Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-001 Page 1 of 1 Date Filed: September 22, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Interconnection Customer Coalition Question: Reference Exhibit CLP-ELP-1 at Page 109 and Exhibit CLP-CUSTOMER-1 at 34. Provide the currently operative versions of any Connecticut Light and Power Company governing documents related to the interconnection process, including, but not limited to, the Generator Interconnection Technical Requirements, the Information & Requirements for Electric Supply (a/k/a the “Yellow Book”) and any other documents that specify interconnection timelines (together referred to herein as the “Eversource Interconnection Policies”). Response: Please refer to ICC-001, Attachment 1 through ICC-001, Attachment 5, for the prevailing version of the documents at the time of this filing. The attachments are relevant to requirements specifically as it pertain to interconnecting a generator in parallel to the grid and do not represent any specific requirements of tariffs or incentive structure the interconnecting generator may be a participant of, for example, but not limited to, the RRES, NRES, or SCEF programs; each specific programs requirements and customer contract should be evaluated separately from the attachments in this response. These documents are made publicly available and are amended or revised from time to time. Listing of attachments: • ICC-001, Attachment 1: Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 50 kW (AC) or Less • ICC-001, Attachment 2: Guidelines for Generator Interconnection Excluding Residential Inverter Based Projects Level 1 50 kW or Less • ICC-001, Attachment 3: Exhibit B Generator Interconnection Technical Requirements • ICC-001, Attachment 4: Technical Interconnection and Interoperability Requirements for Distributed Energy Resources (DERs) • ICC-001, Attachment 5: Information & Requirements for Electric Supply: CT 2024 Edition

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)