Interrogatory responses
Answers to questions 14 thru 20
Files1
Interrogatories Response_05.28.26.pdf
PDF · 108 KB · 10 pagesText searchable
Download Interrogatories Response_05.28.26.pdfRead the text of Interrogatories Response_05.28.26.pdf
May 28, 2026
Via Electronic Filing and Service
Jeffrey R. Gaudiosi
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, Connecticut 06051
RE:
Docket No. 26-08-02 Tesla Written Responses to Interrogatories CAE 14-21
Mr. Gaudiosi,
Tesla respectfully submits the attached responses to the interrogatories issued by the
Public Utilities Regulatory Authority on May 11, 2026, in the above referenced proceeding.
Please contact me with any questions regarding this filing.
Respectfully submitted,
/s/ Dominic Gatti
Dominic Gatti
Energy Policy Advisor
Tesla, Inc.
Phone: [phone removed]
Email: [email removed]
1 of 10
Docket No. 26-08-02
CAE-14
Dominic Gatti
Tesla, Inc.
May 28, 2026
CCWG Report, p. 7. In what cases would residential solar contractors not provide
multi-year net saving estimates to customers?
Residential solar contractors may choose not to provide multi-year net savings estimates
for financed or third-party owned (TPO) systems. Multi-year savings estimates are
inherently uncertain due to evolving factors such as future utility rate changes and system
performance over time. For financed and TPO systems, system costs can be directly
compared to utility bill savings over a 1-year period, providing a reliable and transparent
assessment without the need for long-term projections.
For cash-purchased (direct-owned) systems, multi-year savings estimates are needed to
communicate economic value, enabling customers to compare the total upfront cost
against cumulative energy savings over the system’s lifetime. Although these projections
involve greater uncertainty, they are necessary to illustrate the long-term financial benefits
of ownership.
2 of 10
Docket No. 26-08-02
CAE-15
Dominic Gatti
Tesla, Inc.
May 28, 2026
CCWG Report, pp. 14, 24. In what cases would contractors provide customers with
multi-year savings estimates for terms less than 20 years?
Contractors may provide multi-year savings estimates for less than 20 years when the
system’s financial contract is less than 20 years. For example, in financed systems, the
savings estimate may match the loan term (10 or 15 years) providing a relevant comparison
between payments and savings over the period of financial obligation.
Similarly, for third-party owned systems that include only energy storage (e.g., a storageonly lease or PPA), the agreement term may be shorter than 20 years, and contractors may
provide savings estimates that reflect this duration.
3 of 10
Docket No. 26-08-02
CAE-16
Dominic Gatti
Tesla, Inc.
May 28, 2026
For RRES projects paired with storage, do contractors include the value of ESS
incentives in the net savings estimates provided to customers?
Tesla provides customers with information about enrollment and performance incentives
through the Connecticut Energy Storage Solutions (ESS) program, including an overview of
the potential incentive value based on participation and system performance. However,
these incentives are not guaranteed. Compensation is contingent upon meeting specific
eligibility criteria, successful enrollment, and sustained system performance over time.
While Tesla communicates the potential benefits, we do not promise or guarantee that
customers will receive these incentives or that the estimated values will be realized in
actual savings.
4 of 10
Docket No. 26-08-02
CAE-17
Dominic Gatti
Tesla, Inc.
May 28, 2026
CCWG Report, p. 31. Discuss the prevalence of customers opting to cancel contracts
within the three-day rescission period. Provide the percentage of contracts that are
rescinded within the three-day period, if available.
The percentage of customers who cancel contracts within the three-day recission period
after signing is 2.9% for Initial Contract accepted and 0.7% for Final Contract signed.
The initial contract is presented to the customer after the customer places a deposit,
submits their utility bill, and has an initial layout completed.
The final contract is signed after the site survey has been completed, and the system
layout is finalized. At this stage, all system design information is final.
5 of 10
Docket No. 26-08-02
CAE-18
Dominic Gatti
Tesla, Inc.
May 28, 2026
CCWG Report, p. 46. Discuss the method(s) contractors currently use to determine
the starting utility rate. If software platforms are used, do they account for customerspecific rates such as low-income discount rates or third-party supply rates?
Currently, the utility rate used in savings estimates is sourced from the U.S. Energy
Information Administration (EIA) Form 861M, based on the average residential electricity
price across Connecticut over the prior 12 months. This does not reflect utility-specific
rates, third-party supply rates, or low-income rates.
We are transitioning to a different methodology that uses utility-specific residential rates
as the starting point. Specifically, we will incorporate Eversource and United Illuminating’s
(UI) current residential electricity supply and delivery rates. We are not planning to add low
income or third-party supply rates at this time.
6 of 10
Docket No. 26-08-02
CAE-19
Dominic Gatti
Tesla, Inc.
May 28, 2026
CCWG Report, pp. 31, 48. Clarify whether EOE’s recommendation of presenting
completed customer disclosure forms “immediately prior to and contemporaneously
with the solar contract” would require that the customer disclosure form be
generated outside PowerClerk and uploaded to PowerClerk after signing. If so,
comment on the likelihood of introducing transcription errors when the information
from the customer disclosure form is entered into PowerClerk.
Yes, this would require the Customer Disclosure Form to be generated outside
PowerClerk.
When working with different teams to complete the Customer Disclosure Form manually
and input the information into PowerClerk at a separate time, there is an increased risk of
human error.
7 of 10
Docket No. 26-08-02
CAE-20
Dominic Gatti
Tesla, Inc.
May 28, 2026
In other states in which solar contractors operate that have similar customer
disclosure requirements, at what point in the sales and contracting process are
contractors required to provide completed customer disclosure forms to customers?
RI:
Rhode Island Energy Customer Disclosure Form – document is generated after the final
contract is signed and is submitted with the interconnection application.
CA:
•
•
California Solar Consumer Protection Guide is signed after the customer places
their order and before the customer signs any contract. This document does not
have any financial or system design information.
CSLB Solar Energy System Supporting Information Document (SESSI) is signed after
the customer signs the final contract. This document outlines the contract terms
and system design information.
IL:
Illinois Shines – Disclosure Form needs to be executed by customer prior to the execution
of customer contract and commencement of the Part I incentive application. A new
disclosure form is required to be generated for any changes once the final contract is
signed. The Disclosure Form must be generated using the portal on the Program website.
The portal contains an interactive form that can be completed and either e-signed using
the portal e-signature functionality or printed, signed, scanned, and uploaded. The
information on the Disclosure Form is automatically transferred to the application portal to
start the Part I application.
8 of 10
Docket No. 26-08-02
CAE-21
Dominic Gatti
Tesla, Inc.
May 28, 2026
CCWG Report, p. 29. Provide more precise language for Proposal 19 that would allow
Tesla to support the proposal.
Upon further consideration, Tesla agrees with EOE’s conclusion that it is appropriate to
include the checkbox, but financial terms should not be included on Consumer Disclosure
Forms (CDF). The terms of financing agreements are controlled by the financing
documents and are already heavily regulated under Conn. Gen. Stat. §§ 20, 36a, 40, and
37, as applicable. Transcribing any subset of that information from the financing
documents to the CDF is likely to cause more confusion than clarity.
9 of 10
CERTIFICATION
This is to certify that on this day, the foregoing document was filed with the Public Utilities
Regulatory Authority, and copies of the foregoing document were served upon each person
designated on the Authority’s official service list in the above referenced proceeding.
/s/ Dominic Gatti
Dominic Gatti
Tesla, Inc.
Phone: [phone removed]
Email: [email removed]
May 28, 2026
10 of 10
As listed on the current system
Question(s) Answered 14 thru 20 (Tesla) Date Filed: 05/28/2026