Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-002 Page 1 of 2 Date Filed: September 22, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Interconnection Customer Coalition Question: Reference ICC-1. Since January 1, 2020, provide all versions of the Eversource Interconnection Policies, including: • • • • Date of Revision Summary of Inclusions/Deletions Rationale for Inclusions/Deletions The review and approval process for finalization of each version Response: The Company and United Illuminating Company (together, the “EDCs”) maintain three joint, PURA-approved interconnection documents as shown in Table 1. The EDCs revise these documents pursuant to PURA order. Revisions are prepared jointly by the EDCs, and PURA generally requires clean and redlined versions showing every insertion and deletion to be filed for review and approval. PURA may also require stakeholder review and input, which typically occurs in the Interconnection Working Group established in Docket No. 17-12-03RE06, prior to such filing for review and approval. Following PURA approval, the EDCs implement the approved Guidelines in PowerClerk and post the clean version on their respective interconnection webpages. Table 1. Three Joint Documents, current Approved Versions Document Current version Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 50 kW (AC) or Less (Refer to ICC-001, Attachment 1) April 11, 2025 Guidelines for Generator Interconnection Excluding Residential Inverter Based Projects Level 1 50 kW or Less (Refer to ICC-001, Attachment 2) September 1, 2026 Exhibit B Generator Interconnection Technical Requirements (Refer to ICC-001, Attachment 3) April 11, 2025 Major Rev / October 1, 2025 Minor Rev
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-002 Page 2 of 2 The 2019 document versions shown in Table 2 below were in effect on January 1, 2020. Since then, revisions to these documents have been filed in Docket Nos. 17-12-03RE06, 22-06-29, 2206-29RE01, 24-08-05, 25-01-27, and 25-08-05. Table 2. Versions in Effect on January 1, 2020 Document Version then in effect Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 20 kW (ac) or Less (Refer to ICC-002, Attachment 1) April 8, 2019 Guidelines for Generator Interconnection Fast Track and Study Processes Excluding Inverter Based Projects 20 kW and Less (Refer to ICC-002, Attachment 2) April 8, 2019 Exhibit B - Generator Interconnection Technical Requirements (Refer to ICC-002 Attachment 3) April 8, 2019

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)