Docket No. 26-08-02 – Annual Residential Renewable Energy Solutions Program
Review and Rate Setting – Year 6
SAVKAT INC , Ben Burnett 5/28/26
Interrogatories CAE-14 through CAE-20 are directed individually to Earthlight
Technologies, GoodLeap, Ion Solar, Ion Solar Pros, SAVKAT, SunRun, Tesla, and Trinity
Solar.
CAE-14 CCWG Report, p. 7. In what cases would residential solar contractors not provide multi year net saving estimates to customers?
We cannot think of a case where we would not provide the multi-year net saving estimates to
customers.
Page 2 of 7
Docket No. 26-08-02 – Annual Residential Renewable Energy Solutions Program
Review and Rate Setting – Year 6
SAVKAT INC , Ben Burnett 5/28/26
CAE-15 CCWG Report, pp. 14, 24. In what cases would contractors provide customers with
multi-year savings estimates for terms less than 20 years?
We would always provide 20 year estimates or 25 year estimates to align with the netting
program, the term of TPO agreement and/or product warranties. We would generally only
provide savings for a period of less than 20 years if the customer requested it because they are
planning to move in less than 20 years.
Page 3 of 7
Docket No. 26-08-02 – Annual Residential Renewable Energy Solutions Program
Review and Rate Setting – Year 6
SAVKAT INC , Ben Burnett 5/28/26
CAE-16 For RRES projects paired with storage, do contractors include the value of ESS
incentives in the net savings estimates provided to customers?
Yes.
Page 4 of 7
Docket No. 26-08-02 – Annual Residential Renewable Energy Solutions Program
Review and Rate Setting – Year 6
SAVKAT INC , Ben Burnett 5/28/26
CAE-17 CCWG Report, p. 31. Discuss the prevalence of customers opting to cancel contracts
within the three-day rescission period. Provide the percentage of contracts that are rescinded
within the three-day period, if available.
10% of cancellations occur within the 3-day recission period
Page 5 of 7
Docket No. 26-08-02 – Annual Residential Renewable Energy Solutions Program
Review and Rate Setting – Year 6
SAVKAT INC , Ben Burnett 5/28/26
CAE-18 CCWG Report, p. 46. Discuss the method(s) contractors currently use to determine the
starting utility rate. If software platforms are used, do they account for customer-specific rates
such as low-income discount rates or third-party supply rates?
We use software platforms such as Aurora Solar and Enerflo, which link to the Genability
database for published utility rates. We are able to select the customer specific rate code when
building the proposal, such as low-income discounts, but third party supply rates are not ablet to
be selected.
Page 6 of 7
Docket No. 26-08-02 – Annual Residential Renewable Energy Solutions Program
Review and Rate Setting – Year 6
SAVKAT INC , Ben Burnett 5/28/26
CAE-19 CCWG Report, pp. 31, 48. Clarify whether EOE’s recommendation of presenting
completed customer disclosure forms “immediately prior to and contemporaneously with the
solar contract” would require that the customer disclosure form be generated outside
PowerClerk and uploaded to PowerClerk after signing. If so, comment on the likelihood of
introducing transcription errors when the information from the customer disclosure form is
entered into PowerClerk.
As long as the necessary information is able to be pulled in from our Aurora design and/or
Enerflo, there should be little chance of errors. One issue with signing at time of contract is the
chance of changes in system size, etc being made after Site Survey and then needing to get it
resigned again.
Page 7 of 7
Docket No. 26-08-02 – Annual Residential Renewable Energy Solutions Program
Review and Rate Setting – Year 6
SAVKAT INC , Ben Burnett 5/28/26
CAE-20 In other states in which solar contractors operate that have similar customer disclosure
requirements, at what point in the sales and contracting process are contractors required to
provide completed customer disclosure forms to customers?
We have seen a combination of including the documents along with TPO agreements or
sending separate forms out for customer signature after design is finalized and ready for permit
and interconnection applications.
As listed on the current system
Question(s) Answered 14, 15, 16, 17, 18, 19, 20 (SAVKAT INC) Date Filed: 05/28/2026