Motion No. 005Filed by CL&P dba Eversource Energy
protected and confidential attachments
- Type of filing
- Motion (Motion No. 005)
- Date filed
- March 31, 2026
- Filed by
- CL&P dba Eversource Energy
- Files
- 2
As listed on the current system: Motion No. 005 03/31/2026 (CL&P dba Eversource Energy) - protected and confidential attachments [26-08-08]
Files
Docket No. 26-08-08 - PURA Set 1 MPO Affidavit.pdf
PDF · 120 KB · 1 pageText searchable
Download Docket No. 26-08-08 - PURA Set 1 MPO Affidavit.pdfRead the text of Docket No. 26-08-08 - PURA Set 1 MPO Affidavit.pdf
Docket No. 26-08-08 - PURA Set 1 MPO.pdf
PDF · 127 KB · 6 pagesText searchable
Download Docket No. 26-08-08 - PURA Set 1 MPO.pdfRead the text of Docket No. 26-08-08 - PURA Set 1 MPO.pdf
Text of Docket No. 26-08-08 - PURA Set 1 MPO Affidavit.pdf
Extracted from the file · 1,538 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
NON-WIRES SOLUTIONS PROCESS CYCLE 2
:
:
:
DOCKET NO. 26-08-08
MARCH 31, 2026
AFFIDAVIT OF LAVELLE A. FREEMAN
I am over the age of eighteen and understand the obligations of making statements under
oath. The following statements are true to the best of my knowledge and belief:
1. I am Vice President, Distribution System Planning for Eversource Energy Service
Company ("Eversource").
2. I submit this affidavit in support of a Motion for Protective Order, of even date herewith
(“Motion”), as it relates to the Confidential Information (as defined in the Motion),
which consists of one-line diagrams, alternative solutions, proposed locations of
projects, numbers in the text related to the number of critical customers served by a
circuit, the length of a circuit, outage data associated with a particular circuit, and
proposed reliability information for specific circuits; as well as summaries of pricing
information from various bidders.
3. Upon information and belief, this information has not been publicly disclosed or is not
known or readily available to the public, and Eversource takes steps to maintain such
information as confidential.
4. I have been advised by Eversource’s legal counsel that neither federal nor Connecticut
statutes require that the Confidential Information be filed in the public record.
Lavelle A. Freeman
Subscribed and sworn before me this
31st day of March 2026.
Eric Eggleston
Eric Eggleston
CT Juris No. 434692
Virtually Acknowledged
1
Text of Docket No. 26-08-08 - PURA Set 1 MPO.pdf
Extracted from the file · 8,732 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
NON-WIRES SOLUTIONS PROCESS
CYCLE 2
:
:
:
:
:
DOCKET NO. 26-08-08
MARCH 31, 2026
MOTION OF THE CONNECTICUT LIGHT AND POWER COMPANY
D/B/A EVERSOURCE ENERGY FOR PROTECTIVE ORDER
The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource” or the
“Company”) hereby moves that the Public Utilities Regulatory Authority (“PURA”) grant
protective treatment as described in this motion to ensure that certain confidential information
provided by the Company in the above-referenced proceeding is not subject to public disclosure,
pursuant to the Protective Order submitted to PURA on February 24, 2006. As outlined below,
certain information provided by the Company in response to interrogatories issued by PURA’s
Reliability, Security, Resiliency (“RSR”) Unit on March 10, 2026 (“RSR Set 1”)1 contain
confidential design and pricing information, which the Company does not disclose publicly.
Specifically, the Company requests that the following attachments be protected from public
disclosure: Attachments 1 and 2 to Q-RSR-004, Attachment 1 to Q-RSR-005, Attachment 1 to QRSR-011, and Attachments 1, 2a, 2b, and 3 to Q-RSR-012 and Q-RSR-013 (the “Confidential
Design Attachments”); Attachments 2 and 3 to Q-RSR-011 (the “Confidential Pricing
Attachments”); and Attachment 1 to Q-RSR-003 (together with the Confidential Design
1
The Company submitted a Motion for Extension of Time for RSR Set 1 on March 18, 2026 (“Motion No.
3”) requesting an extension until March 31, 2026. PURA granted Motion No. 3 on March 23, 2026.
Attachments and the Confidential Pricing Attachments, the “Confidential Information”). In
support of this motion, the Company states as follows:
1.
The Confidential Design Attachments contain one-line diagrams, alternative
solutions, proposed locations of projects, numbers in the text related to the number of critical
customers served by a circuit, the length of a circuit, outage data associated with a particular
circuit, and proposed reliability information for specific circuits. The Confidential Design
Attachments show the existing and proposed future configuration of the Company’s backbone of
distribution circuits, with detailed engineering information about proposed and existing critical
infrastructure, depicting and describing device locations with specificity.
2.
Publicly disclosing the specific, detailed engineering and design information
contained in the Confidential Design Attachments would compromise the safety and security of
the electric system if that information fell into the hands of a bad actor (such as a terrorist or
another nation state) that intended to use the confidential information for harmful purposes. This
information could be useful to a person planning an attack on the Company’s critical infrastructure.
Specifically, this information can be used for cyberattacks on the Company’s critical infrastructure
or for personal attacks on specific customers or critical facilities served by this infrastructure. The
Confidential Design Attachments therefore constitute CEII as defined by FERC2 and must be
protected from public disclosure. Conn. Gen. Stat. § 1-210(b)(19) exempts from public disclosure
such CEII information stating that there is an exemption for “[r]ecords when there are reasonable
grounds to believe disclosure may result in a safety risk, including the risk of harm to any person,
2
CEII is “specific engineering, vulnerability, or detailed design information about proposed or existing critical
infrastructure that: (i) relates details about the production, generation, transportation, transmission, or distribution of
energy; (ii) could be useful to a person in planning an attack on critical infrastructure; (iii) is exempt from
mandatory disclosure under the Freedom of Information Act; and (iv) does not simply give the general location of
the critical infrastructure.” 18 C.F.R. § 388.113.
2
any government-owned or leased institution or facility”; and § 1-210(b)(19) defines “governmentowned or leased institution or facility” as including a “facility owned or leased by a public service
company, as defined in section 16-1”.
3.
Pursuant to Conn. Gen. Stat. § 1-210(b)(5), PURA is authorized to protect from
public disclosure both “trade secrets” and “[c]ommercial and financial information given in
confidence, not required by statute.” Trade secrets include information that would “(i) derives
independent economic value, actual or potential, from not being generally known to, and not being
readily ascertainable by proper means by other persons who can obtain economic value from its
disclosure or use, and (ii) is the subject of efforts that are reasonable under the circumstances to
maintain its secrecy.” Conn. Gen. Stat. § 1-210(b)(5)(A).
4.
The Confidential Pricing Attachments contain summaries of pricing information
from various bidders, used to develop the Company’s cost estimate for energy storage capacity
used in the Company’s initial filings in this Docket. The Confidential Pricing Attachments
constitute trade secrets. There is actual independent economic value in vendor pricing and the
results of the Company’s Request for Information not being known to, or not being readily
ascertainable by, CL&P’s current and prospective vendors, the competitors of these particular
vendors, and the general public. This information is also the subject of efforts by the Company
that are reasonable under the circumstances to maintain the secrecy of such information. The
Company’s potential bidders should not have access to past bid amounts because it would provide
a significant advantage in the solicitation process, potentially skewing the results and contents of
proposals. By maintaining pricing information as confidential, the Company is assured that
potential bidder proposals are based on the market and the bidder’s qualifications, not previous
vendor responses.
3
5.
PURA is also authorized to protect from public disclosure “[c]ommercial and
financial information given in confidence, not required by statute.” Conn. Gen. Stat. § 1210(b)(5)(B). The information in the Confidential Information is commercial and/or financial
information; it is given to PURA in confidence, and the disclosure is not a result of any statutory
requirement.
For the reasons described above, the information in the Confidential Design
Attachments and the Confidential Pricing Attachments also qualifies as commercial or financial
information given in confidence, not required by statute, and therefore should be exempt from
disclosure.
6.
Q-RSR-003, Attachment 1 Confidential responds to a question from RSR based on
System Data Requirement No. 9 of the Company’s February 6, 2026 annual filing. The data
pertaining to System Data Requirement No. 9 have already been approved as a confidential filing
by PURA in Exhibit A to its December 18, 2024 Final Decision in Docket No. 24-08-08, NonWires Solutions Process Initiation Phase. Because the Company’s response to RSR-003 provides
additional detail to this confidential filing, the response should also be protected under the same
provision in Docket No. 24-08-08.
7.
The Office of Consumer Counsel and the Department of Energy & Environmental
Protection shall have access to the Confidential Information based on the terms of the Protective
Order submitted to PURA on February 6, 2026.
8.
Neither federal law nor Connecticut statutes require that the Company submit the
Confidential Information. In this case, the necessity of withholding public disclosure of the
Confidential Information outweighs the public interest in such disclosure.
4
9.
Attached in support of this motion is the Affidavit of Lavelle A. Freeman, Vice
President of Distribution System Planning for Eversource Energy Service Company. The affidavit
addresses the need for protective treatment of the Confidential Information described in this
motion.
10.
For the above reasons, the Company respectfully requests that PURA grant this
motion for protective order.
RESPECTFULLY SUBMITTED,
THE CONNECTICUT LIGHT AND POWER
COMPANY d/b/a EVERSOURCE ENERGY
By: Vincent P. Pace
Vincent P. Pace
Eric Eggleston
Eversource Energy
P.O. Box 270
Hartford, CT 06410-0270
Phone: [phone removed]
Fax: [phone removed]
[email removed]
[email removed]
Its Attorneys
5
CERTIFICATION
I hereby certify that on March 31, 2026, a copy of the foregoing was sent to the Public
Utilities Regulatory Authority, the Office of Consumer Counsel, and to the official service list in
this proceeding in Compliance with Conn. Regs. §16-1-15, as amended.
Eric Eggleston
Eric Eggleston
Commissioner of the Superior Court
6