................................................................31
B. EXISTING AND NEW ORDERS ...................................................................................31
1. Standing Orders to be filed in RRES Annual Review Dockets ..............32
2. New Orders ...................................................................................................38
DECISION
I.
INTRODUCTION
A.
SUMMARY
In this Decision, the Public Utilities Regulatory Authority (Authority or PURA)
approves updates to the Residential Renewable Energy Solutions Program (RRES
Program or Program), administered by The Connecticut Light and Power Company d/b/a
Eversource Energy (Eversource) and The United Illuminating Company (UI; collectively,
with Eversource, the electric distribution companies or EDCs). The approved changes
are intended to better align the RRES Program with the program objectives. The Decision
also sets the RRES Program Tariff rates for project applications received in calendar year
2027.
B.
BACKGROUND OF THE PROCEEDING
On February 10, 2021, the Authority issued an Interim Decision in Docket No. 2007-01, PURA Implementation of Section 3 of Public Act 19-35, Renewable Energy Tariffs
and Procurement Plans (Residential Tariff Decision), establishing renewable energy
tariffs for residential customers of each EDC effective January 1, 2022, through
December 31, 2027, pursuant to General Statutes § 16-244z subsections (b), (d), (e),
and portions of subsection (c). In the Residential Tariff Decision, the Authority established
five objectives to guide the development, implementation, and administration of the RRES
Program (Program Objectives).
The approved tariff program was subsequently named the RRES Program. The
Authority initiates a docket annually to review key RRES Program metrics, including
deployed megawatts (MW) and low- and moderate-income customer participation, and to
ensure the Program is “on track to at least maintain historical deployment levels and to
deliver a carbon free grid by 2040.” Residential Tariff Decision, p. 40.
The Authority utilizes the annual proceeding to “set the [RRES Program] Tariff
rates, any separate [renewable energy certificate (REC)] payments, and any fully, nonbypassable charges for Program applications received during the following calendar
year.” Id. The Authority also uses the docket to evaluate the key data inputs, in addition
to MW deployed, necessary to establish the annual RRES Program Tariff rates. Id.
The Authority conducted the first annual RRES Program review in Docket No. 2108-02, Annual Residential Renewable Energy Tariff Program Review and Rate Setting,
issuing decisions on October 6, 2021 (Year 1 Decision), January 5, 2022, and June 8,
2022. The decisions respectively finalized the manual (Program Manual) and set the
RRES Program tariff rates for project applications received in calendar year 2022,
provided limited modification and clarifications of the RRES Program Manual, and
established eligibility and participation guidance for affordable housing in the RRES
Program.
Docket No. 26-08-02
Page 2
The Authority conducted the second annual RRES Program review in Docket No.
22-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 2,
issuing decisions on November 2, 2022 (Year 2 Decision), and February 8, 2023. The
decisions finalized the Year 2 Program Manual, established RRES Program tariff rates
for project applications received in calendar year 2023, and authorized several changes
to the application process to better align the Program with the Program Objectives.
The Authority conducted the third annual RRES Program review in Docket No. 2308-02, Annual Residential Renewable Energy Solutions Program Review – Year 3,
issuing decisions on November 1, 2023 (Year 3 Decision), and July 10, 2024. The
decisions finalized the Year 3 Program Manual, established RRES Program tariff rates
for project applications received in calendar year 2024, authorized several changes to the
Program to better align with the Program Objectives, and established eligibility and
participation guidance for master-metered affordable housing in the RRES Program.
The Authority conducted the fourth annual RRES Program review in Docket No.
24-08-02, Annual Residential Renewable Energy Solutions Program Review – Year 4,
issuing a decision on October 16, 2024 (Year 4 Decision). The decision set the RRES
Program tariff rates for project applications received in calendar year 2025 and authorized
changes to metering and wiring requirements.
The Authority conducted the fifth annual RRES Program review in Docket No. 2508-02, Annual Residential Renewable Energy Solutions Program Review – Year 5,
issuing a decision on December 17, 2025 (Year 5 Decision). The decision set the RRES
Program tariff rates for project applications received in calendar year 2026 and approved
several changes to the RRES Program documents.
This proceeding was initiated pursuant to the Residential Tariff Decision in order
to ensure the continued successful implementation of the RRES Program.
C.
CONDUCT OF THE PROCEEDING
On April 24, 2026, the Authority issued the Notice of Proceeding in the abovecaptioned proceeding.
On May 11, 2026, the Authority issued a Notice of Request for Written Comments
on the following topics: rate setting; Contractor Compliance Working Group report; and
solar production measurement for DC-coupled solar and storage systems. On May 28,
2026, the Authority received six sets of written comments from interested stakeholders.
On August 18, 2026, the Authority held a Technical Meeting to discuss the topics
outlined in the May 11, 2026 Notice of Request for Written Comments.
On August 4, 2026, the Authority issued a second Notice of Request for Written
Comments on the following topics: program document updates, application fees, and
multi-family affordable housing eligibility requirements. On August 19, 2025, the Authority
received seven sets of written comments from Program stakeholders.
Docket No. 26-08-02
Page 3
The Authority issued a Proposed Final Decision on October 1, 2026, and provided
an opportunity for Participants to file Written Exceptions.
D.
PARTICIPANTS
A listing of all Participants to this proceeding is appended hereto as Appendix A.
II.
LEGAL AUTHORITY
The RRES Program was established pursuant to subsections (b), (d), and (e), and
portions of subsection (c) of section 3 of the Public Act 19-35, An Act Concerning a Green
Economy and Environmental Protection, now codified in General Statutes § 16-244z.
General Statutes § 16-244z(b)(1) required the Authority to establish tariffs for each
electric distribution company (EDC) to purchase from residential customers Class I
renewable energy from projects located on a residential customer’s own premises as well
as rates for such tariffs. Additionally, General Statutes § 16-244z(b)(1) permits the
Authority to modify the tariff rates based on changed circumstances.
The Authority determined in the Residential Tariff Decision that it would initiate an
annual docket to review key RRES Program metrics, including, but not limited to,
deployed MW and low- and moderate-income customer participation, and to ensure the
Program is “on track to at least maintain historical deployment levels and to deliver a
carbon free grid by 2040.” Residential Tariff Decision, p. 40.
The Authority reviews the RRES Program design documents and Program
Manual, relevant compliance filings, and current tariff rates to determine if and how the
RRES Program can and should be modified to better align with the direction provided in
the Residential Tariff Decision.
III.
PROGRAM OBJECTIVES
In the Residential Tariff Decision, the Authority established the following five
Program Objectives to guide the development, implementation, and administration of the
RRES Program.
1. The sustained, orderly development of the state’s solar
industry, ensuring at a minimum that Connecticut’s annual
historical deployment of residential solar is maintained (i.e.,
approximately 50-60 MW per year);
2. Achieve a 100% zero carbon electric grid by 2040, including
by promoting additional annual deployment of residential
renewable energy as needed;
3. Balance participant costs and benefits with non-participant
costs and benefits and electric system costs and benefits;
4. Ensure program accessibility for customers, by providing
customer protections both explicitly through resources and
disclosure forms, and also through simplified program and
tariff designs;
Docket No. 26-08-02
Page 4
5. Encourage increased inclusivity overall, as well as program
participation by low- and moderate-income (LMI) customers
and customers in environmental justice communities.
Residential Tariff Decision, p. 7.
The Authority relied on the Program Objectives in evaluating the current RRES
Program design and assessing any possible changes to be ordered in this proceeding
with the objective of better aligning the RRES Program with the Program Objectives and
the direction provided in the Residential Tariff Decision. The Authority reaffirms that the
Program Objectives shall guide the Program Administrators in their administration of the
RRES Program, particularly in instances (1) not explicitly addressed through the
approved RRES Program documents or through Authority direction in prior Decisions or
motion rulings and (2) where the EDCs are empowered to make administrative changes
without PURA approval (See Section IV.N. of the Year 2 Decision).
IV.
AUTHORITY ANALYSIS
A.
PROGRAM OVERVIEW
In the Residential Tariff Decision, the Authority established a statewide, six-year
residential solar program to be administered by the EDCs in their respective service
territories. The RRES Program was created to ensure the continued growth of the
residential renewable energy market upon the conclusion of the prior Residential Solar
Investment Program (RSIP) and the sunsetting of traditional net metering on December
31, 2021. See General Statutes § 16-244z.
The RRES Program gives residential customers the opportunity to sell energy and
renewable energy certificates (RECs) from an eligible project, such as a solar photovoltaic
(PV) system, for a 20-year term under one of two tariff rate structures: (1) Buy-All; or (2)
Netting.
Under the Buy-All tariff, the solar project is provided fixed compensation for all
energy and RECs produced over the 20-year term. Compensation is provided to
customers in the form of monetary on-bill credits, with the potential for an annual cash out
for credits that exceed the customer’s utility bills upon customer request.
Under the Netting tariff, projects are compensated for the net energy produced
(i.e., all energy production not consumed within the monthly netting period) at the retail
electric rate at the time of generation. A customer’s billed energy usage is reduced by
the energy produced and used onsite. The EDCs provide customers with monetary onbill credits for any excess energy exported to the grid. Additionally, the EDCs purchase
all RECs generated by the project at the applicable REC incentive rate or assess a nonbypassable charge on each kilowatt-hour (kWh) produced.
Table 1, below, provides a summary of the RRES Program Tariff rates and adders
for project applications received in calendar year 2026.
Docket No. 26-08-02
Page 5
Table 1: 2026 RRES Tariff Rates
Buy-All Rate
($/kWh)
Eversource
UI
Income-Eligible Adder
Distressed Municipality Adder
See Year 5 Decision, p. 13.
0.3289
0.3289
0.055
0.0275
Netting REC Rate / NonBypassable Charge
($/kWh)
-0.0402
-0.0402
0.035
0.0175
Table 2 includes a summary of application data from the start of the program in
2022 through June 2026. Over that period, roughly 564 MW have been approved for the
Program.
Table 2: RRES Program Applications, January 2022-June 2026
Total
Applications
3,259
Total
Application kW
31,493
Approved
Applications
3,417
Approved
kW
32,901
1,006
8,338
855
7,211
2026
JanJune
2025
Eversource
UI
Eversource
UI
12,850
3,616
114,083
29,239
12,950
3,301
114,838
26,060
2024
Eversource
UI
Eversource
UI
Eversource
12,600
3,185
17,412
3,469
12,460
101,394
25,272
137,691
27,994
100,238
11,996
2,991
17,565
3,373
11,168
96,446
21,441
138,527
23,557
89,570
UI
Eversource
UI
Both EDCs
2,371
58,581
13,647
72,228
16,579
484,900
107,423
592,323
1,898
57,096
12,418
69,514
13,160
472,282
91,430
563,712
2023
2022
Total
Eversource Compliance, July 15, 2026, Att. 1; UI Compliance, July 15, 2026, Att. 1; UI
Compliance, Jan. 17, 2023, Docket No. 22-08-02, Att. 1.
Table 3 includes a summary of projects deployed from 2022 through June 2026.
Over that period, roughly 456 MW of approved projects have been deployed through the
program.
Docket No. 26-08-02
Page 6
Table 3: RRES Program Deployment January 2022-June 2026
2026
Jan-June
2025
2024
2023
2022
Total
Eversource
UI
Eversource
UI
Eversource
UI
Eversource
UI
Eversource
UI
Eversource
UI
Both EDCs
Systems
Deployed
3,934
1,290
11,569
2,573
11,195
2,347
14,855
2,612
5,533
579
47,086
9,401
56,487
Capacity
Deployed (kW)
34,743
10,101
99,200
20,301
87,146
17,825
119,534
19,438
44,242
3,894
384,865
71,558
456,423
Eversource Compliance, July 15, 2026, Att. 1; UI Compliance, July 15, 2026, Att. 1; UI
Compliance, Jan. 17, 2023, Docket No. 22-08-02, Att. 1.
B.
RATE SETTING
1. General Methodology
General Statutes § 16-244z(b)(1) specifies that the Authority establish rates for
renewable energy tariffs based on either competitive solicitations or “the average cost of
installing the generation project and a reasonable rate of return that is just, reasonable
and adequate”, and permits the Authority to “modify such rate for new customers under
this subsection based on changed circumstances.”
In setting tariff rates for future Program years, the Authority is guided by the three
rate-setting objectives outlined in the Residential Tariff Decision. First, the Authority
seeks to foster the sustained, orderly development of the state’s solar industry.
Residential Tariff Decision, p. 37. Second, the Authority seeks to deploy residential
renewable energy systems through the RRES Program to help achieve a 100% zero
carbon grid by 2040. Id. Third, the Authority seeks to balance RRES Program participant
costs and benefits with the costs and benefits to non-participating ratepayers and the
electric system as a whole. Id. Ultimately, the Authority weighs all three objectives in
establishing RRES Program Tariff rates but errs on the side of setting such rates no higher
than necessary to achieve these objectives. Year 1 Decision, p. 5.
When authorizing the Program, the Authority relied on analysis from the
Connecticut Green Bank (CGB) to determine the appropriate rate of return needed to
Docket No. 26-08-02
Page 7
meet the rate-setting objectives. Residential Tariff Decision, p. 38. Based on CGB data
and stakeholder testimony, the Authority subsequently determined that the rate of return
that was necessary to achieve these objectives was 9 – 11%. Id. Finally, to calculate the
ratepayer support necessary to achieve this rate of return, the Authority found the
following values necessary to consider: “1) Average upfront installed system cost; 2) the
federal Investment Tax Credit (ITC); 3) Ongoing operations and maintenance (O&M)
costs; 4) System performance (e.g., capacity factor); 5) Retail electricity rates, including
an assumed escalation factor; and 6) the unlevered [internal rate of return (IRR)] for each
tariff (i.e., the buy-all and netting tariffs).” Year 1 Decision, p. 6.
In addition, Public Act 25-173, An Act Concerning Energy Affordability, Access,
and Accountability, requires the Authority, beginning January 1, 2026, to establish a nonbypassable charge for the Netting tariff of at least 3.25 cents per kWh and adjust the BuyAll tariff rate to be “substantially similar” in value.
2. Stakeholder Comments
Eversource reports that the average installed cost of RRES systems, calculated
from PowerClerk application data, was $3.71 per watt DC in 2025 and $3.69 per watt in
the first quarter of 2026. Eversource Comments, May 28, 2026, p. 2. For RRES systems
installed in UI territory, the average cost was $4.30 per watt DC in 2025 and $4.28 per
watt in the first quarter of 2026. UI Comments, May 28, 2026, p. 2.
Sunrun Inc. (Sunrun), Tesla, GoodLeap, IGS, the Connecticut Solar & Storage
Association (ConnSSA), and Earthlight Technologies (collectively, the Joint Solar Parties)
note several factors creating a challenging market environment for residential solar and
impacting RRES deployment figures. Joint Solar Party Comments, May 28, 2026, pp. 12. Notably, the 25D Residential Clean Energy Credit for homeowner-owned systems is
no longer available as of 2026, which created a “small surge in applications in the second
half of 2025” and an expected market contraction in 2026. Id., p. 2. While the section
48E Clean Electricity Investment Credit for third-party-owned (TPO) systems remains
available through 2027, the Joint Solar Parties state that the lack of clarity regarding
elements of the Foreign Entity of Concern (FEOC) requirements and federal trade policies
continue to create uncertainty and price increases. Id. Additionally, the Joint Solar
Parties assert that the $0.402 cent per kWh non-bypassable charge and utility rate
decreases, in combination, result in the lowest RRES Netting tariff value for participants
since the start of the program in 2022. Id., p. 3. RRES applications in the first quarter of
2026 were significantly lower than the first quarter of recent program years (2023-2025),
a drop that parallels the national residential solar market trend. Id., p. 4.
The Joint Solar Parties state that Eversource’s and UI’s residential rates as of July
1 will be approximately $0.236 and $0.266 per kWh, respectively, which are lower than
what was modeled in the Year 5 Residential Tariff Model and, if incorporated into the
model, would result in a recommended REC adder rather than a non-bypassable charge.
Accordingly, the Joint Solar Parties assert that a non-bypassable charge of $0.0325/kWh,
as required by Public Act 25-173, would be appropriate for 2027. Id., p. 5. In general,
the Joint Solar Parties argue that the Authority should limit significant structural changes
Docket No. 26-08-02
Page 8
to the program for the 2027 program year as it will be the final full year of the RRES
Program. Id., p. 1.
Office of Consumer Counsel (OCC) expresses concern that the loss of the
investment tax credit (ITC), which has historically contributed about 11 cents per kWh to
residential solar project economics, will put upward pressure on upfront costs. OCC
Comments, May 28, 2026, p. 2. OCC argues that the residential solar industry is now
mature and robust, and it would not be appropriate to transfer the loss of the ITC to
Connecticut ratepayers by increasing compensation rates. Id. If upfront costs continue
to increase, OCC recommends PURA consider approving a more limited volume of MW
in 2027 rather than increasing ratepayer support per project. Id.
3. Rate Setting Calculations
As in past years, the Authority based its rate setting process on the Residential
Tariff Model adopted in the Year 1 Decision. To reflect updated market conditions, the
Authority updated the following inputs in the model since it was last used to set 2026
compensation rates in the Year 5 Decision: (1) retail electric rates and historical
escalation factor; and (2) average installed cost, using an average of the EDCs’ reported
RRES project costs per watt in 2025 and 2026. An updated version of the Residential
Tariff Model is appended to this Decision as Appendix B, Residential Tariff Model – 2027.
Consistent with the approach taken in the Year 5 Decision, the Authority sets
baseline tariff rates based on the model outputs for TPO systems, which remain eligible
for the ITC (with certain restrictions) through 2027. Year 5 Decision, pp. 11-12.
Additionally, the Authority maintains the 10% target IRR for both Netting and Buy-All
systems used in the Year 5 Decision. Id., p. 11.
Additionally, the Authority adjusted the utility escalation rate to be calculated based
on a 20-year historical average rather than the 16-year average used in the 2026
Residential Tariff Model. This change was made for consistency with the adoption of a
standardized maximum utility escalation rate for contractor use, which is based on a 20year average of utility rates (see Section D.3).
Applying an IRR of 10% for the Buy-All tariff, the Residential Tariff Model returns
a compensation rate of $0.3289, reflecting minimal change in the average installed cost
of solar compared to the previous year.
Using a target IRR of 10% for the Netting tariff, the Residential Tariff Model returns
a non-bypassable charge of $0.0067 per kWh for Eversource and $0.0657 per kWh for
UI. For Eversource, this non-bypassable charge value is below the required $0.0325 per
kWh pursuant to Public Act 25-173, Section 9. Accordingly, the Authority authorizes the
required $0.0325 non-bypassable charge for RRES systems that apply to the program in
Eversource territory in 2027.
The Residential Tariff Model returns a higher non-bypassable charge for UI due to
UI’s higher residential retail rates. In previous years, the Authority has maintained
Docket No. 26-08-02
Page 9
equivalent Netting rates for both EDCs despite UI’s higher retail rates, largely because
RRES Program deployment in UI service territory has historically lagged that of
Eversource. Year 3 Decision, pp. 9-10; Year 5 Decision, p. 11. However, recent RRES
data indicate that deployment in UI territory has reached or surpassed 20% of the program
total, the expected proportion based on each EDCs’ total annual load. Projects in UI
territory made up about 18% and 25% of the total number of deployed projects in 2025
and the first half of 2026, respectively, and about 20% of total program approved
applications in 2025 and the first half of 2026. As a result, the Authority concludes that
program maturity and financial value to participants have supported an increased
proportion of program deployment in UI service territory despite an increase in the nonbypassable charge in 2026. Accordingly, the Authority authorizes a non-bypassable
charge of $0.0657 per kWh for systems that apply to the program in UI territory in 2027.
a. Adder Values
Finally, to promote continuity in the final year of the RRES Program and absent
stakeholder comments to the contrary, the Authority will maintain the current incomeeligible and distressed municipality adder values for both the Buy-All and Netting tariffs.
4. Summary – 2027 Compensation Rates
A summary of the RRES Year 6 compensation rates is available in Table 4 below.
Table 4: 2027 RRES Tariff Rates
Buy-All Rate
($/kWh)
Eversource
0.3289
Netting REC Rate / NonBypassable Charge
($/kWh)
-0.0325
UI
Income-Eligible Adder
Distressed Municipality Adder
0.3289
0.055
0.0275
-0.0657
0.035
0.0175
C.
PROPOSED APPLICATION FEES
Order No. 2 of the Year 5 Decision directed the EDCs to file annually, by August
1, a proposed application fee to cover the estimated administrative costs associated with
processing applications, including detailed calculations to justify the proposed fee. Year
5 Decision, pp. 29-30.
Eversource proposes no changes to the current application fee of $163. Motion
No. 4, July 28, 2026, Att. 1. Eversource states that it collected $1,520,126 in fees from
approximately 9,985 applications over the 12 months ending June 30, 2026 and expects
to incur $1,760,735 in program operation costs for 2026. Id. Based on these amounts,
Eversource’s administrative cost per application is about $176, with a cost of
approximately $5 per application for services to enable integrated payment of application
fees within the application portal and about $0.75 per application for independent
Docket No. 26-08-02
Page 10
ombudsperson costs. Id. Eversource notes that the current fee “is offsetting a substantial
portion” of its costs to manage the RRES program and does not recommend changes for
the final program year. Id.
UI, in contrast, proposes increasing the application fee from $200 to $240. Motion
No. 5, July 31, Att. 1. UI reports that it collected $546,149 in application fees across 3,217
applications over the 12 months ending June 2026, and estimates administrative costs of
$1,001,682 related to labor and administrative support for processing RRES applications,
similar to costs in 2025. Id. UI notes that this reflects lower application volumes in 2026
compared to 2025, resulting in an estimated cost per application of $312. UI proposes
increasing the application fee to partially offset the lower fee revenue. Id.
OCC reiterates its position from past RRES Program proceedings that application
fees should be set to fully recover each EDC’s actual administrative costs without shifting
any under-recovery to non-participating ratepayers. OCC Comments, Aug. 19, 2026, p.
3. OCC does not oppose Eversource’s proposals to maintain the existing fees, but notes
that UI’s per-application costs are already significantly higher than Eversource’s; thus,
OCC argues that UI should provide a clearer breakdown of its fixed and variable
administrative cost components and an explanation of why total administrative costs
remain fixed despite a decline in application volume. Id.
Sunrun and Goodleap state that the proposed application fees are reasonable.
Sunrun and Goodleap Comments, Aug. 19, 2026, p. 2. Save the Sound also supports
the proposed fees as striking the appropriate balance among the Program Objectives.
Save the Sound Comments, August 19, 2026, pp. 1-2.
The Authority approves Eversource’s proposal to maintain the current application
fee of $163, as the application fee currently covers a large portion of the company’s
program administrative costs. The Authority also approves UI’s proposed application fee
increase from $200 to $240, finding that an increase in the application fee is appropriate
to partially offset the shortfall in application fee revenue compared to administrative costs.
Although the proposed application fees do not fully cover all RRES Program
administrative costs, the Authority’s expectation in previous program years has been that
application fees will cover most EDC costs associated with administering the Program, to
ensure that non-participating customers do not incur undue cost impacts, without creating
a barrier to program participation. See Residential Tariff Decision, p. 26; Year 3 Decision,
p. 41; Year 4 Decision, p. 15. No stakeholder argued that UI’s proposed application fee
increase would pose a barrier to participation.
Nevertheless, both EDCs anticipate that similar administrative costs related to
application processing in 2026 compared to those incurred in 2025. The Authority
presumes that, while some administrative costs are fixed, certain cost components should
vary based on application volumes. Thus, lower application volumes should result in
lower application processing costs. Additionally, questions remain regarding the extent
to which UI’s higher administrative costs per project compared to Eversource’s are
warranted. The EDCs annually recover RRES Program costs through the annual rate
Docket No. 26-08-02
Page 11
adjustment mechanism (RAM) proceedings (e.g., for 2026, Docket Nos. 26-01-03, Annual
Review of the Rate Adjustment Mechanisms of The Connecticut Light and Power
Company and 26-01-04, Annual Review of the Rate Adjustment Mechanisms of The
United Illuminating Company), where the components of administrative costs and their
drivers may be considered more fully. The EDCs may be directed to provide additional
justification of the fixed and variable components of RRES Program administrative costs
in the relevant RAM proceeding.
1. Interconnection Fee Adder
Order No. 3 of the Decision in Docket No. 22-06-29, PURA Investigation into
Distributed Energy Resource Interconnection Cost Allocation (Residential
Interconnection Cost Allocation Decision), directs the EDCs to annually file a proposed
application fee adder for interconnection applications received the following calendar
year. Decision, Dec. 20, 2023, Docket No. 22-06-29, pp. 20-21.
Neither EDC recommends changes to the current application fee adder of $25.
Motion No. 6, July 31, 2026, p. 2; Motion No. 7, Aug. 3, 2026, p. 1. Eversource reports
that it incurred $1,435,045 in capital costs associated with residential transformer
upgrades from July 2025 to June 2026, and collected $157,991 in fee adder revenue over
the same period. Motion No. 7, p. 1. While transformer upgrade costs substantially
exceeded adder fee revenue, Eversource recommends maintaining the current fee for
the final year of the RRES Program and reviewing the allocation of costs for residential
DER interconnection as part of a holistic review of renewable energy program design in
Docket No. 26-06-04, Implementation of Clean Energy Successor Programs. Id., pp. 12. Eversource notes that fee changes “require further updates to program materials and
company systems, require communications, education and outreach to program
participants, and may have further impacts on participant business operations,” and does
not recommend undertaking changes that may be in effect for only one year. Id., p. 2.
UI reports that it collected $41,025 in interconnection fee adder revenue from July
1, 2025, through June 30, 2026, while transformer upgrade costs for 14 DER-triggered
upgrades over the same period were $236,756, or an annual revenue requirement of
$195,688. Motion No. 6, p. 2; Compliance, Aug. 19, 2026, p. 2. UI notes that Order No.
5 of the Residential Interconnection Cost Allocation Decision directs the Interconnection
Working Group to assess the effectiveness of the residential DER interconnection cost
allocation policy, including potential refinements to the application fee adder and
alternative cost allocation approaches. Motion No. 6, p. 1. UI therefore recommends
maintaining the existing fee pending completion of the Interconnection Working Group’s
assessment. Id.
The Interconnection Working Group reviewed the EDCs’ interconnection fee data
and concludes that no change to the fee adder is necessary at this time. Compliance,
Aug. 19, 2026, p. 2. The Interconnection Working Group notes that although the fee
adder does not fully cover transformer upgrade costs for UI or Eversource, the monthly
bill increase for an average ratepayer to recover transformer upgrade costs is minimal
($0.003 per month for Eversource and $0.0006 per month for UI). Id. Additionally,
Docket No. 26-08-02
Page 12
Interconnection Working Group members conclude that changes to the current RRES
program may not be in customers’ interest as the program is ending soon; instead, the
implementation of renewable energy successor programs in Docket No. 26-06-04
provides a better opportunity to consider necessary changes to the fee adder and the full
cost allocation policy. Id.
Earthlight argues that the definition of “Residential DER” as set forth in the
Residential Interconnection Cost Allocation Decision, should be expanded to include
multifamily affordable housing (MFAH) projects. Earthlight Comments, Aug. 19, 2026,
pp. 1-2. Earthlight asserts that MFAH projects fall within the scope of the RRES Program
and are required to pay the same fee adder but do not benefit from the socialization of
transformer upgrade costs. Id.
The Authority finds it appropriate to maintain the current $25 interconnection fee
adder for the remainder of the RRES Program in order to maintain consistency in the final
year. However, the persistent under-collection of fee revenue compared to transformer
upgrade costs warrants additional scrutiny to ensure that the residential cost allocation
program is achieving its intended objectives. The Authority may consider potential
changes to the residential cost allocation policy, including the fee adder, in either Docket
No. 26-06-04 or Docket No. 25-03-21, PURA Investigation of Non-Residential Distributed
Energy Resource Interconnection Upgrades and Cost Allocation. Additionally, the
Authority declines to expand the residential cost allocation program to include larger
MFAH RRES projects, which may incur more significant upgrade costs compared to 1 to
4-unit residential projects, without a detailed evaluation of the cost allocation implications.
D.
CONTRACTOR COMPLIANCE
In Order No. 25 of the Year 5 Decision, the Authority requested that the Office of
Education, Outreach, and Enforcement (EOE) convene and lead a stakeholder working
group (Contractor Compliance Working Group, or CCWG) to develop recommendations
regarding specific inputs, assumptions, and calculation methodologies that should be
standardized across RRES project applications. The CCWG was directed to file a final
report of recommendations by March 31, 2026, including proposals for standardizing the
starting utility rate used to estimate net year one savings, annual utility rate escalation,
and degradation rate; the process and frequency of updating such inputs; the
incorporation of standardized calculations and assumptions into the Customer Disclosure
Form (CDF) and annual contractor filing requirements; the process for verifying and
auditing contractor compliance with standardized calculation requirements; and the date
that any proposed standardized calculation requirements should take effect for installers
in the RRES Program. Year 5 Decision, pp. 19-20, 36.
On March 31, 2026, EOE submitted the CCWG’s final report of recommendations.
EOE Corresp., March 31, 2026, CCWG Report FINAL (CCWG Final Report). The CCWG
consisted of fifteen members: CGB, ConnSSA, Earthlight Technologies, Eversource,
GoodLeap, Ion Solar, Ion Solar Pros (ISP), OCC, SAVKAT, SEIA, SunRun, Tesla, Trinity
Solar, and UI, as well as DEEP-BETP as a non-voting member. Id., p. 2. Over the course
of ten meetings between January and March 2026, the CCWG discussed and voted on
Docket No. 26-08-02
Page 13
24 proposals. Id., p. 4. Of those proposals, six received consensus agreement, and eight
of the 17 non-consensus proposals received “overwhelming support” (e.g., at least 11
votes in favor out of the 14 total votes). Id. The proposals ultimately recommended by
EOE on behalf of the CCWG, stakeholder comments, and Authority analysis are
summarized below.
1. Standardized Terminology and Changes to CDF
EOE notes that CCWG members iterated on the terminology to be used in the
CDFs and contractor compliance filings throughout the working group process. CCWG
Final Report, p. 33. While no formal vote was taken, EOE believes that the CCWG
ultimately agreed on appropriate terms to be used. Id. Accordingly, EOE recommends
that the following terminology be used consistently throughout the CDFs and contractor
compliance filings: Average Starting Utility Rate ($/kWh); Utility Escalation Rate (%), PV
Degradation Rate (%), Estimated Year One Net Savings ($), Estimated Multi-Year Net
Savings ($), and Estimated Year One Production (kWh). Id.
The Joint Solar Parties, OCC, and Save the Sound supported the proposed
standardized terminology. Joint Solar Party Comments, May 28, 2026, p. 6; OCC
Comments, May 28, 2026, p. 4; Save the Sound Comments, May 28, 2026, p. 1.
Additionally, EOE recommends that the Authority implement consensus Proposals
16, 21, and 22, and Proposals 17 and 19 (in part), all of which propose changes to certain
line items on the CDFs. CCWG Final Report, pp. 33-34. These five proposals are as
follows:
Proposal 16: Add line item to the CDFs with a Yes/No checkbox for “Are multiyear net savings estimates provided?”
Proposal 21: On the Direct Owner CDF, replace “estimated net average monthly
savings” on the with “Customer Estimated Year One Net Savings.”
Proposal 22: On the Third-Party Owner CDF, replace “Escalator rate used to
estimate net year one savings” with “Utility Escalator Rate used to estimate MultiYear Net Savings.”
Proposal 17 (in part): Add terms and definitions section to the CDFs, and a fillable
text box to detail software calculations and/or calculation methodologies
Proposal 19 (in part): Add a Yes/No checkbox to the Direct Owned and ThirdParty Owned Customer Disclosure Forms (CDFs) for “Is the system being financed
through a financing option provided by the contractor? If yes, contractor confirms
the financing terms have been discussed with customer.” Providing specific
financial terms on the CDF is not required.
Id., pp. 33-37.
The EDCs opposed Proposal 19, citing concerns that the CDFs are long and
should not be made longer. Id., p. 34. No other stakeholder opposed the proposed
Docket No. 26-08-02
Page 14
changes to the CDFs.1 However, Sunrun and Goodleap disagreed with several of specific
changes proposed in the EDCs’ redlined CDFs filed in compliance with Order No. 1 of the
Year 5 Decision; Sunrun and Goodleap’s proposed changes are discussed further in
Section G of this Decision. Sunrun and Goodleap Comments, Aug. 19, 2026, pp. 2-3.
EOE also noted that some of the EDCs’ proposed changes to the CDFs must be altered
to the extent that the Authority does not adopt all changes proposed in the CCWG Final
Report. EOE Comments, Aug. 19, 2026, p. 1.
The Authority agrees that the standardized terminology and related changes to the
CDFs will enhance clarity for RRES participants and contractors. Accordingly, the
Authority approves EOE-recommended Proposals 16, 21, and 22, and the partial
adoption of Proposals 17 and 19.
2. Customer’s Annual Electricity Usage
EOE recommends adoption of Proposal 3, which would standardize the
methodology for calculating a customer’s annual electricity usage for the purpose of
determining the percentage of the customer’s usage the installed solar system is
estimated to offset. CCWG Final Report, p. 9. For customers with 12 months of usage
at the property at which the solar is being installed, it must be actual usage over the prior
12 months based on the customer’s utility bills; for customers with less than 12 months
of usage, contractors may use “any reasonably accurate methodology” and explain in
writing to the customer and in compliance filings; and in either case, the customer’s annua
electricity usage may include allowable additional electrification measures per the RRES
Program Manual for the applicable year. Id.
UI opposed the proposal, citing potential conflicts with the Program Manual, which
establishes standardized methodology for calculating customer's annual usage. CCWG
Final Report, pp. 10, 38; Interrog. Resp. CAE-2. However, EOE denies any conflict as
the two calculations have different purposes; the RRES Program Manual specifies the
calculation of annual usage for the purpose of system sizing, while Proposal 3 is intended
for the estimate of the percentage of annual usage that the system will offset. CCWG
Final Report, p. 10. No other stakeholder opposed EOE’s recommended standardized
approach for calculating the customer’s annual electricity usage.
The Authority is unaware of any conflict between Proposal 3 and the Program
Manual. As noted by EOE above, the requirements in the Program Manual regarding
electricity usage calculation are included for the purpose of system sizing, not for
estimating a customer’s savings. The Authority approves Proposal 3’s methodology for
calculating customers’ annual electricity usage.
1 Tesla initially opposed Proposal 19, but upon further consideration agreed with EOE’s recommendation
include the checkbox but exclude financial terms on the CDFs. CCWG Final Report, p. 29; Interrog.
Resp. CAE-21.
Docket No. 26-08-02
Page 15
3. Utility Escalation Rate
EOE recommends that the Authority standardize the Utility Escalation Rate used
in the CDFs and contractor compliance filings based on the language of Proposal 7, which
was approved by 12 of 14 CCWG members. CCWG Final Report, pp. 38-39. Proposal
7 specifies that the Utility Escalation Rate used in the CDFs and contractor compliance
filings may be no greater than the 20-year historical compound annual growth rate for
Connecticut set by the Authority in the RRES annual review docket, based on EDC
reported data. Id. EOE recommends that the standardized Utility Escalation Rate be
rounded to one decimal point and that the same rate be used for both EDCs. Id.
OCC opposed permitting solar providers to use an escalation rate below the
number established by the Authority in its annual RRES docket. OCC Comments, May
28, 2026, p. 4. In general, OCC raised concerns over proposals that would allow
optionality for contractors, limiting customers’ ability to compare offers on a consistent
basis. Id.
The Authority approves EOE’s recommendation to adopt Proposal 7. Based on
the historical utility rate data provided in this docket, the 20-year historical compound
annual growth rate, rounded to one decimal point, is 2.8%. Eversource Interrog. Resp.
CAE-31; UI Interrog Resp. CAE-31. Accordingly, contractors may utilize a utility
escalation rate no greater than 2.8% for calculating net savings estimates presented to
customers. The Authority acknowledges OCC’s opposition to allowing contractors to
choose different escalation rates, which could limit customers’ ability to compare offers
on a consistent basis. However, the Authority is concerned with the risk of contractors
using higher escalation rates that unrealistically inflate net savings estimates and finds
that allowing contractors the option to use a lower escalation poses a comparatively
minimal consumer protection risk. Given the uncertainty inherent in estimating future
utility rates, the Authority finds it preferable to implement a cap on the assumed escalation
rate but maintain flexibility regarding the specific value used.
Finally, the Authority notes that program design for the successor to the RRES
Program will be considered in Docket No. 26-06-04, Implementation of Clean Energy
Successor Programs, and a methodology for determining and updating compensation
rates has not yet been determined. Although the successor program to RRES may not
involve the use of the Residential Tariff Model, in which escalation rates, starting utility
rates, and other assumptions are updated annually, the Authority may consider the utility
of approving annual updates to the allowed assumptions outside of a rate setting model.
More broadly, EOE recommended that several of the requirements discussed in this
section be carried over to the successor program. The Authority will evaluate and solicit
stakeholder feedback on maintaining or adjusting the existing contractor compliance
requirements for the successor residential program in Docket No. 26-06-04, which will
likely be informed by the implementation of new requirements for the final year of the
RRES Program.
Docket No. 26-08-02
Page 16
4. PV Degradation Rate
EOE recommends that the Authority standardize the PV Degradation Rate by
combining Proposals 4 and 5. CCWG Final Report, pp. 40-41. Under these two
proposals, the Authority would set the standardized PV Degradation Rate based on the
analysis of ISO-NE regarding PV lifetime performance in the most recent NREL Annual
Report, rounded to one decimal point, which is currently 0.5%. Id. Alternatively,
contractors would be allowed to use the degradation rate of the specific panels chosen
by the customer based on the manufacturer’s data sheet. Id.
As with Proposal 7, OCC opposed EOE’s recommendation to allow solar providers
to use panel-specific degradation rates that have not been independently verified against
NREL benchmarks. OCC Comments, May 28, 2026, p. 4.
The Authority approves EOE’s recommendation for the standardized PV
Degradation Rate to be set annually based on the most recent NREL PV Lifetime Project
report cited by ISO-NE in its annual DER Forecast, which is currently 0.5%;2 alternatively,
contractors may use the degradation rate of the specific panels used in a project based
on the manufacturer’s data sheet. The Authority finds that the use of a PV degradation
rate for specific panels substantiated by the manufacturer poses little risk that customers
would be provided with inaccurate information.
5. Estimated Year One Net Savings
EOE recommends adoption of Proposal 9, which would require contractors to use
the following method for estimating Year One Net Savings in the CDF and contractor
compliance filings:3
a. Estimated Year One Net Savings = [Pre-Solar Utility Costs] - [Post-Solar Utility
Costs] + [Solar Cost], where
i. Pre-Solar Utility Costs = [Customer’s Annual Electricity Usage] X [Average
Starting Utility Rate]
ii. Post-Solar Utility Costs = ((Customer’s Annual Electricity Usage –
Estimated Year One Production) X Average Starting Utility Rate) + (Solar
Production Charge X Estimated Year One Production)
iii. Solar Cost =
• For Direct Owned without financing: Cost of the system
• For Direct Owned with financing: Total of payments in Year One
• For Third-Party Owned: Total of payments in Year One
2 The Authority referenced the 2024 NREL Annual Report, available at:
https://docs.nlr.gov/docs/fy24osti/90651.pdf, and the ISO-NE Final 2026 DER Forecast, available at:
https://www.iso-ne.com/static-assets/documents/100033/2026_final_der_forecast.pdf.
3 For clarity, both the Estimated Year One Net Savings and Estimated Multi-Year Net Savings
methodologies apply only to systems enrolling under the Netting tariff, as Buy-All projects do not directly
reduce utility costs and are instead compensated at the approved Buy-All rate for all production. See
Earthlight Exceptions, Oct. 15, 2026, p. 9.
Docket No. 26-08-02
Page 17
Contractors must inform customers that the calculation does not include the value
of RECs, if any, but may provide an additional calculation based on the above
methodology that adds the estimated value of RECs if the customer will receive the value
of RECs. CCWG Final Report, pp. 19-20.
Proposal 9 was supported nearly unanimously by CCWG members. CCWG Final
Report, p. 42. Earthlight opposed the portion of the proposal that stated that the value of
RECs, if any, would not be included in the calculation.
The Authority approves EOE’s recommendation contained in Proposal 9, as it
provides a consistent framework for estimating customers’ Year One Net Savings while
excluding REC benefits that may not be provided directly to customers. Accordingly,
contractors will be required to use the above method for estimating Year 1 Net Savings
for customers enrolling under the Netting tariff.
EOE also recommended that the standardized calculation methodology be carried
over to the RRES successor program. CCWG Final Report, p. 43. Successor program
rules, including the continuation or adjustment of any contractor compliance
requirements, will be established in Docket No. 26-06-04, Implementation of Clean
Energy Successor Programs. The Authority has previously indicated its intent to design
the residential successor programs to accelerate paired solar and storage deployment.
Corresp., Feb. 27, 2026, Docket No. 25-02-14, Renewable Energy Tariff Program
Successor Study, p. 15. Methods for presenting the financial proposition of solar-only
and paired solar and storage installation to customers may require additional
consideration in that proceeding.
6. Estimated Multi-Year Net Savings
EOE does not recommend requiring contractors to provide Estimated Multi-Year
Net Savings, in part because of unresolved questions around how to calculate multi-year
savings for projects that include storage. CCWG Final Report, p. 43. If contractors
choose to provide Estimated Multi-Year Net Savings, EOE recommends the Authority
adopt Proposal 14 as the standardized calculation methodology for the CDF and
contractor compliance filing, which received majority approval from the CCWG and states:
Start with the Estimated Year One Net Savings and over the 20-year tariff term, (i)
increase the utility rate by the defined utility escalation rate; (ii) decrease the
annual production by the defined PV degradation rate; and (iii) If the system is
financed (loan, lease, or PPA), adjust the financing payments by the applicable
financial escalations, including any balloon payments. Id., p. 44.
Additionally, EOE recommends that any net savings calculation should include the
full costs of the customer’s financial products, even if some payments (such as end-ofterm balloon payments) are not due within the 20-year term, as many financing
agreements have a 25-year term. Id. EOE recommends that in addition to the language
above, the Authority require contractors to provide a total calculation (not broken down
by year like the 20-year net savings) that provides the full costs of the customer’s financial
Docket No. 26-08-02
Page 18
product. Id. EOE notes that this addition was not voted on in the CCWG but was raised
by several members.
The Joint Solar Parties oppose this addition, arguing that systems would continue
to provide value after the 20-year tariff term (as Gen. Stat. 16-244z requires the Authority
to establish a tariff for compensating RRES customers after the expiration of the 20-year
term), but EOE’s proposed calculation would incorporate only costs. Joint Solar Party
Comments, May 28, 2026, p. 7. Sunrun and GoodLeap further explain that including only
costs beyond year 30 would “heavily skew the multi-year savings estimate in a way that
is both confusing and misleading for customers,” because both bill savings and solar
costs are expected to increase over the contract term. Sunrun and GoodLeap
Exceptions, Oct. 15, 2026, pp. 3-4.
OCC supported EOE’s suggested approach for calculating but not requiring multiyear net savings estimates. OCC Comments, May 28, 2026, p. 4.
The Authority approves the adoption of Proposal 14 with modification. Customers
should be aware of the full extent of financing costs, even if some costs extend past the
end of the 20-year RRES tariff term. Therefore, estimates of multi-year net savings shall
be required to include the full cost of the customer’s financial products. Nevertheless, the
Authority recognizes that incorporating only costs and excluding projected bill savings
after the 20-year term could result in misleading savings estimates. General Statute 16244z(c)(1)(E) requires the Authority to establish a tariff for the purchase of energy on a
cents-per-kWh basis from existing RRES systems after the expiration of the tariff term,
but a specific tariff has not yet been established, making the full customer value uncertain.
Netting systems that continue to operate after the 20-year RRES term would, at a
minimum, provide utility bill savings by reducing the customer’s billed usage by the
amount of solar generation directly consumed onsite.4 Contractors may include this value
(i.e., the amount of solar generation consumed behind the meter, multiplied by the
assumed utility rate in effect) in the multi-year net savings estimates provided to
customers, and shall provide an explanation in the CDF and their annual contractor
compliance filings describing how the estimate was derived and the components
included.
7. Starting Average Utility Rate
EOE reports that standardization of the starting utility rate used to calculate
estimated Year One and Multi-Year Net Savings was the most challenging topic
discussed in the CCWG, with no consensus reached. CCWG Final Report, p. 45. Several
methodologies could be used to standardize the Average Starting Utility Rate, each with
benefits and drawbacks. Id. In general, the starting utility rate selection can either
prioritize consistency across customers or accuracy in reflecting an individual customer’s
actual utility costs, but not both. Id., p. 46.
4 Based on hourly load and generation profiles, for a typical residential customer, Eversource previously
estimated that about 40% of generation annually would be directly consumed onsite. See Eversource
Comments, Aug. 5, 2025, Docket No. 25-02-14, Renewable Energy Tariff Program Successor Study, p.
2.
Docket No. 26-08-02
Page 19
The main methodologies discussed by the CCWG, both based on historical data,
were (1) calculation of an average rate across all customers (or a subset of customers),
and (2) a customer-specific calculation based on each customer’s average rates. Id., p.
45. An average historical rate offers consistency across customers and reduces the risk
of errors but may not reflect a customer’s actual electricity costs (particularly for
customers on third-party supply rates) or capture variability in rates. Id. EOE also noted
that the choice of starting utility rate must consider whether to calculate an all-in rate or
break out rate components; for example, applying the standard service rate for customers
who utilize a third-party supplier. Id., pp. 45-46.
As the CCWG did not reach consensus, EOE proposes that the Authority authorize
several methodologies for the Starting Average Utility Rate and mandate that contractors
transparently describe the approach used in writing to customers and in their contractor
compliance filings. CCWG Final Report, p. 47. EOE suggests allowing the following
methodologies:
1. Standardized rates set by the Authority in the RRES Program annual
review docket: per-EDC rate forecast used in the Residential Tariff
Model for the following calendar year.
2. Customer-specific 12-month historical average: based on the all-in utility
rate over the past 12 months of usage, using the customer’s actual utility
bills. If the customer uses a third-party supplier, contractors must
explain how that rate will affect net savings calculations.
3. Software calculation methodology: any reasonably accurate
methodology used by software designed to calculate an average starting
utility rate for the customer based on their location and usage history.
CCWG Final Report, p. 47.
To ensure transparency, EOE recommends that (a) if a contractor uses the
standardized rate described in option 1 above, no explanation other than the source of
the rate is required; and (b) if a contractor uses a customer-specific historical average
rate or a software methodology, as described in options 2 and 3 above, they must explain
in writing to the customer and in their compliance filings the methodology used, including
detailing all parameters of the methodology and any parameters that are not included in
the methodology. CCWG Final Report, pp. 47-48. The parameters that must be
explained include distribution rate, transmission rate, supply rate, non-bypassable
charges, discounts (including LIDR), sources of the information, and whether the
customer’s rate is different than the current standard service rate. Id.; Interrog. Resp.
CAE-13.
The EDCs argue that the starting utility rate should be required to be based on
historical rates rather than third-party supplier rates, which can exceed standard service
rates and can be variable. Eversource Comments, May 28, 2026, p. 3; UI Comments,
May 28, 2026, p. 3. Additionally, the ECCs recommend careful consideration of allowable
Docket No. 26-08-02
Page 20
methods for calculating the starting utility rate for customers enrolled in a LIDR;
Eversource states that customers on a LIDR should not be provided with a savings
estimate based on non-LIDR utility rates. Id.
OCC opposes allowing solar providers to calculate savings based on a customer’s
specific rate over the prior 12 months, asserting that a customer could achieve a
significant portion of those calculating savings by returning to standard service or
contracting with a lower-cost supplier. OCC Comments, May 28, 2026, pp. 4-5. OCC
asserts that solar savings should be measured against a realistic and consistent baseline
rate. Id.
The Joint Solar Parties emphasized that no method for determining a starting utility
rate is perfect, and multiple defensible approaches each have benefits and drawbacks.
Joint Solar Parties Comments, May 28, 2026, pp. 7-8. The Joint Solar parties state that
a rigid methodology that cannot account for variability in utility rates will inevitably be
“wrong” at some point during the year, creating risks for participants and contractors. Id.
Regarding the prop