Interrogatory responses
Answers to questions 14 thru 20
Files1
PURA 28-08-02 Sunrun Response to Interrogatories CAE-14-20.pdf
PDF · 98 KB · 7 pagesText searchable
Download PURA 28-08-02 Sunrun Response to Interrogatories CAE-14-20.pdfRead the text of PURA 28-08-02 Sunrun Response to Interrogatories CAE-14-20.pdf
Sunrun, Inc.
Docket No. 26-08-02
Witness: Kyle Wallace
May 28, 2026
CAE-14 CCWG Report, p. 7. In what cases would residential solar contractors not provide
multi-year net saving estimates to customers?
Response:
A residential solar contractor may not provide a multi-year net savings estimate to potential
customers due to the inherent uncertainty regarding future utility costs, and therefore may only
provide a first year net savings estimate as required on the disclosure form and in proposal
materials. One primary reason for doing so is when energy storage is included because the value
proposition is fundamentally different and more complicated and may not include an expectation
of near-term net savings. That value proposition for solar plus storage systems includes back-up
power (which is not reflected in utility bill savings), compensation from the Energy Storage
Solutions Program, a hedge against future energy costs and cost certainty, and potentially utility
bill savings over the term of the solar contract.
Sunrun, Inc.
Docket No. 26-08-02
Witness: Kyle Wallace
May 28, 2026
CAE-15 CCWG Report, pp. 14, 24. In what cases would contractors provide customers
with multi-year savings estimates for terms less than 20 years?
Response:
Please refer to Sunrun’s answer to CAE-14.
Sunrun, Inc.
Docket No. 26-08-02
Witness: Kyle Wallace
May 28, 2026
CAE-16 For RRES projects paired with storage, do contractors include the value of ESS
incentives in the net savings estimates provided to customers?
Response:
Potentially. Energy Storage Solutions Program compensation that flows to the customer as a
reduction in the upfront cost for a customer-owned system or a lower monthly solar plus storage
payment for a third-party owned system would be reflected in the net savings estimate provided
on the customer disclosure form. ESS compensation that is provided to the customer in other
forms, such as a separate upfront payment for grid-edge customers or ongoing annual
performance payments, may not be included in the RRES net savings estimate provided on the
customer disclosure form. Whether and how ESS compensation is shown will be dependent on
the compensation structure that is agreed to between the customer and the installer, OEM, and/or
third-party owner.
Sunrun, Inc.
Docket No. 26-08-02
Witness: Kyle Wallace
May 28, 2026
CAE-17 CCWG Report, p. 31. Discuss the prevalence of customers opting to cancel
contracts within the three-day rescission period. Provide the percentage of contracts that
are rescinded within the three-day period, if available.
Response:
Sunrun is not able to provide specific data on the percentage of contracts that are cancelled
within the three-day period. Sunrun allows customers the ability to cancel their contract up until
installation work has commenced at the home. This is often weeks or months after the initial
contract is signed.
Sunrun, Inc.
Docket No. 26-08-02
Witness: Kyle Wallace
May 28, 2026
CAE-18 CCWG Report, p. 46. Discuss the method(s) contractors currently use to
determine the starting utility rate. If software platforms are used, do they account for
customer-specific rates such as low-income discount rates or third-party supply rates?
Response:
As explained in Sunrun’s Annual Compliance Filing in Docket 25-08-02RE01 and prior
contractor compliance dockets, Sunrun uses Genability by Arcadia for determining the starting
utility rate. This platform maintains a database of available tariffs and can provide utility rates,
“avoided cost of power” figures based on unique solar tariffs such as RRES, and estimated
savings based on the combination of input usage data, utility tariff details, and solar production
estimates. This platform’s model can include low-income discount rates, but it does not include
third-party supply rates given the extreme variability, unless manually provided by the user. Due
to the customer’s ability to change suppliers at any time and that third-party supply contracts are
for a limited period of time, Sunrun assumes default supply rates in utility rate calculations.
Sunrun, Inc.
Docket No. 26-08-02
Witness: Kyle Wallace
May 28, 2026
CAE-19 CCWG Report, pp. 31, 48. Clarify whether EOE’s recommendation of presenting
completed customer disclosure forms “immediately prior to and contemporaneously with
the solar contract” would require that the customer disclosure form be generated outside
PowerClerk and uploaded to PowerClerk after signing. If so, comment on the likelihood of
introducing transcription errors when the information from the customer disclosure form
is entered into PowerClerk.
Response:
Yes, providing the customer disclosure form prior to or at the same time as the solar contract
would require the customer disclosure form being generated outside of PowerClerk. There is no
information included in the disclosure form that would require it to be generated inside of
PowerClerk.
Today, Sunrun completes the information on the customer disclosure form based on the
associated solar contract and system design documents, and it is provided to the customer at the
same time as the solar contract so that the customer can compare the information in both
documents, which is the purpose of a disclosure form. Customers may sign the day they receive
the documents or they may take additional time to consider their options.
The internal team that applies for interconnection through PowerClerk is not the same team
interacting with customers during a sale. Having more employees engaging with PowerClerk,
creating applications, and generating disclosure forms would substantially increase the risk of
incorrect information and RRES or interconnection application complications. As stated above,
there is no information provided by PowerClerk that is necessary to complete a customer
disclosure form.
Because the customer disclosure form is completed and signed by the customer at the time the
contract is signed, Sunrun does not understand why such information would still need to be input
into PowerClerk, and potentially a second disclosure form signed, as part of the interconnection
application. If a disclosure form is needed to be provided in PowerClerk, uploading the
already-signed copy of the disclosure form would seem to be sufficient. If there was a
requirement to input that same information manually into the interconnection application, this
would further increase the risk of mistakes.
Sunrun, Inc.
Docket No. 26-08-02
Witness: Kyle Wallace
May 28, 2026
CAE-20 In other states in which solar contractors operate that have similar customer
disclosure requirements, at what point in the sales and contracting process are contractors
required to provide completed customer disclosure forms to customers?
Response:
Typically disclosure forms are required to be provided to customers either at the same time or
prior to receiving the associated solar contract. A disclosure form’s primary purpose is to provide
customers with a concise overview of material terms of the solar contract so that they can make
an informed decision. States such as Rhode Island, New York, and Illinois require the form to be
provided with the customer agreement or earlier. Other states with solar programs that require a
disclosure form, such as Massachusetts or New Jersey, do not explicitly specify when the
customer disclosure form must be provided, but it is required prior to being able to apply to the
applicable program and therefore is typically included with the solar contract and any material
amendments.
As listed on the current system
Question(s) Answered 14 thru 20 (Sunrun Inc) Date Filed: 05/28/2026