Written Exceptions
Filed by CL&P
- Type of filing
- Exception (Written Exceptions)
- Date filed
- November 10, 2026
- Filed by
- CL&P
- Files
- 1
As listed on the current system
Exception to Decision filed 11/10/2026 (CL&P) [26-08-05]
Files1
Docket No. 26-08-05 - Written Exceptions.pdf
PDF · 202 KB · 8 pagesText searchable
Download Docket No. 26-08-05 - Written Exceptions.pdfRead the text of Docket No. 26-08-05 - Written Exceptions.pdf
107 Selden Street, Berlin, CT 06037
P.O. Box 270, Hartford, CT 06141-0270
Jennifer E. Galiette
Senior Counsel
[phone removed]
[email removed]
November 10, 2026
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, CT 06051
Re:
Docket No. 26-08-05, Annual Energy Storage Solutions Program Review – Year 6 –
Written Exceptions
Dear Mr. Gaudiosi:
The Connecticut Light and Power Company d/b/a Eversource Energy (the “Company”) submits
the attached written exceptions to the October 29, 2026 proposed final decision in this Docket.
The Company does not request oral argument, but reserves the right to participate if another
participant timely requests oral argument.
Sincerely,
Jennifer E. Galiette
Jennifer E. Galiette
Senior Counsel
On behalf of CL&P d/b/a Eversource Energy
cc:
Service List
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
ANNUAL
ENERGY
STORAGE
SOLUTIONS PROGRAM REVIEW –
YEAR 6
:
:
:
:
DOCKET NO. 26-08-05
NOVEMBER 10, 2026
WRITTEN EXCEPTIONS OF THE CONNECTICUT LIGHT AND POWER COMPANY
D/B/A EVERSOURCE ENERGY
I.
INTRODUCTION
The Connecticut Light and Power Company d/b/a Eversource Energy (“CL&P” or the
“Company”) submits these written exceptions in response to the October 29, 2026 proposed final
decision (the “Proposed Final Decision”) of the Public Utilities Regulatory Authority (“PURA”)
in the above-captioned docket. These written exceptions ask PURA to make five important
clarifying changes to the Proposed Final Decision regarding the energy storage solutions (“ESS”)
program (the “ESS Program” or the “Program”).
II.
NECESSARY CHANGES TO THE PROPOSED FINAL DECISION
A.
The Proposed Final Decision Should Be Clarified to Reflect that the Electric
Vehicles (“EVs”) Compliance Filing Should Be Submitted by the Electric
Distribution Companies (“EDCs”) Only
Pages 14-15 of the Proposed Final Decision directs the Program Administrators (the
electric distribution companies “EDCs” and The Connecticut Green Bank (“Green Bank”)) to
submit a compliance filing to PURA that includes, in part, the results of the EV Pilot programs no
later than August 1, 2027. Eversource respectfully requests that PURA include the same language
directing the EDCs to be solely responsible for this portion of the filing, as it did for the
Interconnection portion. Specifically, Item #1 on Page 14 and subpart (a) of Order No. 23 should
be revised to include language stating: “Although this will be a joint filing, the EDCs shall be
-1-
solely responsible for this portion of the filing because the EDCs administer the EV Pilot
programs.” Green Bank is not involved in either of the EV pilots. Therefore, the Proposed Final
Decision should be clarified to indicate that the EV pilot programs portion of the compliance filing
should be the responsibility of the EDCs only. This clarification should be reflected on Pages 1415 of the Proposed Final Decision and in the corresponding Order No. 23.
B.
The Proposed Final Decision Should Be Revised To Eliminate Formal
Enrollment Incentive Clawbacks when the Enrollment Incentive is less than
$1000 Consistent With the Record Evidence In This Docket
The Program Administrators estimated that implementing an enrollment incentive
clawback would require approximately 5-10 hours of full-time employment hours totaling
approximately $707-$1414 of administrative labor. 1 Additionally, no stakeholder expressed
support for a residential enrollment incentive clawback, with all stakeholders citing that the
administrative effort to enforce the clawback would likely be greater than the amount that could
be recovered. For example, The Office of Consumer Counsil (“OCC”) acknowledged that “a de
minimis threshold may be appropriate where administrative costs would be disproportionate to the
amount recoverable” and subsequently revised its position stating that it did not oppose limiting
the clawback mechanism to commercial priority customers and residential TPO systems. 2
In the Proposed Final Decision, PURA expresses its concern that the enrollment incentive
is a material payment and it could be substantial, stating “the enrollment incentive may be $3,900
or more for grid-edge residential customers and may be substantially higher for commercial
priority customers.” 3 The Proposed Final Decision also highlights that without an enrollment
incentive clawback mechanism in place, new third-party owners (“TPOs”) could enroll large
1
Q-CAE-9 at 3.
2
Proposed Final Decision at 26, citing OCC Written Comments (filed July 9, 2026) at 4.
3
Proposed Final Decision at 28.
-2-
swaths of customers, collect the enrollment incentive, and then unenroll those very same
customers. 4
Therefore, based on the concerns expressed by PURA and other stakeholders, and
consistent with the record evidence in this docket, Eversource believes an enrollment incentive
clawback should only be implemented when an enrollment incentive is greater than $1,000.
Eversource submits that requiring ratepayers to bear between $707-$1414 in administrative and
collection costs to recover an amount less than $1,000 is neither reasonable nor cost-effective.
Establishing an enrollment incentive clawback provision for customers receiving more than $1,000
in enrollment incentives would provide a more efficient and fiscally responsible means of
safeguarding ratepayer-funded program resources.
C.
The FTM Storage Working Group Should be Led by All the PAs
Eversource respectfully requests that PURA reconsider the assignment of the FTM Storage
Working Group to the Green Bank and instead assign the working group to all the Program
Administrators, consistent with the approach established for the FTM Working Group pursuant to
Order No. 9 of the Docket No. 22-08-05 Final Decision. The items to be addressed in the FTM
Storage Tariff Report, appearing on Page 41 of the Proposed Final Decision, are ultimately issues
concerning the potential establishment of a new EDC tariff. For this reason, Eversource believes
it is critical that the EDCs, along with Green Bank, have the role of leading the FTM Storage
Working Group and preparing the FTM Storage Tariff Report. Eversource also notes that, once
the FTM Storage Working Group is established, it may be beneficial to engage a third-party
consultant to help facilitate and manage the process, as was done during the prior FTM Storage
Working Group process. The need for a consultant can be discussed during the initial FTM Storage
4
Proposed Final Decision at 28-29.
-3-
Working Group meetings and proposed to PURA by the Program Administrators at that time if
deemed advantageous by the Working Group members.
D.
Eversource Supports PURA’s Conclusions Regarding Hybrid Incentives
Eversource strongly supports PURA’s conclusion in the Proposed Final Decision regarding
hybrid incentives. Eversource fully supported PURA’s conclusion in the December 17, 2025 Final
Decision in Docket No. 25-08-05 to eliminate the Upfront Incentive associated with Passive
Dispatch compliance effective April 1, 2026. However, because incentive reservations continued
through March 31, 2026, more than 300 customers are expected to enter service under the legacy
Passive Dispatch construct and remain subject to its compliance obligations. The Company's
review of Passive Dispatch performance indicates while overall passive dispatch scores are
improving, there remains some original equipment manufacturers (“OEMs”) that continue to
experience difficulty satisfying the applicable compliance requirements, creating an ongoing risk
of customer clawbacks. For these reasons, Eversource strongly supports PURA's determination
that customers seeking to expand legacy energy storage systems should transition to Construct 5.
E.
The Due Date for the Order No. 16 Clawback Waivers Should Be Moved to
December 1, 2027 if Final Active Dispatch Incentive Amounts are Necessary
for PURA to Rule on the Motion
As discussed above, passive dispatch compliance remains an ongoing concern for legacy
passive dispatch customers, with approximately 277 customers remaining out of compliance at the
conclusion of the 2026 Passive Dispatch season. Order No. 16 in the Proposed Final Decision
states: "Program Administrators shall first apply any clawback fees against a project's eligible
performance incentive payments before pursuing direct collection from the customer." Based on
this proposed directive, Eversource is uncertain whether PURA is proposing to require the final
Active Dispatch incentive amounts to be included in the compliance Motion the PAs are directed
-4-
to make pursuant to Order No. 16 regarding clawback fee waivers, or whether the Green Bank's
estimated amounts are sufficient for purposes of this Motion.
If PURA requires the Order No. 16 Motion to include final Active Dispatch incentive
amounts, as calculated by the Distributed Energy Resource Management System (“DERMS”)
provider and subsequently validated by the EDCs, Eversource respectfully requests that the Order
No. 16 compliance date be extended From November 1 to December 1. The Active Dispatch
season concludes on September 30, and under its contract, EnergyHub is required to provide final
Active Dispatch performance data by November 15. An extension to December 1 would therefore
provide sufficient time for receipt and verification of the final performance data and would ensure
that PURA has visibility into final, rather than estimated, performance incentive amounts.
Conversely, if PURA determines that estimated Active Dispatch incentive amounts are
sufficient for purposes of ruling on the Motion, Eversource respectfully requests that the
November 1 filing date remain unchanged. Maintaining the existing filing date would provide
PURA additional time to adjudicate the Motion and would still allow customer Active Dispatch
performance incentive payments, less any applicable clawback fees, to be issued in December.
F.
Standing Order Nos. 3 and 4 Should Be Aligned
Following discussions with Customized Energy Solutions, the ESS Program’s Evaluation,
Measurement, and Verification (“EM&V”) vendor, Eversource recommends aligning the due
dates for Standing Orders Nos. 3 and 4 by applying the August 1, 2027, Annual Program Report
deadline in Order No. 3 to the ESS Program’s Three-year report in Order No. 4. Given the overlap
between the reports, including the evaluation of Program performance and updated benefit-cost
analyses, aligning the deadlines would reduce duplicative efforts and ensure alignment between
both reports.
-5-
Alignment on these orders is also important given the potential for updated Avoided
Energy Supply Cost (“AESC”) assumptions and counterfactuals that could materially affect the
Program’s benefit-cost analysis (“BCA”) results. Prior ESS evaluations demonstrated significant
changes in prospective BCA results following updates to the AESC, while the selection of AESC
counterfactuals can also materially affect reported cost-effectiveness.
III.
CONCLUSION
For all of the reasons provided above, Eversource requests that PURA revise the Proposed
Final Decision to incorporate its recommended changes and clarifications.
Respectfully submitted,
THE CONNECTICUT LIGHT AND POWER
COMPANY D/B/A EVERSOURCE ENERGY
By: Jennifer E. Galiette
Jennifer E. Galiette
Senior Counsel
Eversource Energy
P.O. Box 270
Hartford, CT 06141-0270
T: (860)-665-2598
E: [email removed]
Its Attorney
-6-
CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each person
designated on the official service list in this proceeding.
Dated at Berlin, Connecticut this 10th day of November 2026.
Jennifer E. Galiette
Jennifer E. Galiette
-7-