A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Draft decisionFiled

Draft Decision

Part of

Docket 26-09-12Closed

Application of Green Mountain Power Corporation for Qualification of Rollinsford Hydro, Salmon Falls River, Rollinsford, NH as a Class I Renewable Energy Source

Type of filing
Draft decision (Draft Decision)
Date filed
October 21, 2026
Filed by
Not recorded
Files
1
As listed on the current system: Draft Decision, 10/21/2026 [26-09-12]

This filing on the current system (opens in a new tab)

Files

Text of df260912.pdf

Extracted from the file · 4,930 characters
STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY TEN FRANKLIN SQUARE NEW BRITAIN, CT 06051 DOCKET NO. 26-09-12 APPLICATION OF GREEN MOUNTAIN POWER CORPORATION FOR QUALIFICATION OF ROLLINSFORD HYDRO, SALMON FALLS RIVER, ROLLINSFORD, NH AS A CLASS I RENEWABLE ENERGY SOURCE October 21, 2026 By the following Commissioners: Thomas H. Wiehl David Arconti, Jr. Janice A. Beecher Holly H. Cheeseman Everett Smith, III PROPOSED FINAL DECISION This proposed final Decision is being distributed to the parties in this proceeding for comment. The proposed Decision is not final. The Authority will consider the parties’ arguments and exceptions before reaching a final Decision, which may differ from the proposed Decision. Therefore, this proposed Decision does not establish any precedent and does not necessarily represent the Authority’s final conclusion. PROPOSED FINAL DECISION I. INTRODUCTION A. SUMMARY In this Decision, the Public Utilities Regulatory Authority determines that the Rollinsford hydropower generation facility located at Salmon Falls River in Rollinsford, New Hampshire qualifies as a Class I renewable energy source. B. BACKGROUND OF THE PROCEEDING By Application received September 22, 2026 (Application), Green Mountain Power Corporation (Company/Applicant) requests that the Public Utilities Regulatory Authority (Authority) determine that the Rollinsford hydropower generation facility (Rollinsford or Project) qualifies as a Class I renewable energy source. C. CONDUCT OF THE PROCEEDING There is no statutory requirement for a hearing, no person requested a hearing, and none was held. D. PARTICIPANTS The Authority recognized the following as Participants to this proceeding: Green Mountain Power Corporation, 163 Acorn Lane, Colchester, VT 05404; the Office of Consumer Counsel, Ten Franklin Square, New Britain, CT 06051; and the Commissioner of the Department of Energy and Environmental Protection, 79 Elm Street, Hartford, CT 06106. II. STANDARD REVIEW Pursuant to General Statutes § 16-1(a)(20), “Class I renewable energy source” includes energy derived from a run-of-river hydropower facility that received a new license after January 1, 2018, has a generating capacity of not more than 60 megawatts, is not based on a new dam or a dam identified as a candidate for removal, and meets applicable state and federal requirements, including state dam safety requirements and applicable site-specific standards for water quality and fish passage. III. AUTHORITY ANALYSIS As provided in the Application, Rollinsford generates electricity using hydropower. The Project is located on the Salmon Falls River, Rollinsford, New Hampshire. Rollinsford originally began commercial operation on September 1, 1981, and received an Order Issuing Subsequent License from FERC on June 16, 2022 (Subsequent License). The Docket No. 26-09-12 Page 2 Subsequent License requires the Project to operate in a run-of-river mode whereby outflow to the project always equals inflow. Rollinsford has an installed capacity of 1.5 MW. The Project's NEPOOL GIS Identification Number is MSS906. Rollinsford is a grid-connected generation facility located in New Hampshire, which is within the control area of the ISO-NE. According to its Subsequent License, the Project is not based on a new dam or a dam identified as a candidate for removal. Rollinsford meets all applicable requirements, including state dam safety requirements and applicable site-specific standards for water quality and fish passage. IV. CONCLUSION The Authority reviewed all information in the record and finds that pursuant to General Statutes § 16-1(a)(20), the Facility qualifies as a Class I renewable energy source, effective July 1, 2026. The Authority assigns the Facility Connecticut Renewable Portfolio Standard Registration No. CT260912. The Authority’s determination in this docket is based on the information submitted by the Company. The Authority may reverse its ruling or revoke the Company’s registration if any material information provided proves to be false or misleading. The Company is reminded that it is obligated to notify the Authority within 10 days of any changes to any of the information it has provided. DOCKET NO. 26-09-12 APPLICATION OF GREEN MOUNTAIN POWER CORPORATION FOR QUALIFICATION OF ROLLINSFORD HYDRO, SALMON FALLS RIVER, ROLLINSFORD, NH AS A CLASS I RENEWABLE ENERGY SOURCE This Decision is adopted by the following Commissioners: Thomas H. Wiehl David Arconti, Jr. Holly H. Cheeseman Everett Smith, III Janice A. Beecher CERTIFICATE OF SERVICE The foregoing is a true and correct copy of the Decision issued by the Public Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail to all parties of record in this proceeding on the date indicated. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority Date