Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

  1. Page 21 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 21 of 74 SECTION 5 5.4.2 If potential adverse distribution system impacts are identified at the Scoping Meeting or in the Feasibility Study, then a Distribution System Impact Study shall be required. If a Distribution System Impact Study is required, then the Interconnecting EDC shall send the Generator a Distribution System Impact Study Agreement within fifteen (15) Business Days of (a) transmittal of the results of the Feasibility Study (if performed) or (b) the Scoping Meeting (if no Feasibility Study is performed), including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study. 5.4.3 If potential adverse transmission system impacts are identified, the Interconnecting EDC shall send the Generator a Transmission System Impact Study Agreement within five (5) Business Days following transmittal of the Study results of the Feasibility Study or the Distribution System Impact Study, as the case may be, including an outline of the scope of the Transmission System Impact Study and a non-binding good faith estimate of the cost to perform the Transmission System Impact Study. 5.4.4 If a Transmission System Impact Study is not required, but EPS adverse system impacts are shown by the Feasibility Study to be possible and no Distribution System Impact Study has been conducted, the EDC shall send the Generator a Distribution System Impact Study Agreement. 5.4.5 If the System Impact Study(ies) shows no potential for adverse impacts to the transmission system or the distribution system, then the EDC shall send to the Generator for execution either (a) a Facility Study Agreement, including an outline of the scope of the study and a non-binding good faith estimate of the cost to perform the study, or (b) an Interconnection Agreement, as applicable. 5.4.6 In order to remain under consideration for Interconnection and in the Interconnecting EDC’s Interconnection queue, the Generator must return executed System Impact Study Agreements, if applicable, within thirty (30) Business Days of receipt of same from the Interconnecting EDC. 5.4.7 A payment of the good faith estimated System Impact Study costs shall be required in full from the Generator prior to initiation of the System Impact Studies. 5.4.8 The scope of and cost responsibilities for a System Impact Studies are set forth in the applicable System Impact Study agreement. 5.4.9 Any Affected Parties shall be invited to participate in the System Impact Studies and provide information necessary or helpful to complete the System Impact Studies. 19
  2. Page 22 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 22 of 74 SECTION 5 5.5 Facility Study 5.5.1 Once the required System Impact Studies, if any, are completed, the Interconnecting EDC shall prepare a System Impact Studies report and provide a copy of such report to the Generator along with a Facility Study Agreement within five (5) Business Days of completion of the System Impact Studies, including an outline of the scope of the Facility Study and a non-binding good faith estimate of the cost to perform the Facility Study. 5.5.2 Within five (5) Business Days following receipt of the report described in Section 5.5.1, the Generator shall notify the Interconnecting EDC in writing as to whether it will either pursue the Facility Study or waive the Facility Study and elect an expedited Interconnection. 5.5.2.1 If the Generator waives the Facility Study, it shall commit to the following milestones in the Interconnection Agreement: (a) siting approval by the appropriate regulatory authorities for the Generating Facility and Interconnection Facilities; (b) engineering of Interconnection Facilities shall be subject to prior approval by the Interconnecting EDC; (c) the ordering of long lead time material by the EDC for Interconnection Facilities and system upgrades; (iv) an In-Service Date; and (v) Commercial Operation Date. 5.5.2.2 If the Generator does not waive the Facility Study, in order to remain under consideration for Interconnection and in the EDC’s Interconnection queue, then the Generator must return the executed Facility Study Agreement or a request for an extension of time within thirty (30) Business Days following receipt of the Facility Study from the Interconnecting EDC. Any such extension shall not exceed sixty (60) Business Days. 5.5.3 The Facility Study shall specify and estimate the cost of the equipment, engineering, procurement and construction work (including overheads) needed to implement the conclusions of the System Impact Studies. 5.5.4 Design for any required Interconnection Facilities and/or Generating Facility upgrades shall be provided for under the Facility Study Agreement. The Interconnecting EDC may contract with outside consultants to provide such design(s). The Generator, the Interconnecting EDC and any Affected Party(ies), may agree to allow the Generator to separately arrange for such design(s). In such cases, facilities design shall be subject to review and prior by the Interconnecting EDC, in accordance with the Facility Study Agreement. If the Parties agree to separately arrange for design and construction, and provided security and confidentiality requirements can be met, the Interconnecting EDC shall make sufficient information available to the Generator in accordance with confidentiality 20
  3. Page 23 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 23 of 74 SECTION 5 and critical infrastructure requirements to permit the Generator to obtain an independent design and cost estimate for any necessary facilities. 5.5.5 A payment of the good faith estimated Facility Study costs shall be required in full from the Generator prior to execution of the Facility Study. 5.5.6 The scope of and cost responsibilities for the Facility Study are described in the attached Facility Study Agreement. 5.5.7 Within thirty (30) Business Days of receipt of the Facility Study results, the Generator shall provide written notice whether it agrees to pay for the Interconnection Facilities and upgrades identified in the Facility Study. An executable Interconnection Agreement shall be tendered by the Interconnecting EDC to the Generator within five (5) Business Days of receipt of such written notice. 21
  4. Page 24 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 24 of 74 SECTION 6 6.0 Provisions That Apply to All Interconnections and Associated Applications 6.1 Reasonable Efforts The Interconnecting EDC shall make reasonable efforts to meet all time frames provided in these Guidelines; provided, however, that the Interconnecting EDC and the Generator may agree to different time frames. If the Interconnecting EDC fails to meet a deadline provided herein, it shall (a) notify the Generator, (b) explain the reason for the failure to meet the deadline, and (c) provide an estimated date by which it will complete the applicable Interconnection procedure in the process. 6.2 Dispute Resolution 6.2.1 Each Party shall attempt to informally resolve all disputes arising in connection with these Guidelines promptly, equitably and in good faith. If the Parties are unable to informally resolve their dispute, the following formal three step dispute resolution process must be followed: 6.2.1.1 Negotiation: Upon receipt of written request for formal dispute resolution, the Parties shall negotiate in good faith for up to eight (8) Business Days in an attempt to resolve such dispute. Such negotiation will take place between each Party's vice-president or other member of senior management with sufficient authority to resolve such dispute. 6.2.1.2 Mediation: If the Parties are unable to resolve such dispute through the negotiation process set forth in Section 6.2.1.1, the Parties shall attempt to resolve such dispute through non-binding mediation. Each Party shall select a mediator within five (5) Business Days and the two selected mediators will attempt to, within five (5) Business Days, select a third, mutually agreeable, mediator. After the mediators are selected, the Parties shall engage in mediation in good faith for a period of not less than thirty (30) days following commencement of such mediation. The Parties shall share the cost of mediation equally; provided, however, that each Party shall be responsible for its own legal fees incurred in connection with such mediation. 6.2.1.3 DPUC Dispute Resolution: If the Parties cannot resolve their dispute through the mediation process set 22
  5. Page 25 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 25 of 74 SECTION 6 forth in Section 6.2.1.2, then either Party may commence an action at the DPUC seeking resolution of such dispute. 6.2.2 6.3 The dispute resolution processes and time frames set forth in Section 6.2.1 may be modified by mutual written agreement of the Parties. Interconnection Metering Any metering necessitated by the use of the Generating Facility shall be installed at the Generator's expense in accordance with Applicable Reliability Standards then in effect. 6.4 Commissioning Commissioning tests of the Generator's installed equipment shall be performed pursuant to applicable Codes and Standards, and equipment manufacturers’ recommendations. The Generator shall provide a certified commissioning test procedure to the Interconnecting EDC for approval. The list below is a list of tests commonly required by IEEE 1547 and is not intended to be a list of additional testing requirements: ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ Current Transformer (CT) and CT circuit polarity, ratio, insulation, excitation, continuity and burden tests, Voltage Transformer (VT) and VT circuit polarity, ratio, insulation and continuity tests, Relay pick-up and time delay tests, Functional breaker trip tests from protective relays, Relay in-service test to check for proper phase rotation and magnitudes of applied currents and voltages, Breaker closing interlock tests, and Paralleling and disconnection operation. Anti-islanding function, if applicable. Non-export function, if applicable. Synchronizing Controls, if applicable. Proof of inability to energize dead lines. 6.4.2 The Interconnecting EDC must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests. The Interconnecting EDC will not assist in performance of, or provide equipment for the commissioning test. 6.4.3 The Interconnecting EDC will provide a Contingent Approval to the Generator, akin to the form in Attachment VII, when all EDC application review elements have 23
  6. Page 26 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 26 of 74 SECTION 6 been satisfied. When the Commissioning Test has been successfully completed the Interconnecting EDC will provide an “Approval to Energize Form” to the Generator, substantially in the form of Attachment VIII. 6.5 Periodic Interconnection Tests At the time of scheduling of a commissioning test, the Generator shall provide a written periodic Interconnection test procedure to the Interconnecting EDC. (Such procedures are typically provided by the equipment manufacturer.) The procedure shall describe a test process that will verify all Interconnection-related protective functions and associated batteries are functional, but need not replicate the commissioning test procedures. The interval between periodic tests shall be specified by the manufacturer, system integrator, or the authority having jurisdiction over the Interconnection. Written test reports or a log for inspection shall be maintained by the Generator. The Interconnecting EDC may audit the Generator’s written test reports, logs and other materials regarding the Interconnection or the Generating Facility at its discretion. If the functional software or firmware of the Interconnection system has been modified or if any hardware component of the Interconnection system has been modified, replaced or repaired with parts different from the tested configuration, and if such hardware, software or firmware have not been previously approved, then the applicable commissioning tests shall be performed by an independent testing facility. If such hardware, software or firmware has been previously approved or if settings have been changed, then only the commissioning tests applicable to the changes made shall be conducted. This requirement is in accordance with IEEE 1547.2. 6.6 Confidentiality The Interconnecting EDC shall maintain confidentiality of all information of by the Generator clearly designated as “Confidential” except as otherwise required by system operators, applicable laws and regulations. In the event that the Interconnecting EDC is requested to produce such confidential information, the Interconnecting EDC shall provide advance notice to Generator, if possible, to give Generator an opportunity to seek protective treatment of such information. If such information is requested or required by the DPUC, the Interconnecting EDC will seek protective treatment of such confidential information. Confidential information does not include information that is: (a) in or becomes part of the public domain; (b) known to the Interconnecting EDC previously; (c) independently developed by the Interconnecting EDC; (d) rightfully obtained by the Interconnecting EDC from third parties without a duty of confidentiality; or (e) required to be publicly disclosed by law, statute or regulation. 6.7 Record Retention 24
  7. Page 27 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 27 of 74 SECTION 6 The Interconnecting EDC shall, at a minimum, maintain for three (3) years, subject to audit, records of all Interconnection Requests received under these procedures, the times required to complete Interconnection Request approvals and disapprovals, and justification for the actions taken on the Interconnection Requests. 6.8 Interconnection Agreement The Generator and the Interconnecting EDC shall be Parties to the Interconnection Agreement. The Interconnecting EDC shall provide an Interconnection Agreement to the Generator in accordance with these Guidelines. After the Interconnecting EDC provides an Interconnection Agreement to the Generator for execution, the Generator shall have thirty (30) Business Days or another mutually agreeable timeframe to sign and return the Interconnection Agreement. After the Interconnection Agreement is fully executed, the Interconnection of the Generating Facility shall proceed under the provisions of the Interconnection Agreement and these Guidelines. 6.9 Performance Assurance Performance Assurance will only be required in rare cases where abnormally high ongoing maintenance cost are anticipated to support the Interconnection or in unusual cases where there is a potential for wide variation between the actual and estimated costs for the Interconnection. If performance assurance is required for an Interconnection, the EDC will provide a written explanation of the reasons therefor to the Generator. 6.10 Coordination with Affected Systems If the Interconnecting EDC determines that any Interconnection Request may have an impact on other Affected Systems, the Interconnecting EDC will include representatives of such Affected Systems in all meetings and proceedings pertinent to such impact. 6.11 Generating Facility Capacity The Generating Facility Capacity, for the purpose of analysis, shall be determined as follows: 6.11.1 If the Interconnection Request is for an increase in capacity for an existing Generating Facility, the Interconnection Request shall be evaluated on the basis of the new total capacity of the Generating Facility. 6.11.2 If the Interconnection Request is for a Generating Facility that includes multiple energy production devices at a site for which the Generator seeks a single Point of Interconnection, the Interconnection Request shall be evaluated on the basis of the aggregate capacity of such multiple devices. 25
  8. Page 28 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 28 of 74 SECTION 6 6.11.3 The Interconnection Request shall be evaluated using the maximum rated capacity of the Generating Facility. 26
  9. Page 29 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 29 of 74 ATTACHMENT I INTERCONNECTION REQUEST EDC: _________________________________________________________________ Designated Contact Person: _____ Address: _____ Telephone Number: ______________________________________________________ Fax: _____ E-Mail Address: _____ An Interconnection Request is considered complete when it provides all applicable and correct information required below. Documentation of site control must be submitted with the Interconnection Request. Preamble and Instructions A Generator which requests Interconnection must submit this Interconnection Request by hand delivery, mail, e-mail, or fax to the EDC. Processing Fee or Payment: Table 1 Fees Process Generator Applicability* Fast Track (1) 0-2MW unless Generating Facility does not qualify for the Fast Track process, or (2) is 20 kW or less, certified but did not pass the 20 kW or less screen(s) Study (1) is larger than 2 MW but no larger than 20 MW, (2) is 2 MW or less and is not certified, or (3) is 2 MW or less and is I-1 Application Fee $500 Each Study Fee Actual Cost Based $1000 Actual Cost Based
  10. Page 30 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 30 of 74 ATTACHMENT I INTERCONNECTION REQUEST certified but did not pass the Fast Track. Each Generating Facility will have a One Line Diagram submitted and secured as an Attachment to the Interconnection Request (Attachment I). A one line electrical schematic is a diagram, drawing, or sketch that details the elements of a generating system, such as the elements of an electrical or electronic circuit or the elements of a logic diagram for a generator. Generating Facility Information Legal Name of the Generator (or, if an individual, individual's name) Name: Contact Person: Mailing Address: City: State: Zip: Facility Location (if different from above): Telephone (Day): _______________________ Telephone (Evening): _______________________ Fax: ____________________ E-Mail Address: _________________________________ Alternative Contact Information (if different from the Generator) Contact Name: _____________________________________________________ Title: ____________________________________________________________________ Address: ____________________________________________________________ Telephone (Day): _____________________Telephone (Evening): ______________________ Fax: __________________________________ E-Mail Address: _________________________ APPLICATION IS FOR: New Generating Facility? Yes ___No ___ I-2

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026