Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Compliance with Order No. 2 of the Final Decision in Docket No. 25-08-05

Compliance Filing, Order No. 2

Filed by Avangrid

Part of

Annual Energy Storage Solutions Program Review- Year 6

Type of filing
Compliance filing (Compliance Filing, Order No. 2)
Date filed
July 16, 2026
Filed by
Avangrid
Files
1

As listed on the current system

Compliance Filings, 07/16/2026 [26-08-05] Order No.2 / Avangrid / Compliance with Order No. 2 of the Final Decision in Docket No. 25-08-05

This filing on the current system (opens in a new tab)

Files1

July 16, 2026 Via Electronic Filing Mr. Jeffrey R. Gaudiosi, Esquire Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 26-08-05, Annual Energy Storage Solutions Program Review – Year 6 Docket No. 25-08-05, Annual Energy Storage Solutions Program Review – Year 5 Compliance with Order No. 2 of the Final Decision in Docket No. 25-08-05 Dear Mr. Gaudiosi: The Connecticut Light & Power Company d/b/a Eversource Energy (“Eversource”), and The United Illuminating Company (“UI” and together with Eversource “the Electric Distribution Companies” or “EDCs”) respectfully submit to the Public Utilities Regulatory Authority (“PURA” or the “Authority”) their compliance with Order No. 2 of the Final Decision issued in Docket No. 25-08-05 on December 17, 2025 (the “Final Decision”). Specifically, Order No. 2 of the 2025 Final Decision states: Reference Decision, July 28, 2021, Docket No. 17-12-03RE03, Order No. 12, p. 52: No later than October 1, 2021, the EDCs shall provide a list of all electric storage systems that are eligible for the Program in Docket 21-08-05. Any updates shall be submitted in the appropriate Annual or Program Review docket by August 1, and annually thereafter until the ESS Program stops accepting new enrollments, as applicable. The Program Administrators (“PAs”)1 maintain a continuously updated list of all electric storage systems eligible for the ESS Program, which is available on the Energy Storage Solutions (“ESS”) Program (the “Program”) website: https://energystoragect.com/submitted_ess_system_status_list/. This website constitutes the official and continuously updated record of eligible systems in satisfaction of Order No. 2 and is updated as new systems are submitted and verified in accordance with Program processes. The PAs will also include reference to this in the updated version of the ESS Program Manual to be filed with the Authority on August 1, 2026 in compliance with Order No. 3 in Docket No. 261 The EDCs, together with the Connecticut Green Bank, serve as the Program Administrators. 08-05. Accordingly, the EDCs have fully complied with the requirements of Order No. 2 of the Final Decision. The undersigned certifies that a copy of the foregoing was served on all parties on the service list in this proceeding on this date. Respectfully submitted, THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY By: Jennifer E. Galiette Jennifer E. Galiette Senior Counsel Eversource Energy P.O. Box 270 Hartford, CT 06141-0270 T: [phone removed] E: [email removed] THE UNITED ILLUMINATING COMPANY Alex E. Soter By: Alex E. Soter Counsel UIL Holdings Corporation Phone: [phone removed] [email removed] As agent for The United Illuminating Company cc: Service List