As listed on the current system: Written Comments - 09/14/2026 [26-08-04] (Verogy)
Files
Verogy SCEF Year 8 Written Comments 2026.09.14.pdf
PDF · 201 KB · 8 pagesText searchable
Download Verogy SCEF Year 8 Written Comments 2026.09.14.pdfRead the text of Verogy SCEF Year 8 Written Comments 2026.09.14.pdf
ATT1_ES SCEF YR7 RESULTS.xlsx
Excel · 23 KBText searchable
Download ATT1_ES SCEF YR7 RESULTS.xlsxRead the text of ATT1_ES SCEF YR7 RESULTS.xlsx
Text of Verogy SCEF Year 8 Written Comments 2026.09.14.pdf
Extracted from the file · 17,393 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
ANNUAL REVIEW OF STATEWIDE SHARED :
CLEAN ENERGY FACILITY PROGRAM
:
REQUIREMENTS – YEAR 8
:
DOCKET NO 26-08-04
SEPTEMBER 14, 2026
RESPONSE TO AUTHORITY’S REQUEST FOR WRITTEN COMMENTS ISSUED
AUGUST 25, 2026
Verogy Holdings, LLC (“Verogy”) respectfully submits the following written comments to questions
issued by the Public Utilities Regulatory Authority (“The Authority”) dated August 25, 2026, intended to align
the SCEF program with Program Objectives1 and other Connecticut climate goals.
Please find Verogy’s comments below:
1. PROCUREMENT PRICE CAPS
a) Comment: Verogy asserts that since the issuance of the SCEF Year 7 Final Decision on
December 17, 2025, there have been significant changes to circumstances entirely outside of
the control of SCEF program participants which justify further increases to program price caps.
Namely, on August 6, 2026, the Federal Government issued a decision regarding the “Section
232 Tariffs” and established, amongst other price controls, a minimum import price of
$0.22/Wdc for solar cells, $0.38/Wdc for solar modules and an additional 15% ad valorem
tariff (with exceptions for certain “U.S. Treaty Partners”)2. While the Section 232 Tariffs are
scheduled to go into effect December 4, 2026, both domestic and international module vendors
are now aware of the decision and have immediately began increasing module prices. While
the final impacts of the Section 232 Tariff has yet to be settled at the time of writing these
comments, Verogy has received indication from various module suppliers that these Section
232 Tariffs will likely increase module cost by at least $0.11 - $0.13/Wdc for imported modules
and $0.10 - $0.15/W for domestically manufactured modules (though the impact to domestic
1 The objectives (Program Objectives) outlined in the Year 5 SCEF Final Decision include:
1.
2.
Annually and cost-effectively procure up to 50 megawatts of SCEFs, as defined in Conn. Gen. Stat § 16-244z;
Provide savings to specific categories of customers, particularly customers with low- to moderate-income (LMI), low-income
service organizations, and customers who reside in environmental justice communities; and
3. Lower or eliminate barriers to entry for Subscriber Organizations, if and when possible.
2 Adjusting Imports of Polysilicon and its Derivatives into the United States – The White House
1
module price is less certain at this time). Depending on the exact design and equipment spec
of a non-canopy SCEF project, the Section 232 Tariffs likely imply an approximate 5 – 7.5%
unavoidable increase in build cost. Therefore, Verogy asserts that the Section 232 Tariffs alone
justify a commensurate increase of 5 – 7.5% to the SCEF Year 7 price cap amounting to a price
cap of $192.09 - $196.66/MWh.
Beyond the imposition of the Section 232 Tariffs, Verogy suggests that other factors,
either entirely or largely outside of the control of SCEF Project Developers, justify further price
cap increases. These include increasing interconnection costs with no effective way to costshare, a constrained supply chain resulting from the rush to safe harbor projects by July 4,
2026, or have projects placed in service by December 31, 2027, and economy-wide inflation
resulting from the ongoing conflict in the Middle East. Lastly, the cost of financing for these
renewable energy projects (along with all infrastructure projects) has significantly increased
driven primarily through the precipitous rise of interest rates—as of the date of this filing the
US 10-year Treasury exceeded 5% in intraday trading (a ~20% increase over a one-year
period).
Verogy suggests that even without the annual budgetary program cap in place, price
cap increases would be justified for these reasons. However, should the annual budgetary
program cap be retained, the budgetary cap would limit ratepayer impact should price cap
increases be adopted.
Verogy notes that results from the Eversource Year 7 SCEF procurement indicate that
competition, not price caps, will likely provide the upper bound of selected bid prices for SCEF
Year 8. Notwithstanding the Year 7 SCEF results, increasing price caps to account for
verifiable changed circumstances such as the Section 232 Tariffs, the Middle East conflict, and
the cost of financing will ensure program viability in Year 8.
2. BUDGET REALLOCATION
a) Comment: Verogy supports re-allocating the combined $15,574,645.44 SCEF budget to the
standard 80/20 share between Eversource and United Illuminating service territories. Verogy
asserts that doing so would provide more program funding for a larger number of viable SCEFs
2
in the geographically larger Eversource territory without posing a threat to SCEF Year 8
viability for projects sited in the United Illuminating territory which was undersubscribed in
the Spring SCEF Year 7 procurement. Notably, Verogy asserts that any unallocated program
budget or capacity following the conclusion of the SCEF Year 7 Fall United Illuminating
procurement should also be re-allocated using an 80/20 split between Eversource and United
Illuminating, rather than exclusively rolling forward to the Year 8 United Illuminating budget
and capacity limits.
3. BID PREFERENCES
a) Comment: Verogy suggests that the current bid preference levels of 40% for solar canopy
projects and 20% for landfill or brownfield projects are appropriate and should be maintained
for SCEF Year 8.
However, Verogy asserts that landfill or brownfield SCEFs should be able to bid above
any general program price cap so long as the evaluated bid price is below general price cap in
the same manner solar canopy projects. Verogy’s rationale for this suggestion is three-fold.
First, this paradigm is already in place for SCEF Canopy projects. Treating Bid Preferences
differently depending on the technology type causes confusion for Subscriber Organizations
contrary to Program Objective 3 in the same way that having different price caps for different
project types caused confusion in previous program years as PURA alluded to in its SCEF Year
6 Final Decision in Docket 24-08-04 dated December 11, 2024 (see Section III.C.2.c of Year
6 Final Decision3). Second, the Brownfield & Landfill bid preferences are location-based Bid
Preferences intended to drive SCEF deployment to previously disturbed sites (with little
alternative use) and away from greenfield sites. Therefore, Landfill and Brownfield SCEFs
have the same “unique environmental benefits” as Solar Canopies cited by PURA in its SCEF
Year 5 Final Decision filed December 6, 2023 in Docket 23-08-04 (see Section III.C.2.c of
Year 5 Final Decision4). Third, similar to Solar Canopies, SCEFs sited on Landfill &
Brownfield sites carry additional costs compared to greenfield projects. For example, Landfill
SCEFs must utilize specialized racking & monitor gas wells while Brownfield SCEFs may be
required to conduct site remediation and dispose of contaminated soils appropriately.
3 SCEF Year 6 Final Decision
4 SCEF Year 5 Final Decision
3
Therefore, Brownfield & Landfill SCEFs should be able to bid above an existing price cap in
order to streamline the SCEF program design, drive SCEF deployment toward pre-disturbed
areas, increase project type diversity and offset the additional costs carried by Landfill or
Brownfield SCEFs thereby accomplishing Program Objectives 1 & 3.
To justify the 20% bid preference and the ability for Landfill or Brownfield SCEFs to bid above
the general price cap, Verogy refers The Authority to its 2024 confidential Appendix B filings
submitted to DEEP during the SCEF Year 5 procurement. These filings included Appendix B
submissions for one landfill (SCEF5-8747) and one greenfield (SCEF5-8754) project. Since
these projects were bid into the same auction period, they were developed under similar market
conditions. As can be seen in section B2.1 of the respective confidential Appendix B filings,
the anticipated cost of the Landfill project was 18.4% higher than the anticipated cost of the
greenfield project, almost identical to the 20% bid preference. However, despite having an
18.4% higher build cost, the Landfill project was subject to the same effective price cap as the
greenfield project. Verogy asserts that as market conditions evolved since Program Year 5 and
inflation continued to drive up build costs, the general price cap has become prohibitive for
Landfill or Brownfield projects, thus requiring that these projects be able to bid above the
general price cap in a manner similar to Canopy projects for the reasons stated above.
Verogy notes that should the annual budgetary program cap be retained it would
provide protection against ratepayer impact if Brownfield and Landfill projects were allowed
to bid above the general program price cap.
4. PROGRAMMATIC CHANGES
a) Comment: As stated in its comments submitted June 24, 2025, in the subject docket, Verogy
asserts that the slope restrictions specific to the SCEF program should be removed entirely.
Verogy asserts that removing the SCEF program-specific siting restrictions would in
fact better align the SCEF and NRES programs, as the NRES program does not have any
program-specific siting requirements. In its response to CAE-3 in the subject docket, DEEP
states that “Projects participating in SCEF are more akin to grid-scale projects because there
4
are no requirements that the projects be sited close to load, unlike the Nonresidential
Renewable Energy Solutions program.” Verogy suggests that while DEEP’s assertion may
hold true for Small and even some Medium NRES projects up to 1 MWac, where NRES
systems are often sited on customer premises, many Medium and nearly all Large NRES
projects are off-site SAM projects, with Beneficial Account load being physically distant to
the Project Site. In reality, nearly all NRES projects exceeding 1 MWac are physically identical
to SCEF projects in that they are land-based off-site projects, and therefore similar to “gridscale projects” yet are not beholden to any program-specific siting criteria.
Further, as described in Verogy’s previous comments in the subject docket, the SCEFspecific siting criteria ultimately decrease the number of viable SCEF Project Sites (or decrease
the capacity deployable at a given Project Site) even for projects that would be in full
compliance with existing extra-programmatic permits and requirements such as the CT DEEP
Construction Stormwater General Permit or Connecticut Siting Council permits. Verogy notes
that all SCEF (and NRES) projects over 1 MWac must already go through review by DEEP
specifically (amongst other reviews) in order to be permitted. Therefore, since DEEP must
already review SCEF projects, maintaining any SCEF program-specific siting criteria is
duplicative and ultimately to the detriment of in-state distributed generation deployment, and
removing this requirement from the SCEF program specifically does not undermine DEEP’s
existing permitting authority.
Lastly, as with nearly any review processes, it is ultimately more cost and time-efficient
to have only a single review process rather than duplicative processes. Requiring only one
review process would reduce the administrative costs and time of the SCEF program to the
benefit of Connecticut taxpayers and ratepayers.
Therefore, in order to align the NRES and SCEF programs for similar projects, increase
deployable distributed generation capacity, and streamline the permitting process of all SCEF
projects without undermining DEEP’s existing permitting authority, Verogy asserts that the
SCEF program-specific siting requirements be removed entirely.
5
5. PROGRAMMATIC ISSUES
i. Comment: Notwithstanding any commentary above, Verogy strongly asserts that the
budgetary program cap imposed in SCEF Year 7 creates a barrier of entry for projects
that would otherwise be eligible for the SCEF program and economically feasible
under the program price caps and statutory annual procurement limit of 50 MWac,
running contrary to Program Objectives1 & 3. Additionally, Verogy believes that the
budgetary program cap runs contrary to the plain language and intent of the
Program’s enabling statute and was established without proper authorization.
Public Act 25-173 § 9 altered Conn. Gen. Stat. § 16-244z(c)(1)(B) to state:
“For procurement and tariff years commencing on and after January 1, 2025, the
authority may exceed the limits on total available megawatts…(if) the aggregate dollar
amount of procurements of energy and renewable energy credits over the tariff term
for all selected projects does not exceed the aggregate dollar amount of procurements
of energy and renewable energy credits over the tariff term for all projects selected in
such program during the calendar year 2024. The authority shall determine the manner
of exceeding such limits”5 (emphasis added).
Verogy asserts that The Authority’s interpretation of Conn. Gen. Stat. § 16244z(c)(1)(B) does not grant The Authority the ability to establish a budgetary
procurement cap in addition to the existing megawatt procurement caps that would
reduce available megawatts in the SCEF program. Conn. Gen. Stat. § 16-244z(c)(1)(B)
specifically grants The Authority the ability to exceed existing megawatt caps if the
aggregate cost of a future procurement is less than 2024 levels, as only the word
“exceed” is used throughout this section. It is well established in Connecticut that
administrative agencies are strictly limited by their express statutory authority. Such
action to reduce the MW caps is ultra vires. The language of the statute and intent of
the legislation is clear on its face. Notwithstanding this plain language, understanding
the history and context of the Connecticut distributed generation programs makes it
even more clear that the purpose of the megawatt cap for the SCEF and NRES
5 AN ACT CONCERNING ENERGY AFFORDABILITY, ACCESS AND ACCOUNTABILITY.
6
programs was to replace a budgetary cap. The legacy LREC/ZREC programs contained
budgetary caps and were in use for nearly a decade, the legislature in passing the laws
to create the NRES and SCEF programs after the LREC/ZREC programs explicitly and
intentionally installed a megawatt cap and not a budgetary cap. This context makes the
unilateral installation of a budgetary cap by The Authority even more inappropriate.
The underlying rationale, explicitly called out, for taking such measures, was to reduce
ratepayer costs.6 When in fact, the most significant cost increase faced by Connecticut
ratepayers is caused by a dearth of in-state energy supply and lack of additional
generation capacity development. Ultimately, by effectively replacing the megawatt
program cap, The Authority contradicts plain statutory language and legislative intent
which has the effect of increasing the cost of electricity for Connecticut ratepayers.
Beyond running counter to statute and clean energy goals, the Eversource SCEF Year
7 procurement results7 clearly demonstrate that the budgetary cap is acting as a barrier
to entry to otherwise viable SCEFs. Without any budgetary or capacity allotment from
terminated projects, Eversource would have been allocated 40 MWac of procurement
capacity. However, the budgetary allotment of $9,864,740.81 was enough to support
only 30.97 MWac of actual SCEFs, meaning that without the budgetary allotment from
terminated projects, approximately 9 MWac of eligible and cost-competitive SCEFs
would have been denied an award, an amount equating to 22.5% of Eversource’s 40
MWac capacity allotment. See Attachment 1 accompanying this filing for reference.
Verogy asserts that The Authority should entirely remove the budgetary program cap
and revert exclusively to a megawatt cap for SCEF Year 8, as the budgetary cap
hampers Program Objectives 1 & 3 and was established without proper authorization
or process.
6 Section IV.B.4 of the SCEF Year 7 Final Decision states:
“The Authority’s adoption of a budgetary cap falls squarely within the broad discretion granted under General Statutes § 16-244z(c)(1)(A),
which authorizes PURA to monitor the SCEF Program’s competitiveness and adjust the annual purchase amount or other procurement
parameters as necessary. The statute expressly provides this flexibility to maintain a competitive and efficient program. This approach also
aligns with the intent of General Statutes § 16-244z(c)(1)(B), which allows the selection of projects exceeding the applicable MW cap in
future years provided that total program costs do not exceed the aggregate cost of projects selected in 2024.4 While General Statutes § 16244z(c)(1)(B) does not expressly contemplate instances in which the total 2024 cost limit is exceeded even if the MW cap is not, the
Authority’s broad authority under § 16-244z(c)(1)(A) encompasses the ability to impose comparable cost-based constraints on overall
SCEF Program expenditures.”
7 Eversource Docket 25-08-04 Motion for approval Orders 9 & 10
7
I certify that a copy of this submission has been filed with the Authority as an electronic web filing
and is complete. Verogy thanks the Authority for the opportunity to provide written comments for
consideration in the SCEF Year 8 program development.
Respectfully submitted,
William Herchel
CEO
Verogy Holdings, LLC
Phone: [phone removed]
Email: [email removed]
8
Text of ATT1_ES SCEF YR7 RESULTS.xlsx
Extracted from the file · 6,979 characters
[Sheet: Attachment 1]
The Connecticut Light and Power Company dba Eversource Energy
Docket No. 19-07-01 and 25-08-04
Compliance - Order Nos. 9 and 10
Attachment B
May 15, 2026
Page 1 of 1
Attachment B
Year 7 SCEF Public Summary
Baseline Budget Available | 9864750.81
Total Budget Adjusted for Terminations and Smaller System Sizes | 12947508.976883195
Total Budget Selected & Annual Payments to Subscriber Organizations | 12953704.94962
Remaining Budget Unallocated | -6195.972736803815
Annual Payments to Subscribers | 1892180.83
Total MW Selected | 40.89
Total Projected 20-Year Payments to Subscriber Organizations | 259074098.9924
Total Projected 20-Year Payments to Subscribers | 37843616.6
Project ID | Status | Project Name | Subscriber Organization | Site Address | Fuel Type/Technology | As-Bid Project Size (MW) | Awarded Project Size (MW) | Expected Annual Production (kWh) (based on Awarded Project Size where applicable, otherwise As-Bid Project Size) | Bid Price ($/MWh) | Landfill Bid Preference (Y/N as determined by DEEP) | Brownfield Bid Preference (Y/N as determined by DEEP) | Solar Carport/Canopy Bid Preference (Y/N as determined by DEEP) | Evaluated Bid Price (/MWh) | Non-binding, estimated in-svc date provided at time of tariff terms agreement execution | Projected Annual Amount to be Paid to Subscriber Organization | Projected Annual Amount to be Paid to Subscribers | Customer Class/Tariff (Customer Rate) | Cumulative Program Budget Allocation | Cumulative Capacity Procured (MWac)
SCEF7-8815 | Selected | SSITolland | SSI Tolland II, LLC | 360 Somers Road, Ellington, Connecticut 06029 | Solar PV | 2997 | 2997 | 6410700 | 143.95 | N | N | N | 143.95 | 2027-03-31 00:00:00 | 922820.2649999999 | 160267.5 | N/A - New Construction | 922820.2649999999 | 2.997
SCEF7-8814 | Selected | USSTorrington | USS Torrington Solar LLC | 105 Vista Drive, Torrington, Connecticut 06790 | Solar PV | 1998 | 1998 | 3265300 | 179.95 | Y | N | N | 143.96 | 2027-12-31 00:00:00 | 587590.735 | 81632.5 | N/A - New Construction | 1510411 | 4.995
SCEF7-8809 | Selected | 300_Rocky_Hill | Greenskies Clean Energy LLC | 300 Pleasant Valley Rd, Rocky Hill, Connecticut 06067 | Solar PV | 4700 | 4700 | 7452811 | 149.67 | N | N | N | 149.67 | 2029-04-23 00:00:00 | 1115462.2223699999 | 186320.27500000002 | N/A - New Construction | 2625873.2223699996 | 9.695
SCEF7-8810 | Selected | 254_Mystic | Greenskies Clean Energy LLC | 254 Mystic Rd, North Stonington, Connecticut 06359 | Solar PV | 4999 | 4999 | 9963122 | 153.45 | N | N | N | 153.45 | 2029-04-23 00:00:00 | 1528841.0708999997 | 249078.05000000002 | N/A - New Construction | 4154714.2932699993 | 14.694
SCEF7-8825 | Selected | EHBY26 | 9YST LLC | 9 Young St, East Hampton, Connecticut 06424 | Solar PV | 2700 | 2700 | 5112273 | 157.34 | N | N | N | 157.34 | 2027-12-01 00:00:00 | 804365.03382 | 127806.82500000001 | N/A - New Construction | 4959079.327089999 | 17.394
SCEF7-8808 | Selected | Taug_3 | Greenskies Clean Energy LLC | PID 62-1-1 & 61-1-1 Pequot Trail, Stonington, Connecticut 06378 | Solar PV | 4999 | 4999 | 9471360 | 157.74 | N | N | N | 157.74 | 2029-04-23 00:00:00 | 1494012.3264000001 | 236784 | N/A - New Construction | 6453091.6534899995 | 22.393
SCEF7-8812 | Selected | 185_Enterprise | Greenskies Clean Energy LLC | 2537 Mount Vernon Rd, Southington, CT 06010 | Solar PV | 4999 | 4999 | 8172356 | 274.15 | N | N | Y | 164.48999999999998 | 2029-04-23 00:00:00 | 2240451.3973999997 | 204308.90000000002 | N/A - New Construction | 8693543.050889999 | 27.392
SCEF7-8827 | Selected | Somers_SF | Somers Solar Farm, LLC | 159 South Road, Somers, Connecticut 06071 | Solar PV | 3575 | 3575 | 6619654 | 164.86 | N | N | N | 164.86 | 2029-04-23 00:00:00 | 1091316.1584400001 | 165491.35 | N/A - New Construction | 9784859.209329998 | 30.967
SCEF7-8823 | Selected | Windsor_S2 | VCP Realty, LLC | 965 Stone Road, Windsor, Connecticut 06095 | Solar PV | 4975 | 4975 | 9130587 | 164.87 | N | N | N | 164.87 | 2029-04-23 00:00:00 | 1505359.87869 | 228264.67500000002 | N/A - New Construction | 11290219.088019999 | 35.942
SCEF7-8817 | Selected | Coventry_S1 | VCP Realty, LLC | 65 Cedar Swamp Extension, Coventry, Connecticut 06238 | Solar PV | 4950 | 4950 | 10089070 | 164.88 | N | N | N | 164.88 | 2029-04-23 00:00:00 | 1663485.8616 | 252226.75 | N/A - New Construction | 12953704.94962 | 40.892
SCEF7-8822 | Disqualified | Moose_Solar | Allco Finance Limited Inc. | 75 W Fisk Rd, Hampton, Connecticut 06247 | Solar PV | 2000 | N/A | 4045000 | 169.2 | N | N | N | 169.2 | N/A | 684414 | 101125 | N/A - New Construction
SCEF7-8820 | Disqualified | Giulietta_Solar | Allco Finance Limited Inc. | 1219 Voluntown Road, Griswold, Connecticut 06351 | Solar PV | 2000 | N/A | 4613800 | 169.3 | N | N | N | 169.3 | N/A | 781116.3400000001 | 115345 | N/A - New Construction
SCEF7-8830 | Disqualified by DEEP | Ramm_Farm | Telyon Clean Energy, LLC | Lot 67 Route 66, Columbia, Connecticut 06237 | Solar PV | 3960 | N/A | 6869500 | 170 | N | N | N | 170 | N/A | 1167815 | 171737.5 | N/A - New Construction
SCEF7-8811 | Submitted | 146_Tripp | Greenskies Clean Energy LLC | 146 Tripp Rd, Ellington, Connecticut 06029 | Solar PV | 2750 | N/A | 5285550 | 172.8 | N | N | N | 172.8 | N/A | 913343.04 | 132138.75 | N/A - New Construction
SCEF7-8816 | Submitted | Colt_Hwy_Solar | Colt Highway Solar, LLC | 222 Colt Highway, Farmington, Connecticut 06032 | Solar PV | 4950 | N/A | 8222069 | 177.5 | N | N | N | 177.5 | N/A | 1459417.2474999998 | 205551.725 | N/A - New Construction
SCEF7-8828 | Submitted | 260_Huyshope_SC | VCP Realty, LLC | 260 Huyshope Ave, Hartford, Connecticut 06103 | Solar PV | 1825 | N/A | 2894331 | 298.13 | N | N | Y | 178.878 | N/A | 862886.9010300001 | 72358.27500000001 | N/A - New Construction
SCEF7-8821 | Submitted | WinchesterSolar | Allco Finance Limited Inc. | 132 Spencer Hill Road, Winchester, Connecticut 06098 | Solar PV | 3000 | N/A | 5957000 | 180.7 | N | N | N | 180.7 | N/A | 1076429.9 | 148925 | N/A - New Construction
SCEF7-8818 | Submitted | Ruby_Solar | Allco Finance Limited Inc. | 0 Norwich Road, Plainfield, Connecticut 06374 | Solar PV | 3000 | N/A | 5377200 | 181.5 | N | N | N | 181.5 | N/A | 975961.7999999999 | 134430 | N/A - New Construction
SCEF7-8819 | Submitted | Harrison_Solar | Allco Finance Limited Inc. | 8 Alice Road, Griswold, Connecticut 06351 | Solar PV | 4000 | N/A | 7793600 | 181.51 | N | N | N | 181.51 | N/A | 1414616.336 | 194840 | N/A - New Construction
SCEF7-8813 | Submitted | Stafford_Storrs | Greenskies Clean Energy LLC | PID 7-11-8 & 7-11-17 Storrs Road, Storrs, Connecticut 06268 | Solar PV | 4999 | N/A | 9256749 | 181.79 | N | N | N | 181.79 | N/A | 1682784.40071 | 231418.725 | N/A - New Construction
SCEF7-8824 | Withdrawn | Bloomfield_S1 | VCP Realty, LLC | 36 Tobey Road, Bloomfield, Connecticut 06002 | Solar PV | 3875 | N/A | 6838216 | 164.89 | N | N | N | 164.89 | N/A | 1127553.43624 | 170955.40000000002 | N/A - New Construction