CorrespondenceFiled by Christopher Tralli
Please amend the address and service address to 416 Highland Ave., Suite B1 Cheshire, CT 06410
- Type of filing
- Correspondence
- Date filed
- October 30, 2026
- Filed by
- Christopher Tralli
- Files
- 1
As listed on the current system: Corres. 10/30/2026 [26-09-01] (Christopher Tralli) - Please amend the address and service address to 416 Highland Ave., Suite B1
Cheshire, CT 06410
Files
2026 CBYD Budget Cover Letter - Final.docx
Word · 81 KBText searchable
Download 2026 CBYD Budget Cover Letter - Final.docxRead the text of 2026 CBYD Budget Cover Letter - Final.docx
Text of 2026 CBYD Budget Cover Letter - Final.docx
Extracted from the file · 6,886 characters
October 30, 2025
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, CT 06051
Re: Docket # 25-09-01
Call Before You Dig, Inc. – Proposed Budget for 2026
Dear Mr. Gaudiosi:
Per the referenced Docket, please find attached the proposed 2026 Budget for Call Before You Dig, Inc. (CBYD Inc.). Also enclosed is a copy of CBYD Inc. Auditor’s Report for the Year Ending 2024 (Exhibit “B”) and the CBYD Inc. 2024 Annual Report (Exhibit “C”).
The 2026 proposed budget is submitted for approval in accordance with Section 16-345-2(d) of the Authority’s regulations regarding excavation near underground facilities. The budget represents the funding necessary to operate the central clearinghouse and efficiently perform the duties required of CBYD Inc. by the Authority. The proposed 2026 total operating budget of $2,828,925 represents a total increase of 2.4 % in operating expenses over the previous year’s (2025) budget of $2,762,740. The monthly mileage rate for member utilities, is proposed to be increased to $4.45 per mile in 2026, an increase of 2.3% from last year’s rate of $4.35 per mile. This will be the first rate increase since 2022 for CBYD member utilities on any of our billable rates. All of the other rates, as shown on page 4 of Exhibit “A”, are proposed to remain the same for 2026.
CBYD Inc. entered into a five-year contract with PelicanCorp One Call, Inc. in December 2023. This contract commenced on January 1, 2024 and expires on December 31, 2028. This negotiated agreement included holding the total contract cost for fiscal year 2024 in place from the previous five-year agreement that was approved in 2019, and covered years 2020 through 2024. The five-year agreement included many existing base contract services PelicanCorp has traditionally provided to CBYD, along with additional services related to digital marketing, website support/maintenance, Damage Access support/maintenance, Education Access support/maintenance, Design and Survey support/maintenance and other licensing and hosting fees associated with current programs in effect by CBYD. CBYD and PelicanCorp have been working collaboratively together since 2013. These collaborative efforts have resulted in many upgrades and enhancements to our systems that provide efficiencies for our stakeholders and end users throughout the state, ultimately advancing our mission of public safety through safe excavation best practices.
CBYD Inc. has embarked on a exciting venture in 2025. We are in the process of moving our offices and Call Center to a new location in Cheshire which is more centralized in the state. The relocation offers CBYD Inc. the opportunity to configure our building space to suit our needs well into the future. With the acquisition of our event trailer and vehicle it became necessary to have a safe, secure place to house these valuable assets. Our new location offered the addition of a garage space for vehicle and trailer storage, as well as miscellaneous storage space for various educational items, etc.
The Operations Committee has taken the lead designing and overseeing construction of a state of the art training and resource center that will allow our outreach team to provide training and educational sessions on-site to the excavating community, first responders and the public we serve.
Collectively, the Damage Prevention and Education Committee will continue to work with our partners at PURA and PelicanCorp to evaluate our effectiveness by disseminating damage data, reaching all our stakeholders, and finding ways to continually improve the performance of our programs. The constant, consistent and targeted focus of our efforts are aligned with the core CBYD Inc. mission of providing communication and education to improve safety for those excavating.
CBYD Inc. would like to highlight several areas of the proposed 2026 budget that will have significant changes (+/-) over last year’s (2025) budget:
The increase in Expense Account Line Items #421 (PelicanCorp Contract) is a result of the five-year PelicanCorp contract with CBYD, Inc., which was approved by the CBYD Board of Directors in December 2023. Next year (2026) will be the third year of this agreement, and the rates for PelicanCorp to operate the day-to-day operations at the call center is scheduled to increase by 1.3 percent for the upcoming year.
The decrease in Expense Account Line Item #425 and Revenue Line Item #350 (Digitizing Service) is a result of recent upgrades to the OneCall system, which now allows member utilities to transfer updated mapping files directly through new user software. Previously, self-uploads weren’t possible through our previous mapping provider and additional steps, along with costs, were incurred whenever member utilities revised their service areas.
The decrease in Expense Account Line Item #450 (Telephone Network) is a result of the recent change to a new telephone provider at the call center along with less usage of the 1-800 number by excavators who have switched over to the e-ticket option.
The increase in Expense Account Line Item #480 (Scholastic Award ) is a result of planned additional funds to include an awards presentation and recognition event in 2026. This event is intended to recognize the award recipients, their families and schools and to promote their achievements within the Connecticut Technical Education and Career Systems (CTECS) program. For 2025 there were eighteen (18) awards through fifteen (15) of the technical schools represented by CTECS. For 2026 the committee will continue the awards distribution to one (1) student, selected by the school administration, for each of the eighteen schools. The awards will be in the amount of $811 for each student. The remainder of the money budgeted will be used for a presentation and recognition event, promotional materials and social media for the Scholastic Awards program.
The increase in Expense Account Line Item #600 (Insurance) and #700 (Personal Property Tax) is a result of the increasing premium rates for the three main insurance policies that CBYD carries for risk protection. Also, expected increased costs in these line items are associated with the purchase of a new vehicle in 2025 by CBYD Inc., to be used to haul the events trailer throughout the state, as needed.
The Board of Directors of Call Before You Dig, Inc. offers the proposed budget and documentation with full commitment to meet the regulations and directives of the Public Utilities Regulatory Authority. We request that the Authority consider this submittal and grant the necessary approvals for the proposed 2026 budget (see Exhibit “A” for details).
If you have any questions regarding this submittal, please do not hesitate to contact me.
Very truly yours,
Christopher J. Tralli, President