DecisionFiled
Final Decision
Part of
Docket 26-09-12Closed
Application of Green Mountain Power Corporation for Qualification of Rollinsford Hydro, Salmon Falls River, Rollinsford, NH as a Class I Renewable Energy Source
- Type of filing
- Decision (Final Decision)
- Date filed
- October 28, 2026
- Filed by
- Not recorded
- Files
- 1
As listed on the current system: Final Decision, 10/28/2026 [26-09-12]
Files
260912-102826.pdf
PDF · 170 KB · 4 pagesText searchable
Download 260912-102826.pdfRead the text of 260912-102826.pdf
Text of 260912-102826.pdf
Extracted from the file · 4,504 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-09-12
APPLICATION OF GREEN MOUNTAIN POWER
CORPORATION
FOR
QUALIFICATION
OF
ROLLINSFORD HYDRO, SALMON FALLS RIVER,
ROLLINSFORD, NH AS A CLASS I RENEWABLE
ENERGY SOURCE
October 28, 2026
By the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Janice A. Beecher
Holly H. Cheeseman
Everett Smith, III
DECISION
DECISION
I.
INTRODUCTION
A.
SUMMARY
In this Decision, the Public Utilities Regulatory Authority determines that the
Rollinsford hydropower generation facility located on Salmon Falls River in Rollinsford,
New Hampshire qualifies as a Class I renewable energy source.
B.
BACKGROUND OF THE PROCEEDING
By Application received September 22, 2026 (Application), Green Mountain
Power Corporation (Company/Applicant) requests that the Public Utilities Regulatory
Authority (Authority) determine that the Rollinsford hydropower generation facility
(Rollinsford or Project) qualifies as a Class I renewable energy source.
C.
CONDUCT OF THE PROCEEDING
There is no statutory requirement for a hearing, no person requested a hearing,
and none was held.
D.
PARTICIPANTS
The Authority recognized the following as Participants to this proceeding: Green
Mountain Power Corporation, 163 Acorn Lane, Colchester, VT 05404; the Office of
Consumer Counsel, Ten Franklin Square, New Britain, CT 06051; and the
Commissioner of the Department of Energy and Environmental Protection, 79 Elm
Street, Hartford, CT 06106.
II.
STANDARD REVIEW
Pursuant to General Statutes § 16-1(a)(20), “Class I renewable energy source”
includes energy derived from a run-of-river hydropower facility that received a new
license after January 1, 2018, has a generating capacity of not more than 60 megawatts,
is not based on a new dam or a dam identified as a candidate for removal, and meets
applicable state and federal requirements, including state dam safety requirements and
applicable site-specific standards for water quality and fish passage.
III.
AUTHORITY ANALYSIS
As provided in the Application, Rollinsford generates electricity using hydropower.
The Project is located on the Salmon Falls River in Rollinsford, New Hampshire.
Rollinsford originally began commercial operation on September 1, 1981, and received
an Order Issuing Subsequent License from FERC on June 16, 2022 (Subsequent
Docket No. 26-09-12
Page 2
License). The Subsequent License requires the Project to operate in a run-of-river mode
whereby outflow to the project always equals inflow.
Rollinsford has an installed capacity of 1.5 MW. The Project's NEPOOL GIS
Identification Number is MSS906. Rollinsford is a grid-connected generation facility
located in New Hampshire, which is within the control area of the ISO-NE.
According to its Subsequent License, the Project is not based on a new dam or a
dam identified as a candidate for removal. Rollinsford meets all applicable requirements,
including state dam safety requirements and applicable site-specific standards for water
quality and fish passage.
IV.
CONCLUSION
The Authority reviewed all information in the record and finds that pursuant to
General Statutes § 16-1(a)(20), the Facility qualifies as a Class I renewable energy
source, effective July 1, 2026. The Authority assigns the Facility Connecticut
Renewable Portfolio Standard Registration No. CT260912.
The Authority’s determination in this docket is based on the information
submitted by the Company. The Authority may reverse its ruling or revoke the
Company’s registration if any material information provided proves to be false or
misleading. The Company is reminded that it is obligated to notify the Authority within
10 days of any changes to any of the information it has provided.
DOCKET NO. 26-09-12
APPLICATION OF GREEN MOUNTAIN POWER
CORPORATION
FOR
QUALIFICATION
OF
ROLLINSFORD HYDRO, SALMON FALLS RIVER,
ROLLINSFORD, NH AS A CLASS I RENEWABLE
ENERGY SOURCE
This Decision is adopted by the following Commissioners:
Thomas H. Wiehl
Holly H. Cheeseman
David Arconti, Jr.
Janice A. Beecher
Everett Smith, III
CERTIFICATE OF SERVICE
The foregoing is a true and correct copy of the Decision issued by the Public
Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail
to all parties of record in this proceeding on the date indicated.
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
October 28, 2026
Date