STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
DOCKET NO. 26-08-05
ANNUAL ENERGY STORAGE SOLUTIONS
PROGRAM REVIEW – YEAR 6
COMMENTS OF BASE POWER COMPANY
August 28, 2026
Base Power Company (“Base”) respectfully submits these comments in response to the
Public Utilities Regulatory Authority’s (“Authority” or “PURA”) August 12, 2026 Notice of
Request for Written Comments in the above-captioned Year 6 review of the Energy Storage
Solutions Program (“ESS Program” or “Program”). These comments address Item 1 of the
Notice, Recommended Programmatic Changes. Base takes no position in these comments on
Item 2, Bidirectional Electric Vehicle Participation.
I. Interest of Base Power Company
Base is preparing to enter Connecticut’s energy storage market as an Eligible Third-Party
Owner (“TPO”) under the ESS Program. Base has not yet commenced operations in Connecticut
but expects to do so imminently. Once active in the state, Base will own and operate
behind-the-meter battery energy storage systems (“BESS”) for residential customers.
Base is entering the Connecticut market because the ESS Program offers a clear,
well-designed incentive structure and a predictable, multi-year framework for Program
administration. That predictability, in both the Program’s rules and its incentive levels, is what
gives TPOs the confidence to invest in deploying storage in the state. Base commends the
Authority and the Program Administrators for that work, and offers the comments below on the
two aspects of the Program Administrators’ recommended changes most directly relevant to
Base’s planned participation as a TPO.
II. Recommended Programmatic Changes
Base supports the Program Administrators’ recommended changes addressed in Parts A
and B below and recommends the Authority approve them. Base raises a concern regarding a
separate proposed change, addressed in Part C, and requests that the Authority direct the
Program Administrators to clarify that provision before it is adopted. Base also offers two
additional recommendations, addressed in Parts D and E below: a fleet-level dispatch integration
pathway for BESS Operators that maintain their own dispatch platforms, and consistent
treatment of standalone residential storage under the budget framework of Section 4(a) of Public
Act No. 26-127. Base takes no position on the remaining recommended changes described in the
Notice.
A. The clarified default Performance Incentive payee for TPO-owned systems advances the
Program’s objectives.
The redlined Program Manual clarifies, in Section 6.6.3, that “[b]y default, Performance
Incentives are paid to the owner of the BESS, either the host customer or an Eligible Third-Party
System Owner (TPO),” and that “[e]ligible TPOs do not need to submit a Direct Payment
Beneficiary Form in order to receive Performance Incentives earned by their customers’ BESS,
as long as the Customer Agreement establishes that Performance Incentives are retained by the
TPO.” Program Manual Sec. 6.6.3. Base supports this change. Under the prior Manual language,
a TPO’s right to receive Performance Incentives on a customer’s BESS depended on a separately
submitted Direct Payment Beneficiary Form, an added filing step for every enrolled system, and
a point of failure if a form was delayed, lost, or completed incorrectly. Because a TPO’s
entitlement to Performance Incentives is already documented in the Customer Agreement, the
clarification removes a redundant filing requirement without reducing oversight.
B. The Authority should confirm that current Performance Incentive rate levels are not being
reduced.
Base’s review of the redlined Program Manual indicates that the recommended changes
do not reduce the underlying $/kW Performance Incentive rates in Section 6.6.2 for existing
customer categories. Base supports preserving the current incentive levels for existing rate tiers.
Predictable incentive levels are central to Base’s decision to enter the Connecticut market, and
remain central to the investment decisions TPOs and their capital providers make when
underwriting new projects. Base urges the Authority to confirm in its Year 6 decision that no
reduction to current Performance Incentive rate levels is being adopted in this proceeding, so that
TPOs and other Program participants can continue to rely on the Program’s existing incentive
structure.
Base takes no position in these comments on the Program Administrators’ related
recommendation to transition new enrollees from an annual/biannual payment election to
mandatory biannual (seasonal) payments, as that change concerns the timing of Performance
Incentive disbursements rather than the underlying incentive amount.
C. The new telemetry audit and penalty-fee provision (Sec. 5.1) should not be adopted without
materiality thresholds, a cure period, and an exemption for data gaps caused by the DERMS
or platform side.
The redlined Program Manual adds the following new sentence to Section 5.1
(Operational Control), which does not appear among the changes summarized in the Notice:
“Any entity providing telemetry data in the Program may be subject to audits and/or penalty fees,
if data is not provided in the allowable timeframe and/or if there are data QC concerns.” Program
Manual Sec. 5.1.
The Program Manual already addresses missing or late telemetry data through the Performance
Incentive calculation itself: Section 6.3 provides that “[l]apses in service that result in missing
data during an event will result in performance being measured at 0 kW-AC for the duration of
the missing data.” Because a data gap already reduces the Performance Incentive earned for the
affected interval, layering an additional audit and penalty-fee exposure on top of that reduction
risks penalizing the same shortfall twice.
As drafted, the new sentence does not define what data delay or what category of “QC
concern” would trigger an audit or penalty fee, does not specify a fee amount or schedule, and
does not provide a cure period before a penalty is assessed. Nor does it distinguish a telemetry
provider’s own failure from a data gap caused by the DERMS platform or another Program
Administrator system that is outside the telemetry provider’s control. Base requests that, before
this provision is adopted, the Authority direct the Program Administrators to specify: (i) a
materiality threshold defining the delay or QC failure that triggers exposure to an audit or
penalty fee; (ii) a reasonable cure period allowing a telemetry provider to correct a deficiency
before a penalty is assessed; and (iii) an explicit exemption where the data gap originates on the
DERMS or Program Administrator platform side rather than with the telemetry provider. Base
does not object to reasonable accountability for data quality. Base’s concern is that, without these
clarifications, the provision introduces an open-ended compliance risk for TPOs, Operators, and
Aggregators.
D. The Program rules should establish a pathway for fleet-level dispatch integration for BESS
Operators.
The Program’s design already frames Active Dispatch at the Operator level. Section 5.1.2
of the Program Manual provides that “the EDCs will provide notification to the BESS Operator
via the DERMS at least 24 hours in advance of the start of the Active Dispatch event,” and that
“BESS Operators will be provided with the requested discharge level for the event. Actual
performance will be verified based on data captured by the Customer’s Operator and reported
back to the DERMS.” Program Manual Sec. 5.1.2. In practice, however, the Program’s current
DERMS implementation anticipates a direct, device-level control connection to each enrolled
BESS.
Many BESS Operators and Aggregators already maintain their own distributed dispatch
platforms through which they centrally control their fleets: the Operator receives a dispatch
instruction, executes it across every enrolled device, and captures device-level telemetry in the
process. For these fleets, a device-level control connection duplicates a control layer the
Operator already provides and imposes a per-device integration burden on every enrollment,
without yielding incremental grid or verification benefit, because performance is measured from
device-level telemetry in either architecture. Base recognizes that not every aggregator maintains
this capability, and a direct device-level connection through a centralized DERMs remains the
appropriate default for those that do not.
Base requests that the Authority direct the Program Administrators to codify a fleet-level
integration option in the Program Manual and associated implementation rules. Specifically, the
Program Manual should provide that an Eligible BESS Operator or Aggregator may elect to
satisfy the Program’s dispatch requirements through a fleet-level integration in which (i) the
Active Dispatch event — the event window, duration, and requested discharge level — is
communicated to the Operator; (ii) the Operator executes the event across its enrolled BESS; and
(iii) the Operator reports telemetry for its portfolio for performance measurement and incentive
verification. This structure preserves the EDCs’ full control over when, where, and how much
capacity is dispatched, preserves device-level measurement for settlement, and leaves the
existing device-level connection in place for aggregators that do not operate their own dispatch
platforms.
E. Standalone residential storage should receive equivalent treatment under the Section 4(a)
budget framework, and no minimum size requirement should attach to the solar component of
a paired system.
Section 4(a) of Public Act No. 26-127 establishes a combined annual target of 180
megawatts and $85 million per year, beginning January 1, 2028, across the residential clean
energy successor programs and the storage program established at General Statutes § 16-243ee,
and excludes from those targets residential solar photovoltaic systems paired with co-located
storage that are shown, through a ratepayer impact measurement (“RIM”) test developed by the
Authority, to benefit all ratepayers. Standalone residential storage receives no equivalent
treatment. Base has addressed this disparity in its comments in Docket No. 26-06-04, filed
August 26, 2026, which Base incorporates by reference. Base raises the issue in this Year 6
review as well because enrollment and budget decisions made in this proceeding will set the ESS
Program’s trajectory into the period in which the Section 4(a) budgetary target begins to bind,
and because the Authority’s allocation determinations under Section 4(a) are due by December 1,
2027.
A carve-out conditioned on solar pairing confines the Act’s uncapped deployment
pathway to the subset of ratepayers whose homes can host a full rooftop solar array. Roof
orientation, shading, structural condition, and roof age exclude a meaningful share of
Connecticut homes from rooftop solar altogether. A standalone battery — or a battery paired
with a small, battery-attached solar module — can be sited at many more homes at materially
lower installed cost and complexity. If the purpose of the Section 4(a) framework is to ensure
that ratepayer-funded programs deliver benefits across the rate base, eligibility rules should
maximize the portion of the rate base that can practically participate. At minimum, the Authority
should decline to adopt any minimum size requirement for the solar component of a paired
system, so that a small battery-attached array qualifies a system for the carve-out on the same
terms as a full rooftop installation.
Stand alone storage does not only deliver accessibility benefits. Now, the form factor of
stand alone storage can provide meaningful resiliency without solar. . The historical premise for
favoring paired systems — that a standalone battery exhausts its charge during an extended
outage while a paired system can recharge from co-located generation — reflects the small
standalone form factors, typically five to ten kilowatt-hours, that were common when that
framework was developed. Newer standalone form factors are materially larger: the systems
Base deploys are 40 kWh, roughly four times the typical size, and provide multiple days of
backup power for a typical residential load. In Base’s Texas fleet, which experiences more
frequent and longer-duration outages than Connecticut, systems of this class have provided
coverage across the overwhelming majority of outage events. The Program’s own storm protocol
reinforces this: under Section 6.9, the EDCs cancel dispatch events for the two days preceding
any predicted Emergency Restoration Plan-level event, so standalone systems enter major storms
fully charged and reserved for the customer’s use.
Standalone storage also carries a demonstrated, positive ratepayer impact. The Program’s
most recent evaluation results report a RIM ratio of 1.69, exceeding the Program’s
greater-than-1.4 design target. See Decision, Docket No. 25-08-05 (Dec. 17, 2025) at 30. A RIM
ratio above 1.0 means that non-participating ratepayers are net beneficiaries of each incentive
dollar — precisely the criterion on which the Act’s carve-out turns. The Connecticut Green Bank
has itself proposed a technology-neutral, RIM-based exclusion from the budget cap. In the
Authority's successor program study, the Connecticut Green Bank "suggested that the Authority
could consider exempting combined solar and storage systems and other projects that deliver
ratepayer benefits (with a RIM score greater than 1) from the budget cap." Final Report,
Docket No. 25-02-14, at 70 (citing CGB Comments, Feb. 4, 2026, p. 3). Standalone residential
storage with a demonstrated RIM score greater than 1 is such a project. Applying the Authority’s
RIM test to standalone residential storage on the same terms as paired systems would keep
demonstrated ratepayer benefit, rather than technology type, as the basis for what counts against
the cap.
Base therefore requests that the Authority, in its Year 6 decision, record its support for
technology-consistent treatment under Section 4(a): standalone residential storage systems
participating in the program at General Statutes § 16-243ee that satisfy the Authority’s RIM test
should be excluded from the Section 4(a) megawatt and budgetary targets on the same terms as
paired solar-plus-storage systems, and, at minimum, no minimum solar system size requirement
should be imposed as a condition of the existing paired-system carve-out.
III. Conclusion
Base thanks the Authority and the Program Administrators for their continued
stewardship of the ESS Program and respectfully requests that the Authority consider the
comments above in its Year 6 decision.
Respectfully submitted,
BASE POWER COMPANY
Tori Villarreal
Base Power Company
August 28, 2026