Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Answers to questions 1 thru 11

Interrogatory responses

Filed by UI

Part of

Non-Wires Solutions Process Cycle 2

Type of filing
Response (Interrogatory responses)
Date filed
April 2, 2026
Filed by
UI
Files
13

As listed on the current system

Question(s) Answered 1 thru 11 (UI) Date Filed: 04/02/2026

This filing on the current system (opens in a new tab)

Files13

PMUI-001 The United Illuminating Company Witness: Maritza Estremera Jimenez Bruno Fernandes Docket No. 26-08-08 Page 1 of 1 Date Submitted: April 2, 2026 PMUI-001 Q: Please confirm if the Annual Grid Needs Filing (Appendix 6) in this and future process cycles only includes grid needs that were identified after the Annual Grid Needs Filing in the prior process cycle. If no, please describe what this filing represents. PMUI-001 A: As stated in UI’s Final Exhibit 1- Docket No. 26-08-08- UI NWS Annual Filing, “The Grid Needs Filing is a five (5) year summary of UI’s distribution projects that are developed annually with the purpose of identifying possible system needs that could be addressed by an NWS in a more cost-effective manner than traditional “wires” solutions. The Grid Needs Filing is a forwardlooking project list for projects above $500,000.” Therefore, all the projects in UI’s Cycle 2 Annual Grid Needs filing are new projects that have been technically scrutinized and are required to be inservice within the next 5 years.