Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

  1. Page 1 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 1 of 27 Eversource Energy and The United Illuminating Company Exhibit B - Generator Interconnection Technical Requirements April 8, 2019
  2. Page 2 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 2 of 27 Table of Contents 1. SCOPE ................................................................................................................................................................ 3 2. GENERAL CONSIDERATION ........................................................................................................................ 3 2.1 2.2 2.3 2.4 2.5 2.6 3. GENERAL REQUIREMENTS ............................................................................................................................. 3 ADVERSE IMPACT OF GENERATING FACILITY ................................................................................................. 3 SAFE OPERATION AND MAINTENANCE............................................................................................................ 3 ISOLATION DEVICES ...................................................................................................................................... 3 FACILITY ACCESS AND CONTACT INFORMATION ............................................................................................. 4 FUTURE SYSTEM CHANGES AND RESPONSIBILITIES ......................................................................................... 4 GENERAL DESIGN REQUIREMENTS .......................................................................................................... 4 3.1 INTERCONNECTION TRANSFORMER WINDING AND GROUNDING CONSIDERATIONS (CONFIGURATION, FERRORESONANCE, ETC.) .......................................................................................................................................... 4 3.2 POWER QUALITY REQUIREMENTS .................................................................................................................. 4 3.3 VOLTAGE REGULATION ................................................................................................................................. 5 3.4 INSULATION COORDINATION .......................................................................................................................... 6 3.5 GROUNDING AND BONDING ........................................................................................................................... 6 3.6 ARC FLASH ................................................................................................................................................... 6 4. PROTECTION AND CONTROL REQUIREMENTS...................................................................................... 7 4.1 4.2 4.3 4.4 4.5 5. GENERATOR PROTECTION PHILOSOPHY .......................................................................................................... 7 GENERAL REQUIREMENTS ............................................................................................................................. 7 ADDITIONAL REQUIREMENTS FOR INVERTER-BASED INSTALLATIONS ............................................................ 10 ADDITIONAL REQUIREMENTS FOR INDUCTION GENERATORS ......................................................................... 11 ADDITIONAL REQUIREMENTS FOR SYNCHRONOUS GENERATORS ................................................................... 11 4.6 CLOSED TRANSITION GENERATORS ........................................................................................................ 12 4.7 OPEN TRANSITION GENERATING FACILITIES ........................................................................................... 13 4.8 SPECIAL PROTECTION SYSTEMS .............................................................................................................. 13 4.9 PROTECTION SYSTEM CHANGES ............................................................................................................. 14 4.10 UNDERFREQUENCY PROTECTION .......................................................................................................... 14 INTERCONNECTING GENERATORS WITH NETWORK SYSTEMS ..................................................... 15 5.1 AREA NETWORKS .................................................................................................................................. 15 5.2 SPOT NETWORKS ................................................................................................................................... 15 6. METERING, MONITORING AND COMMUNICATION ............................................................................ 16 6.1 COMMUNICATIONS CHANNELS AND SCADA .......................................................................................... 16 6.2 METERING AND RELATED EQUIPMENT IN GENERAL ................................................................................ 16 6.3 CL&P-SPECIFIC REQUIREMENTS FOR REVENUE METERING AND RELATED EQUIPMENT ............................ 17 6.4 UI-SPECIFIC REQUIREMENTS FOR METERING AND RELATED EQUIPMENT ................................................. 18 7. TESTING AND MAINTENANCE REQUIREMENTS .................................................................................. 19 7.1 WITNESSING OF COMMISSIONING TEST ................................................................................................... 20 7.2 PERIODIC TESTING ................................................................................................................................. 20 7.3 SAFE OPERATIONS AND MAINTENANCE .................................................................................................. 21 8. STANDARDS AND APPLICABLE GUIDELINES (IEEE, UL, ANSI, ETC.) ............................................... 21 APPENDIX A ................................................................................................................................................ 22 APPENDIX B ................................................................................................................................................ 25 APPENDIX C --ADDITIONAL REQUIREMENTS FOR INVERTER-BASED INSTALLATIONS ....................................... 26 C.1. Inverter voltage trip settings .................................................................................................................... 26 C.2. Inverter frequency trip settings ................................................................................................................ 26 C.3. Inverter Voltage Ride-through Capability and Operational Requirements ................................................ 26 C.4. Inverter frequency ride-thru capability .................................................................................................... 27 C.5. Grid support utility interactive inverter function status ............................................................................ 27
  3. Page 3 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 3 of 27 1. Scope These Generator Interconnection Technical Requirements (“Technical Requirements”) apply to the Interconnection of a Generating Facility to the EPS, regardless of federal or state jurisdiction. These Technical Requirements provide requirements relevant to the safety, performance, reliability, operation, design, protection, testing, metering, and maintenance of the Interconnected Generating Facility. Among other things, these Technical Requirements are particularly focused on the safety of the general public and the employees and equipment of the EDC. All capitalized terms shall have the meanings specified in the glossary set forth in Attachment XI to the Guidelines for Generator Interconnection: Fast Track and Study Processes. 2. General Consideration 2.1 General Requirements 2.1.1 Any Generator desiring Interconnection with the EPS or modification of an existing Interconnection must meet the specifications set forth in this section and any other requirements which may be imposed by the EDC, including without limitation: 2.1.1.1 Latest approved version of the IEEE 1547 (Standard for Interconnecting Distributed Resources with Electric Power Systems) and associated 1547 standard and family of guidelines or recommended practices. 2.1.1.2 Latest approved version of UL (Underwriters Laboratories) 1741 (Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources). 2.1.1.3 Latest approved version of UL 1741 SA (Supplement A) 2.2 Adverse Impact of Generating Facility Unintentional Islanding by the Generating Facility of all or part of the EPS (meaning a part of the EPS is kept energized by the Generating Facility after the EPS has de-energized the area) is prohibited as it may result in unsafe conditions on the EPS. The Generator shall comply at all times with Section 6 of the Interconnection Agreement. 2.3 Safe Operation and Maintenance The Generator shall operate and maintain the Generating Facility in accordance with Good Utility Practice and comply with all aspects of the Interconnection Agreement and applicable Guidelines and tariffs, terms and conditions. Moreover, the Generator shall comply, at all times, with all applicable laws, regulations and other legal requirements. In the event that the Generating Facility may pose an unreasonable risk to the EPS, the Interconnection Agreement provides that (a) the EDC may install equipment to monitor the Generating Facility and (b) the EDC may disconnect the Generating Facility as set forth in the Guidelines. 2.4 Isolation Devices 2.4.1 Low Voltage Applications (<= 600 volts): For voltages equal to or less than 600 volts on the EPS, the Generator shall own, install, operate and maintain an external Isolation Device (or comparable device mutually agreed upon by the parties) for the Generating Facility that can be opened for isolation. The Isolation Device shall be operated by the Generator’s personnel and shall be in a location easily accessible by EDC personnel at all times. The Isolation Device shall: (i) be gang operated; (ii) have a visible break when open; (iii) be rated to interrupt the maximum Generator Facility output; and (iv) be capable of being locked open. Although EDC personnel will normally not operate the Isolation Device, the EDC reserves the right to have its personnel open the Isolation Device in an emergency. If an existing Isolation Device at the Generating Facility meets the requirements of this section, then this requirement of an additional Isolation Device may be waived by the EDC.
  4. Page 4 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 4 of 27 The Generator shall maintain the Isolation Device in good working condition. The EDC shall not be responsible for any damage to the disconnect switch or the Isolation Device. 2.4.2 High Voltage Applications (> 600 volts): The EDC shall own, install, operate and maintain the Isolation Device when the Isolation Device is required to be installed at voltages greater than 600 volts on the EPS. The EDC will determine the size, type and rating of such Isolation Device. An existing Isolation Device, if deemed adequate for the application by the EDC, may be sufficient. If a new Isolation Device is required, then the cost of such device, including the installation thereof, will be borne by the Generator. 2.5 2.6 Facility Access and Contact Information 2.5.1 Emergency Reporting. In accordance with Section 6.4.1 of the Interconnection Agreement, the EDC and the Generator shall each provide to the other (and shall update as necessary) a telephone number that can be used at all times to allow the other to report an emergency. 2.5.2 Access to EDC Equipment and Facilities. In accordance with Section 6.4.2 of the Interconnection Agreement, the Generator shall allow the EDC access to the EDC’s equipment and the EDC’s facilities located on the Generating Facility’s premises. 2.5.3 Access to Isolation Device. In accordance with Section 6.4.3 of the Interconnection Agreement, the EDC shall have access to the Isolation Device of the Generating Facility at all times. Future System Changes and Responsibilities The EPS is dynamic and must be able to accommodate future load growth and system changes. Therefore, the EDC may, at its discretion and cost, make upgrades to the EPS. Such upgrades may have an impact on existing Generator Facilities and/or Interconnection Facilities. To ensure continued safe operations in compliance with the Interconnection Agreement, the Generator Facilities and/or Interconnection Facilities may need to be upgraded in accordance with the upgraded EPS. The Generator and the EDC will work together and cooperatively to implement the appropriate changes, upgrades, etc. to attain the common goal of continued safe and reliable operation of the interconnection of the Generator to the EPS. 3. General Design Requirements 3.1 Interconnection Transformer Winding and Grounding Considerations (Configuration, Ferroresonance, etc.) In order to provide maximum operating flexibility for the Generator and to minimize possible adverse effects on the facilities of other EDC customers, the Generator shall provide, at its sole cost and expense, an interconnection transformer between the Generating Facility and the EDC-owned equipment, unless this requirement is waived in writing by the EDC in its sole discretion. The Generator shall propose to the EDC an interconnection transformer and grounding configuration, which shall be subject to the approval of the EDC at its sole discretion. The final winding connection and grounding configuration is subject to the approval of the EDC at its sole discretion. 3.2 Power Quality Requirements 3.2.1 The Generating Facility and its Interconnection system shall not inject DC current greater than 0.5% of the full rated output current at the POI. 3.2.2 The Generating Facility shall not create objectionable flicker to other EDC customers. 3.2.3 Harmonics. When the Generating Facility is serving linear loads, harmonic current injection into the EPS at the PCC shall not exceed the limits listed below under the following test conditions: • Serving balanced linear loads
  5. Page 5 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 5 of 27 • No voltage distortion present Individual harmonic order h (odd harmonics) h < 11 11 ≤ h < 17 17 ≤ h < 23 23 ≤ h < 35 35 ≤ h Total demand distortion (TDD) Maximum harmonic current distortion limit as a percent of current (I) * 4.0% 2.0% 1.5% 0.6% 0.3% 5.0% Even harmonics are limited to 25% of the odd harmonic limits set forth above. * where I = the greater of the Local EPS maximum load current integrated demand (15 or 30 minutes) without the Generating Facility, or the Generating Facility rated current capacity (transformed to the PCC when a transformer exists between the Generating Facility and the PCC). 3.3 3.2.4 The Interconnection of the Generating Facility shall not increase the potential for ferroresonance in the EPS. 3.2.5 The Interconnection of the Generator Facility shall not cause temporary undervoltages or overvoltages. 3.2.6 An Induction Generator may be connected and brought up to speed as an induction motor if it can be demonstrated that the initial voltage drop (visible flicker) is acceptable and within limits as defined by IEEE 519. When flicker occurs, outside of the IEEE 519 limits, soft starting will be required, such as speed matching to within 1% of synchronous speed or other techniques. Voltage Regulation The Generating Facility shall not: (i) actively regulate the voltage of the EPS unless specifically agreed by the EDC; (ii) cause the voltage at any point along the EPS to deviate from the levels prescribed by the exemption to the upper voltage variation established by the Public Utilities Regulatory Authority by way of Decision, dated March 6, 2019, in Docket No. 03-01-15RE04 or the voltage limits established in Conn. Agencies Regs. § 16-11-115(a), whichever limits are greater (currently +5/-5% for residential and commercial customers ; or (iii) cause any voltage deviations, which are objectionable to other customers of the EDC. The EDC may regulate the voltage on the EPS by employing load tap changing transformers or line voltage regulators. These devices are typically designed for one-way (forward) power flow to properly regulate the voltage. Therefore, unless specifically waived in writing by the EDC, the Generating Facility shall be required to limit its output so that reverse power flow cannot occur when the proposed Interconnection would be expected to result in reversed power flow through a load tap changing transformer absent such limitation. When the proposed Interconnection is expected to result in reverse power flow through line voltage regulators, control modifications necessary to mitigate the effects of the reverse power flow may be made, if practical, at the sole cost and expense of the Generator. Otherwise, the Generating Facility will be required to limit its output so that adverse levels of reverse power flow cannot occur. 3.3.1 VAR (Power Factor) 3.3.1.1 All Generators other than Induction Generators shall be capable of operating within a power factor range of 0.9 leading to 0.9 lagging. Unless specifically determined
  6. Page 6 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 6 of 27 through studies performed by the EDC and as may be specified in the Interconnection Agreement, the power factor as measured at the PCC shall be within such range. If the power factor is outside of this range the method and compensation for power factor correction shall be determined by the EDC. 3.3.1.2 The VAR requirements for Induction Generators shall be determined by the EPS. For aggregate generation of up to and including 100 kW, there will be no charge to the Generator. For aggregate generation greater than 100 kW, the EDC shall charge the Generator a one-time “capacitor charge” to cover the cost of supplying the reactive current to the Generating Facility. This “capacitor charge” shall be based on 0.5 kVAR of capacitors per kW of generator nameplate capacity and will be based on the prevailing rate of installed cost per KVAR by utility grade equipment. 3.4 Insulation Coordination The Generating Facility and all other equipment connected to the EPS (even in closed transition mode) must be able to withstand the normal and abnormal voltages that can be experienced on the EPS (i.e., normal and abnormal voltages shall not cause damage to or reduce the reliability of any connected equipment). The Generator shall be responsible for procuring equipment with a level of insulation and fault withstands capability compatible with the grounding method specified below. BIL (Basic Impulse Insulation Level) Equipment connected to the EPS must be designed with a certain minimum Basic Impulse Insulation Level (BIL). BIL, in general terms, is a measure of the ability of a piece of equipment to withstand normal and abnormal voltages. Lightning and switching of equipment are two common sources of high abnormal voltage transients. The following table represents minimum BIL levels of equipment connected to the EPS: Circuit Voltage (kV) Voltage Class (kV) 2.4 2.5 4.16 5.0 4.8 5.0 8.32 8.7 11.45 15.0 13.2 15.0 13.8 15.0 23.0 25.0 27.6 35.0 34.5 35.0 Minimum BIL (kV) 60 60 75 75 95 95 95 125 150 200 The Generator shall ensure that the BIL of all the installed equipment meets the applicable standards set forth above, as well as applicable UL, ANSI and IEEE standards. Furthermore, such equipment shall be installed in compliance with all applicable local, state and federal codes. 3.5 Grounding and Bonding The grounding scheme of the Generating Facility Interconnection shall not cause overvoltages that exceed the rating of the EDC’s equipment connected to the EPS and shall not disrupt the coordination of the ground fault protection on the EPS. 3.6 Arc Flash The interconnection of a Generating Facility to the EPC system shall not increase available fault current and associated arc flash energy to a level where EPC workers would have to use the next level of enhanced Personal Protective Equipment (PPE) and/or restrictive work methods above and beyond
  7. Page 7 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 7 of 27 what the workers would normally use for work at the same location without the Generating Facility present. 4. Protection and Control Requirements 4.1 Generator Protection Philosophy One of the core objectives of these Technical Requirements is to protect the public, EDC personnel and the EPS from unsafe or unstable operating conditions. Therefore, much of the focus of these Technical Requirements is on the use of protective functions designed to prevent the Generating Facility from causing a system failure or propagating disturbances onto the EPS during normal operations. Such requirements are designed solely to protect the public (and EDC employees) and the EPS, and are not designed to protect the Generating Facility or the Generator’s other facilities and equipment. The Interconnection of the Generating Facility to the EPS will not be allowed to degrade the reliability of the EPS either as a result of its operation or as a result of changes to the EPS to accommodate the Interconnection. From time to time, protective relays and microprocessors used in protective relays and inverters must be removed from service for maintenance, testing, and revision upgrades. During such times, the Generating Facility shall not operate in parallel with the EPS without adequate protection in service and functioning as approved. Additionally, for firmware upgrades, the EDC may require witness testing by the EDC to determine the success of any such upgrade. The Generating Facility is required to review any such upgrade with the EDC before any such upgrade is attempted. 4.2 General Requirements 4.2.1 Section 2.1 of these Technical Requirements is generally applicable to all of these Technical Requirements, and should be reviewed in concert with Section 4. 4.2.2 The specifications and requirements listed herein are intended solely to mitigate possible adverse impacts caused by the Generating Facility to the EDC’s equipment and to the reliability of its EPS as well as to protect the safety of the EDC’s personnel, the general public, and other customers of the EDC. They are not intended to address protection of the Generating Facility itself or internal load on the Generating Facility side of the PCC. It is the responsibility of the Generator to comply with the requirements of all appropriate standards, codes, statutes and authorities to protect itself and its loads. The Generator must be aware of the risk of single phasing and of voltage transients (and other normal system disturbances as described herein) that accompany Interconnection with the EPS. In accordance with the Interconnection Agreement, it is the Generator’s responsibility to protect the Generating Facility from these risks. 4.2.3 The EDC shall make available to, upon request, system protection information directly related to the Point of Interconnection, which information may be used by the Generator solely to evaluate protection of its Generating Facility during parallel operation and for no other purpose. 4.2.4 The design of the Generating Facility’s protection and control scheme shall take into account the EDC’s practice of automatically reclosing portion(s) of its EPS without synchronism check after one or more portion(s) of the EPS have been tripped. The de-energized portion of the EPS may be re-energized at any time after de-energization. If the EDC’s reclosing practices are found to be incompatible with the Interconnection of the Generating Facility, the EDC may choose to modify the EPS to accommodate that Interconnection, which modification shall be at the Generator’s sole cost and expense. 4.2.4.1 Unless otherwise agreed by the EDC, if the Generating Facility has been tripped off-line, then the Generating Facility’s control system shall not permit the Generating Facility to be reconnected to the EPS for at least five (5) minutes after normal system conditions are re-established.
  8. Page 8 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 8 of 27 4.2.4.2 The Generating Facility shall be designed to accommodate reclosing of the EPS even if no reclosing exists at the time of Interconnection. If the Generating Facility’s protection cannot be designed to be compatible with the EDC’s reclosing practices, other anti-Islanding measures will be required at the Generator’s sole cost and expense (e.g., a dedicated circuit supply or direct transfer trip protective relaying from all EDC sources and isolation points). 4.2.5 Protective relays required by these Technical Requirements shall either be Utility Grade or certified to UL1741/UL 1741 SA and IEEE C62.41 and IEEE C62.45, as amended from time to time. Equipment tested to UL 1741/UL 1741 SA after the May 7, 2007 date need only prove compliance with UL 1741/1741 SA. The time characteristics of these relays must be reviewed and approved by the EDC prior to purchase by the Generator in order to achieve coordinated timing with the EDC’s protective devices. 4.2.6 The Generating Facility shall not operate in parallel with the EPS without properly functioning protective equipment required by these Technical Requirements. 4.2.6.1 Generating Facilities (of less than or equal to 1 MW in size) are not required to provide redundancy in protective functions. However, if such a Generating Facility desires to operate in parallel with the EPS with its required protective equipment out of service, the design of that facility shall include redundant protection functionality installed in parallel to facilitate the removal of that protective relaying from service for any reason. 4.2.6.2 Generating Facilities (above 1MW in size) shall be designed in a manner such that the Generating Facility protection shall provide sufficient redundancy in protective function(s) so that no single protective equipment failure can remove any protective function required by the EDC. 4.2.7 The EDC has adopted UL 1741and UL 1741 SA (including IEEE C62.41) for certifying the electrical protective functionality of independent power systems, including Generating Facilities. UL 1741/1741 SA compliance may be established by UL or other Accredited, Nationally-Recognized Testing Laboratories. The EDC also accepts inverter-based Generating Facilities that are installed in multiple packs and that have been certified to UL 1741/1741 SA in this configuration. 4.2.8 Generating Facilities that are not intended to export power to the EPS, but which are capable of exporting power, must include either (i) a reverse power (32R) or (ii) under-power (32U) relay or (iii) a corresponding function in a multifunction microprocessor. A reverse power element (32R) operates whenever power is exported from a Generating Facility onto the EPS for periods beyond those expected during normal system transient conditions. An underpower element (32U) ensures the Generating Facility is always importing some preset level of power. If the import level drops below the “under-power” threshold, then the element will operate to trip the Generating Facility. The under-power element (32U) must be used in cases where a reliable (32R) (export trip) cannot be guaranteed. (See Appendix A for recommended settings). It is recognized that for business model reasons, for technical reasons such as limitations in an existing facility, or for process reasons such as the acceleration of the application approval or reduction in studies required, the Generator may choose to operate the facility exclusively in a non-export mode. 4.2.9 The Generator shall submit to the EDC for review and acceptance the settings for all devices with protection functions that could affect the Interconnection. These devices include all relays, adjustable inverters and controllers that provide protective functions used for EDCrequired protection. These settings shall be provided to the EDC no later than twenty (20) Business Days prior to the scheduled date for setting those relays/inverters/controllers. The
  9. Page 9 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 9 of 27 Generator shall provide both a paper and an electronic copy of the setting file for all settings within any electronic multifunction relay. The Generator must also provide the most recent revisions to the schematics and wiring diagrams listed in Attachment I to the applicable Guidelines (“Interconnection Request”). The Generator shall also submit to the EDC a written description of the operation as programmed for each of the protective relay schemes that could affect the Interconnection. Each such protective relay scheme description shall list all inputs to the protective relay, the function(s) performed on these inputs, and a list of all outputs driven by the relay. The vendor instruction manual will not be acceptable for this purpose. 4.2.10 Over-and under-voltage and over-and under-frequency protective relay functions are required for all Generating Facilities interconnected to the EPS. This requirement also applies to closed transition transfer schemes that result in the Generating Facility operating in parallel to the EPS for 100 milliseconds or longer. Voltage sensing on all three phases shall be used for the required voltage relaying for maximum sensitivity for phase disturbances. 4.2.11 All protection functions required by the EDC for protection of its EPS shall be designed in such a way that a loss of AC power will not compromise that protection. Acceptable methods include but are not limited to: undervoltage trip, DC battery systems, and UPS systems. 4.2.12 An Interconnection interrupting device such as a circuit breaker or contactor shall be installed to isolate the Generating Facility from the EPS. All such Interconnection interrupting devices must be capable of interrupting the maximum available short circuit current and the current produced when the Generating Facility is connected out of phase. For the avoidance of doubt, if the Generating Facility has multiple interrupting devices, this requirement applies to each such device. 4.2.13 An interconnection circuit breaker equipped with all appropriate protective devices defined in this document shall be located at the PCC in addition to any required interrupting device(s) and protection devices required at the generator. However, if a Generator meets certain requirements, the EDC may elect to waive the separate protection devices at the PCC. In order for the EDC to consider waiving the separate protection devices at the PCC all of the following conditions must be met: (unless waived by the EDC). (a) Total Generation Facility Capacity is less than 1MW. (b) Generation Facility Capacity is less than 1/3 of its total minimum load. (c) Generating Facility is designed as a net-import facility at all times (no power exported to EPS). (d) Generator has interrupting and protection devices meeting all other requirements in this document. 4.2.14 Voltage relays that can be connected directly to the Generating Facility’s line voltage without a voltage transformer (VT) are acceptable to the EDC. 4.2.15 Unless otherwise agreed by the EDC in writing, protective relay schemes shall be hardwired to the device they are tripping. Test switches are required in the current, voltage and trip circuits. 4.2.16 Current Transformer (CT) ratios and accuracy classes for CTs as used in the Generating Facility protection shall be consistent with ANSI and IEEE standards. 4.2.17 Voltage Transformers The Generating Facility shall be equipped with a direct voltage connection or a VT, which shall be connected to the EDC’s side of the interrupting device. For three-phase applications, a VT for each phase is required. If the interconnecting voltage transformer is ungrounded at the EDC voltage, this VT shall be a single three-phase device or three single-phase devices
  10. Page 10 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 10 of 27 connected from each phase to ground on the EDC’s side of the Generating Facility’s interconnecting transformer, rated for phase-to phase voltage. The secondary winding shall be connected in open delta, have a loading resistor to prevent ferroresonance, and supply a zero sequence over-voltage relay. On one side of the relay/resistor, the connection shall be grounded. Relays that (i) are capable of calculating zero-sequence voltages, and (ii) can be directly connected at the utilization voltage, may be utilized in lieu of grounded-wye to open delta VTs. 4.3 Additional Requirements for Inverter-Based Installations Current inverter systems are capable of performing many of the required protective functions internally, without the need for additional protective equipment. Therefore, additional standards are applicable to inverter-based technologies. Two external standards shall apply to inverter-based Interconnections: (1) IEEE Standard 1547, (Standard for Interconnecting Distributed Resources with Electric Power Systems): and (2) UL Standard 1741 and UL Standard 1741 SA, “Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources.” These standards set forth the nominal voltage and frequency parameters that must be met and the limits allowed for anomalies such as flicker and interference, as well as the time allowed for disconnection when the required parameters are no longer being met or for reconnection following a system failure or automatic disconnection. The EDC recognizes the concept of “Type Certification” (sometimes called pre-certification) which requires that the inverter-based units undergo standardized testing, usually by an Accredited Nationally Recognized Testing Laboratory (e.g., Underwriter’s Laboratory), and that the results of those tests be made publicly available. Type certified units typically must also be “listed” by the laboratory and the equipment labeled as such. Advanced inverters also provide grid support functionality and can assist with resource availability in the event of a bulk power system or other disturbance. As such and unless agreed upon by the EDC, inverters must also be set as per the guidance provided in Appendix C. 4.3.1 The technical requirements for certified inverter based Generating Facilities, 20kW and less, are found in a separate document, the Eversource Energy/UI “Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 20 kW (ac) or Less.” 4.3.2 The requirements of UL 1741/1741 SA may be applied to inverters with photovoltaic and other electric energy sources. An inverter is considered approved if it is certified to the UL 1741/1741 SA testing procedure and it has passed the required tests without failure to comply with IEEE C62.41 and C62.45. Proof of certification under UL1741/1741 SA and compliance with IEEE C62.41, and C62.45 shall be required. As of May 7, 2007, UL 1741 includes the requirements within it of IEEE C62.41, and C62.45. Therefore, equipment tested to UL 1741/1741 SA after that date need only prove compliance with UL 1741/1741 SA. 4.3.3 It is the Generator’s responsibility to submit written evidence that the proposed Generating Facility has been UL 1741/1741 SA certified. Generators should contact the Generating Facility’s supplier to determine if it has been listed. 4.3.4 Non-certified inverters must have either non-islanding or anti-islanding protection as defined by IEEE 1547 and conform to the maximum harmonic limits prescribed in IEEE 519. Noncertified inverters must be protected by certified or Utility-Grade Relays, using settings approved by the EDC. 4.3.5 Self commutated inverters with external frequency sensing may be used to synchronize the Generating Facility with the EPS. The following requirements apply to such inverters:

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026