A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
CorrespondenceFiled by Christopher Tralli

Budget Submittal

Part of

Docket 26-09-01Open

Call Before You Dig - Proposed Budget for 2027

Type of filing
Correspondence
Date filed
October 29, 2026
Filed by
Christopher Tralli
Files
4
As listed on the current system: Corres. 10/29/2026 [26-09-01] (Christopher Tralli) - Budget Submittal

This filing on the current system (opens in a new tab)

Files

Text of 2027 CBYD Budget Cover Letter - Final.docx

Extracted from the file · 6,318 characters
October 28, 2026 Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket # 26-09-01 Call Before You Dig, Inc. – Proposed Budget for 2027 Dear Mr. Gaudiosi: Per the referenced Docket, please find attached the proposed 2027 Budget for Call Before You Dig, Inc. (CBYD Inc.). Also enclosed is a copy of CBYD, Inc. Auditor’s Report for the Year Ending 2025 (Exhibit “B”) and the CBYD, Inc. 2025 Annual Report (Exhibit “C”). The 2027 proposed budget is submitted for approval in accordance with Section 16-345-2(d) of the Authority’s regulations regarding excavation near underground facilities. The budget represents the funding necessary to operate the central clearinghouse and efficiently perform the duties required of CBYD Inc. by the Authority. The proposed 2027 total operating budget of $2,887,964 represents a total increase of 2.1 % in operating expenses over the previous year’s (2026) budget of $2,828,925. The monthly mileage rate for member utilities is proposed to remain at $4.45 per mile in 2027, as are all of the other rates shown on page 4 of Exhibit “A”, for next year. CBYD entered into a five-year contract with PelicanCorp One Call, Inc. in December 2023. This contract commenced on January 1, 2024 and expires on December 31, 2028. Next year will be the fourth year of that agreement. The five-year agreement includes many existing base contract services PelicanCorp has traditionally provided to CBYD, along with additional services related to digital marketing, website support/maintenance, Damage Access support/maintenance, Education Access support/maintenance, Design and Survey support/maintenance and other licensing and hosting fees associated with current programs in effect by CBYD. CBYD and PelicanCorp have been partners since 2013 in Connecticut. These collaborative efforts have resulted in many upgrades and enhancements to our systems that provide efficiencies for our stakeholders and end users throughout the state, ultimately advancing our mission of public safety through safe excavation best practices. CBYD Inc. has completed the move of our facilities to a new location in Cheshire. The new location, centrally located in the state, allows us to be more accessible for the events and programs we host. The new facility has given CBYD Inc. the opportunity to configure our building space to better serve the public well into the future. The new facility also has ample space for expansion and growth should that be required in the years ahead. The construction of a new training and outreach center gives us the ability to host training and educational sessions for up to 40+ participants. State of the art monitors and acoustics enhance the experience for folks who attend the sessions. A large outdoor storage garage was constructed to house the CBYD Inc. event truck and trailer. The additional storage space is also welcome and needed. The Operations Committee has done a tremendous job managing the new location construction that will benefit everyone who relies on CBYD Inc. for valuable training and education. Finalizing the building construction and upgrades as well as CBYD Inc.’s new long term facility lease affords the organization the opportunity to move forward with laser focus on advancing the mission promoting safe excavation practices. Collectively, the Damage Prevention and Education Committee will continue to work with our partners at PURA and PelicanCorp to provide the best Call Center experience. As part of that effort the CBYD Inc. website will get a much-needed remodel, complete with alternative language options. The primary, targeted focus of our efforts will always be CBYD Inc.’s core mission of providing communication and education to improve safety for those excavating. CBYD, Inc. would like to highlight several areas of the proposed 2027 budget that will have significant changes (+/-) over last year’s (2026) budget: The decrease in Expense Account Line Items #421 (PelicanCorp Contract) is a result of two main items. First, the five-year PelicanCorp contract with CBYD, Inc., which was approved by the CBYD Board of Directors in December 2023 has a built-in increase of 1.3%, or approximately $20,400 for the upcoming year. Secondly, the office move to Cheshire from Hamden earlier this year, will result in a savings of approximately $92,600 in facility related expenses that PelicanCorp had been paying for at the Hamden location, and within this line item. The increase in Expense Account Line Item #470 (Public Awareness and Education) is a result of proposed additional outreach and training programs that are planned for 2027 to address areas of concern identified by the Board of Directors. These efforts will include regional excavator training sessions throughout the state, Staking University training for utility mark-out personnel, programs to mitigate “No-Notice” excavator damages, sponsorships at local events, and digital TV and radio advertising. The increase in Expense Account Line Item #600 (Insurance) and #700 (Personal Property Tax) is a result of the increasing premium rates for the three main insurance policies that CBYD carries for risk protection. Also, expected increased costs in these line items are associated with the recent purchase of new office furniture and equipment related to our training center at our new location in Cheshire. The new Expense Account Line Items #650 (Office Lease), #652 (Office Utilities) and #654 (Office Maintenance) is a result of CBYD, Inc being directly responsible for the lease of our call center facilities. Office utilities such as electric, natural gas, cable/internet and general maintenance etc. will now be the responsibility of CBYD Inc. going forward. The Board of Directors of Call Before You Dig, Inc. offers the proposed budget and documentation with full commitment to meet the regulations and directives of the Public Utilities Regulatory Authority. We request that the Authority consider this submittal and grant the necessary approvals for the proposed 2027 budget (see Exhibit “A” for details). If you have any questions regarding this submittal, please do not hesitate to contact me. Respectfully submitted, Christopher J. Tralli, President