Written Comments
Filed by Save The Sound
- Type of filing
- Comments (Written Comments)
- Date filed
- September 14, 2026
- Filed by
- Save The Sound
- Files
- 1
As listed on the current system
Written Comments - 09/14/2026 [26-08-04] (Save The Sound)
Files1
Save the Sound - Written Comments - SCEF Year 8 Program Review 9.14.26.pdf
PDF · 684 KB · 6 pagesText searchable
Download Save the Sound - Written Comments - SCEF Year 8 Program Review 9.14.26.pdfRead the text of Save the Sound - Written Comments - SCEF Year 8 Program Review 9.14.26.pdf
ANNUAL SHARED CLEAN ENERGY
:
FACILITY PROGRAM REVIEW – YEAR 8
DOCKET NO. 26-08-04
SEPTEMBER 14, 2026
WRITTEN COMMENTS
Save the Sound respectfully submits the following written comments as part of the annual review of the Shared
Clean Energy Facility (SCEF) program – Year 8 in response to the Notice of Request for Written Comments issued by the
Public Utilities Regulatory Authority (the Authority) on August 25, 2026.
The Authority has requested that docket Participants and interested stakeholders provide written comments on a
number of topics, including the following:
1. Procurement Price Caps
In the prior annual review, the Authority adopted a procurement price cap of $182.94/MWh for the SCEF
Program, consistent with the 2026 large Non-Residential Renewable Energy Solutions (NRES) zero-emission buyall price cap, to minimize potential intra-program competition between the NRES and SCEF Programs. Year 7
Decision, pp. 10-11.
For Program Year 8, the Authority seeks stakeholder input regarding the appropriate procurement price cap for
the SCEF Program. Any proposed modification to the current price cap must be supported by a clear rationale
and substantial evidence. At a minimum, comments should address:
• Potential ratepayer impacts; and
• The effect of the proposed price cap on developer participation and overall project viability.
Stakeholders are encouraged to support their recommendations with relevant Program trends, project
development data, market analyses, or other pertinent information.
As conveyed in our earlier comments to the Department of Energy and Environmental Protection (DEEP), Save
the Sound supports DEEP’s recommended Price Cap of $182.93/MWh for Year 8 of the SCEF program. 1
This recommended cap level complies with the legislative guidance provided in section 16-244z(a)(5), which
states that “the maximum selected purchase price of energy and renewable energy certificates on a cents-per-kilowatt-hour
1
Save the Sound, Comments on SCEF Year 8 Recommendations (July 24, 2026),
https://www.dpuc.state.ct.us/DEEPEnergy.nsf/c6c6d525f7cdd1168525797d0047c5bf/05790d7d08dce01c85258e410044b83e/$FILE/S
ave%20the%20Sound%20-%20Comments%20on%20SCEF%20Year%208%20Recommendations%207.24.26.pdf.
125 Church Street, 2nd Floor | New Haven, CT 06510 | [phone removed]
1385 Boston Post Road, 2 nd Floor | Larchmont, NY 10538 | [phone removed]
savethesound.org
basis in any given solicitation shall not exceed such maximum selected purchase price for the same resources in the prior
year's solicitation, unless the authority makes a determination that there are changed circumstances in any given year.”
$182.93 is in fact the highest bid amount received in the Year 7 solicitation, and there was relatively robust
participation in that solicitation. Each EDC received bids for capacity in excess of their annual program allocation. UI
received bids for 10.49 MWs of project capacity, while Eversource received bids for 77.251 MWs of capacity. 2
Are there any current “changed circumstances” that suggest a higher Program Price Cap is necessary?
While we have previously expressed our concern regarding the impact that the early sunsetting of the federal tax
credit could have on the SCEF program, we are cognizant that in setting the Year 7 price cap, the Authority took into
account the impact of the elimination of the federal tax credits by increasing the price cap from $133/MW to
182.94/MW.3 This increase appears to have had the desired effect, at least for the time being.
However, we defer to project developers as to whether they are facing any additional challenges this year versus
last year that would create upward pressure on projects and warrant a higher price cap. We note, for example, that the
federal administration continues to implement policies that create additional barriers to the deployment of renewable
energy in the United States.
For instance, the Solar Energy Industry Association has identified that ongoing federal trade actions continue to
create constraints on the domestic solar industry. Currently, the United States lacks sufficient cell manufacturing capacity
to meet expected demand. Meanwhile, this past Spring the Commerce Department announced new tariffs on solar cells
and modules on countries supplying nearly 80% of US cell imports.4 Additionally, on July 1, 2025, the Commerce
Department initiated a Section 232 investigation to determine the effects on the national security of imports of polysilicon
and its derivatives.5 “Given the broad applicability of the action, it could severely constrain manufacturing activity for
some domestic producers.”6
2
We note that some of these bids were disqualified. See Docket No. 25-08-04, United Illuminating, Motion No. 7, Motion for Review
and Approval of Orders 9 &10,Attachment B (June 18, 2026),
https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/88441fa8adf97bfe85258e1a006d89a5?OpenDocume
nt; Docket No. 25-08-04, Connecticut Light & Power Company d/b/a Eversource Energy, Motion No. 6, Motion for Approval of
Orders 9 10, Attachment B (May, 15, 2026),
https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/948f39513f06712f85258df8005c984b?OpenDocum
ent.
3
Public Utilities Regulatory Authority, Docket No, 25-08-04, Annual Shared Clean Energy Facility Program Review – Year 7, Final
Decision at 8-11 (Dec. 17, 2025)
4
Solar Energy Industries Association, Solar Market Insight Report Q2 2026 (June 10, 2026) (“Currently, the US only has 3 GW of
cell capacity. While several new cell factories are in development, these are not expected to be enough to supply all domestic module
factories. In the spring, the Department of Commerce announced high preliminary countervailing (CVD) and anti-dumping (AD) tariff
rates for solar cells and modules from India, Indonesia, and Laos. These nations, together with Malaysia, Thailand, and Vietnam
(which are already subject to tariffs) were the source of 78% of cell imports last year.”); https://seia.org/research-resources/solarmarket-insight-report-q2-2026/.
5
Notice of Request for Public Comments on Section 232 National Security Investigation of Imports of Polysilicon and its Derivatives,
90 Fed Reg, 31955 (July 16, 2026), https://www.govinfo.gov/content/pkg/FR-2025-07-16/pdf/2025-13345.pdf.
6
SEIA, supra note 4.
2
Finally, in August of this year, the administration imposed a 15% tariff with minimum import prices on a number
of solar PV components, including polysilicon, ingots, wafers, cells, and modules.7 These new tariff rates will be effective
on December 4, 2026.8
While we are not in a position to predict the exact impact that these trade moves will have on the development
costs for program participants, we highlight them for the awareness of all the parties and believe that it should be an area
of inquiry in ensuring that the adopted the price cap allows for a successful Year 8 project solicitation.
2. Budget Reallocation
For the Year 7 procurement, the Authority adopted separate budget caps for each EDC, pursuant to General
Statutes §§ 16-244z(c)(1)(A) and 16-244z(c)(1)(B). Year 7 Decision, pp. 8-9. Specifically, the approved 2026 SCEF
budget caps were $9,864,750.81 for Eversource and $5,709,894.63 for UI. Id., p. 10.
However, these allocations do not reflect the typical 80/20 allocation between the EDCs based on their respective
shares of statewide electric revenues. Rather, the approved values reflected the projected payment obligations
associated with projects selected during the Year 5 procurement. Unlike Eversource, UI selected a fuel cell project
during the Year 5 procurement. Id., p. 9, fn. 5. Because fuel cell projects generally operate at higher capacity
factors than conventional solar projects, UI’s resulting SCEF budget allocation exceeded the amount that would
have resulted under the standard 80/20 revenue-based allocation methodology. Id. Importantly, following
enactment of Public Act 25-173, An Act Concerning Energy Affordability, Access and Accountability, fuel cells are
no longer eligible for participation in the SCEF Program.
Accordingly, the Authority is concerned that UI’s allocated budget may remain underutilized during the final year
of the SCEF Program, particularly given UI’s comparatively urban service territory, the more limited availability
of developable land for SCEF projects, and the fact that UI’s elevated budget allocation was attributable to the
selection of a fuel cell project rather than a greater volume of awarded projects during the Year 5 procurement.
Therefore, the Authority requests stakeholder comment on whether the combined SCEF budget of $15,574,645.44
should be reallocated between the EDCs using the standard 80/20 revenue-based allocation methodology. Under
such an approach, the resulting allocations would be $12,459,716.35 for Eversource and $3,114,929.09 for UI.
The Authority will not consider proposals for adjusting the overall SCEF budget cap.
Save the Sound supports maintaining the current budget allocation, and not adjusting the allocation to reflect the
typical 80/20 split between the EDCs. We believe that continuing a higher proportional budget allocation for the UI
service territory may be warranted, notwithstanding the elimination of fuel cell projects from SCEF eligibility. Our
position is based on the historical data demonstrating that project bids in UI territory are consistently higher on a $/MWh
basis than project bids in Eversource territory. Accordingly, UI’s proportional budget commitments for projects will be
greater than its 20% proportional capacity allocation. If the Authority wishes to retain an 80/20 split in program capacity
allocation in the respective EDC territories, a proportionately higher budget for UI helps to achieve that goal.
However, we recognize that UI has also consistently received far fewer bids than Eversource and has generally
accepted all eligible bids that were not otherwise withdrawn or disqualified. By contrast, Eversource has frequently left
7
Solar Energy Industries Association, Solar Market Insight Report Q3 2026 (September 10, 2026), https://seia.org/researchresources/solar-market-insight-report-q3-2026/.
8
Id.
3
eligible projects “stranded” in the bid queue since their selection would cause Eversource’s annual capacity cap to be
exceeded.9
To ensure that we don’t strand any of the available program capacity or budget, we recommend that a “blended”
or hybrid approach could ensure that UI’s budget remains sufficient to meet its allocated capacity auction commitments,
while also ensuring that budget dollars and available MW capacity do not go unused. Accordingly, we recommend that
following the conclusion of the initial awards for the Year 8 solicitation, the Authority allow any unused UI
budget/capacity allocation to be assigned to the next eligible bids in the Eversource queue.
3. Bid Preferences
During the Year 7 annual review, the Authority retained the same bid preference categories adopted for Year 6 of
the SCEF Program: specifically, a 40% bid preference for solar canopy projects and a 20% bid preference for
landfill or brownfield projects. Year 7 Decision, pp. 12-13.
For Program Year 8, the Authority seeks stakeholder feedback regarding the continued appropriateness of the
existing bid preferences and any proposed modifications thereto. As with the procurement price cap discussed
above, the Authority expects stakeholders to provide a comprehensive justification for any recommended changes,
including an assessment of:
• Potential ratepayer impacts;
• Effects on stakeholder participation, project diversity, and overall market competitiveness; and
• Consistency with and advancement of the SCEF Program’s broader objectives.
As conveyed in our earlier comments to DEEP, Save the Sound generally supports DEEP’s recommendation to
maintain the solar canopy and brownfield/landfill bid preferences at 40% and 20%, respectively. 10
Landfill and Brownfield Projects
We note, however, that in the Year 7 solicitation, UI received no proposals for projects sited on a brownfield or
landfill, while Eversource received just one proposal for a landfill-sited project. The successful landfill project was the
second lowest bid received by Eversource (factoring in the 20% bid preference). Given its placement in the bid queue, it
would appear that the 20% bid preference is sufficient to support landfill-sited projects, and it seems that the relative lack
of proposals for such projects may be the result of factors other than price.
With no landfill or brownfield projects submitted in the previous Year 6 solicitation and with just one such project
bid in the Year 7 solicitation, there appears to be a general slowing of projects in this project category within the SCEF
9 See, e.g., SCEF awarded bids for the Year 3, Year 4, and Year 7 program solicitations. In each of those years, UI selected all the
eligible bids (i.e., those not disqualified or withdrawn) submitted, while Eversource stranded nine projects, ten projects, and seven
projects (respectively) that were eligible for selection in the bid queue. Docket No. 21-08-04, Motion No. 8 (UI), Motion for Approval
of Year 3 Selections, Attachment B (May 18, 2022); Docket No. 21-08-04, Motion No. 12 (Eversource) – Motion for Review and
Approval of Orders Nos. 4 and 5, Attachment B (June 15, 2022); Docket No. 22-08-04, Motion No. 11 (Eversource), Motion for
Review and Approval of Year 4 Selections (May 16, 2023); Docket No. 22-08-04, Motion No. 12 (UI), Motion for Review and
Approval of Year 4 Selections (May 12, 2023); Docket No 25-08-04, Motion No. 6 (Eversource), Motion for Approval of Orders 9 &
10, Attachment B (May 15, 2026); Docket No. 25-08-04, Motion No. 7 (UI), Motion for Review and Approval of Orders 9 &10,
Attachment B (June 18, 2026).
10
Save the Sound, supra note 1.
4
program While this could be attributable to a variety of factors, given the changes to the federal tax credits and trade
policy as noted above, solar projects of all types will face increased economic pressures. Additional specific input from
the solar industry regarding changed circumstances for new projects should inform the incentive structure for SCEF
projects across the spectrum.
Solar Canopy Projects
We note that in the Year 7 solicitation, UI received no proposals for solar canopy projects, while Eversource
received proposals for two such projects. These two projects were bid at $274.15/MWh (evaluated bid price of
$164.49/MWh) and $298.13/MWh (evaluated bid price of $178.88/MW/h). These projects ranked 7 th and 16th out of the
twenty submitted bids, with the former project being one of the ten selected low-bid projects. Given their placement in the
bid queue, it appears that the 40% bid preference is sufficient to support solar canopy projects, although increasing the bid
preference would result in more canopy projects being selected.11
4. Proposed Programmatic Changes
Lastly, the Authority welcomes stakeholder input on targeted programmatic modifications that could improve the
effectiveness and clarity of the SCEF Program in its upcoming year.
Please note that the Authority is not considering structural changes to the SCEF Program at this time, given the
Program’s maturity as it enters its final year. Accordingly, any recommendations should be limited to discrete,
incremental improvements, such as:
• Clarifying existing requirements or definitions; or
• Improving transparency or efficiency in the application or selection process.
Suggestions should be specific, actionable, and focused on refining—rather than redefining—the existing Program
framework.
Given that this is the final year for the current SCEF program before it is replaced by a successor “Community
Solar” program pursuant to Public Act 26-127, Save the Sound has no recommendations for substantive programmatic
changes. There will likely, however, be recommendations for the successor program that improve upon certain aspects of
the SCEF program moving forward.
Conclusion
Thank you for the opportunity to submit these comments. We look forward to continuing our engagement with
the Authority, the EDCs and all the stakeholders to ensure the continued success of the SCEF program.
Respectfully submitted,
/s/ Charles J. Rothenberger
Charles J. Rothenberger
Director of Government Relations, CT
11
It is worth noting that, following two years in which no solar canopy project bids were submitted, the solar canopy bid preference
was raised from 30% to 40% for the 2025 (Year 6) solicitation. Following that change, Eversource received one successful canopy
project bid in Year 6, and as noted above Eversource received two solar canopy bids in the most recent Year 7 solicitation. We would
strongly argue against any proposals to lower the canopy bid preference below 40%.
5
CERTIFICATION
This is to certify that on this 14h day of September 2026, a copy of the foregoing document was served upon each
person designated on the Authority’s official service list in this proceeding in accordance with R.C.S.A. § 16-1-15.
By:
/s/ Charles J. Rothenberger
Charles J. Rothenberger, Esq.
Director of Government Relations, CT
6