Connecticut Green Bank
Docket No. 26-08-02
Response to Interrogatory CAE-31
Date of Submission: August 17th, 2026
Witness: Connecticut Green Bank - Sergio Carrillo
Question:
CGB Comments, May 28, 2026, p. 5. For each potential solution listed for DC-coupled
solar and storage, provide an estimate of the cost to participants.
Response:
The Connecticut Green Bank (“Green Bank”) understands that this request is looking for
an estimate of participant costs associated with the potential solutions identified for
obtaining separate data for DC-coupled solar and storage systems. Based on that
understanding, Green Bank does not anticipate that participants would incur
incremental costs for these potential solutions where the applicable monitoring
equipment and data platform are already installed and operating. In those
circumstances, the participant cost is expected to be $0.00, unless there is a
subscription fee, which depends on the data monitoring provider.
The information needed to distinguish solar production from storage system activity may
already be captured through the participant’s existing solar and storage monitoring
platform, or through the platform used by the relevant third-party owner, installer, or
original equipment manufacturer (OEMs). If the data monitoring system is not installed,
the estimated cost to the participant may be in the $400-$1,000 range depending on the
system and the installation labor but could vary across providers and installers. If the
data monitoring is already installed, the cost would not be to the participant but rather
the cost that may need to be considered would potentially be between the data provider
and United Illuminating (“UI”).
For example, certain monitoring providers may be able to separately identify solar
production data and storage system activity, and this information is typically accessible
to the participant. The question UI may consider is how to obtain that information at an
agreed-upon cadence and in a mutual data sharing format. To the extent UI determines
that this data is necessary and does not agree with Eversource’s determination1 on the
minimal impact of parasitic load and round-trip efficiency losses to the participant, or
has concerns regarding direct consumption of system output for purposes other than
parasitic load, then UI may consider coordinating directly with the applicable monitoring
providers for data to compare to the UI production meter data. UI may consider
discussing with Tesla, SolarEdge, or any other relevant providers, in order to confirm the
1
https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/7716e1476a34f23585258e050
04ea5c3/$FILE/26-08-02%20ES%20Written%20Comments%205.28.26.pdf
Page 2 of 2
Connecticut Green Bank
Docket No. 26-08-02
Response to Interrogatory CAE-31
Date of Submission: August 17th, 2026
Witness: Connecticut Green Bank - Sergio Carrillo
availability of the necessary data fields, establish the frequency and format for data
transfers, and determine whether any additional data or processing may be needed.
Another potential consideration may be to work with the Energy Storage Solutions
(“ESS”) Distributed Energy Resource Management System (“DERMS”) provider to
access this data. In ESS, the Green Bank has noted there is a field for solar data across
most of the residential BESS OEMs along with battery energy storage system data. UI
may want to discuss with the DERMS provider ways to streamline access to this data
which would support the growth of DC coupled solar and storage systems in both RRES
and ESS Programs in UI territory. This data would likely only be available for customers
in Energy Storage Solutions, and the Green Bank is unsure of which particular 160
customers that UI referenced2 and if they overlap with any Energy Storage Solutions
customers.
The Green Bank does not anticipate a direct participant cost for either a monitoringplatform data-access approach unless noted above or a DERMS-based aggregation
approach, provided the necessary equipment and monitoring platform are already in
place. Any additional costs associated with implementing such a solution would likely be
incurred by UI rather than by the participant.
2