CAE-027
The United Illuminating Company
Docket No. 26-08-02
Witness: Erik Robie
Alexandra Torrealba
Page 1 of 1
Date Submitted: August 17, 2026
CAE-027 Q:
Reference UI Interrog. Resp. CAE-8; Eversource Interrog. Resp. CAE-8. Explain why UI was
unable to estimate the cost or timeline for PowerClerk changes (specifically, updating the customer
disclosure form and adding three new fields) without engaging a third-party PowerClerk system
vendor. Eversource states that the changes can be implemented in 1-2 months and at no additional
cost, as the changes fall within the scope of PowerClerk maintenance. Discuss whether UI has an
existing contract for PowerClerk maintenance and provide an estimate of the cost and timeline to
implement the changes discussed in Eversource’s response to Interrog. CAE-8.
CAE-027 A:
The Company’s response to CAE-008 in this docket was based on the understanding that the
requested PowerClerk changes could require modifications to the PowerClerk system that may
affect existing workflows, dependencies, validations, reporting logic, or other system
functionality. Because changes of that nature can vary in scope and complexity, the Company
indicated that consultation with the PowerClerk system vendor would be necessary to determine
the associated cost and implementation timeline.
To the extent the fields proposed to be added in PowerClerk consist solely of static data fields and
do not create interdependencies, affect automated processes, or otherwise impact existing
PowerClerk workflows, the Company expects that such fields can be added at no incremental cost,
similar to Eversource’s response, because they would fall within the current scope of PowerClerk
maintenance.
Accordingly, if the requested changes are limited to static field additions that do not require
workflow modifications or other system changes, the Company currently anticipates that such
changes can be implemented without additional vendor cost under the existing PowerClerk
maintenance arrangement. If further review determines that the requested changes require
modifications to workflows or related system functionality, the Company would need to coordinate
with the maintenance vendor to evaluate and confirm the required scope, cost, and schedule.
Additionally, if the requested changes extend beyond the addition of static fields, the Company
reiterates its response to Interrogatory CAE-008 in the above-referenced docket that it cannot
reasonably estimate the associated implementation costs or timeline without engaging its thirdparty PowerClerk system vendor. Any such estimate would necessarily depend upon the final
requirements and technical specifications directed by the Authority and a corresponding
assessment by the vendor.